Search Documents

  • ISEE
    Mine optimization using Total smart mining solution

    By Chanhwi Shin, Hyeongmin Kang

    Mine optimization is a key strategy in the mining industry that focuses on improving the efficiency, productivity, and sustainability of mining operations. To achieve mine optimization, digitalization

    Jan 21, 2025

  • SME
    Mine panel failure - A case study

    By K. Morsy, S. S. Peng

    This paper deals with the causes and mechanisms of a massive pillar failure in a room-and-pillar mine. The mine employed a nine-entry panel system using supersection technique under a cover ranging fr

    Jan 1, 2002

  • CIM
    Mine Permit Surrender at Red Mountain Mines

    By Chris Carr

    This paper describes the process employed and the work undertaken to enable the surrender of the mine permit relating to the two tailings deposits at the abandoned Red Mountain Mine site near Rossland

    May 1, 2002

  • SME
    Mine Permitting Based On Post-Mining Land Use

    By A. K. Kuhn

    In virtually all jurisdictions, comprehensive environmental protection regulations or standards are in place that apply to all industries, including mining. The only other legitimate mine-permitting c

    Jan 1, 1999

  • SME
    Mine Permitting: A Lawyer's Perspective

    By R. W. Sims

    "He?s an SOB, but he's my SOB." Many of us have heard this line in reference to attorneys, and can appreciate the humor. However, the thought reflects a deeper attitude that lawyers should be use

    Jan 1, 1990

  • SME
    Mine Pillar Design in 1993 – Computers Have Become the Opiate of Mining Engineers – Part II

    By Jack Parker

    Critical width Before we go further into pillar design, we should look into the matter of "critical width," because of its effect on pillar behavior. Critical width refers to the greatest width th

    Jan 1, 1993

  • SME
    Mine Pillar Design Using the Ground Reaction Curve Concept

    By Ravi Ray, Kostas Kaklis, Zach Agioutantis

    "Modern underground mining is becoming more complex and geotechnically challenging. The engineer uses numerical, analytical, and data-driven methods (empirical and/or experimental) or their combinatio

    Jan 1, 2019

  • SME-ICGCM
    Mine Pillar Stability Analysis Using Fem Methods - Two Case Studies

    By David H. Tang

    Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite

    Jan 1, 1990

  • AUSIMM
    Mine Pit Slope Geotechnical Design

    Mine pit slopes in the Pacific Rim are a geotechnical challenge because of the complex geology in which they are developed. Mines are currently being fast-tracked to meet the increase in commodity pri

    Jan 1, 2006

  • SME
    Mine Plan Response To Western Geological Conditions

    By J. M. Mercier

    Approximately seven (7) years of recent intensive mining activity in the Wasatch Plateau Coal Field of Utah has revealed distinct geologic patterns which, at times, profoundly influence reserve estima

    Jan 1, 1984

  • SME
    Mine Plan Simulation To Evaluate The Impact Of A Remine Best Professional Judgement (BPJ) Analysis

    By L. B. Phelps

    This paper focuses on the use of an integrated mine planing software package entitled "REMINE" which was constructed to provide a project evaluation tool for analysis of remining projects. Coal remini

    Jan 1, 1990

  • CIM
    Mine Planning

    By G. Scott Zimmer

    Mine planning at Cassiar consists of an annual cycle of projection, control, evaluation and revision following completion of annual diamond drilling during the summer months . The inherent difficulty

    Jan 1, 1978

  • SAIMM
    Mine Planning (d3a3d1a4-3eb5-42a0-a100-700eebbf2b48)

    "Chairman: Professor J. Elbrond Rapporteur: Miss V. E. MartingPapers.Aids to planning production in coal mines by F. H. Deist and M. P. RobertsCapacity calculations, investment allocation and long-ran

    Jan 1, 2014

  • AUSIMM
    Mine Planning - Rate: A Key Criteria

    The mining industry has a well deserved reputation earned over the years for innovation, engineering, management and the quick application to mining of emerging technology. The cumulative result i

    Jan 1, 1989

  • CIM
    Mine planning and design integration

    By Earl Gebhardt

    The planning and design of mining panels in the Potash Corporation of Saskatchewan Inc., Lanigan Division mine Block B involved a number of investigative techniques. The techniques utilized to gain in

    Feb 1, 1993

  • CIM
    Mine planning and design integration (8b994481-1a73-40ce-ac2d-755d2a73f2cd)

    By Earl Gebhardt

    "The planning and design of mining panels in the Potash Corporation of Saskatchewan Inc., Lanigan Division mine Block B involved a number of investigative techniques. The techniques utilized to gain i

    Jan 1, 1993

  • SME
    Mine Planning And Emission Control Strategies Using Geostatistics ? Introduction

    By Francis Martino

    There are numerous techniques and predictive models used by geologists and mining engineers to define coal reserves and plan mines. The traditional reserve estimation methods commonly used include the

    Jan 1, 1983

  • AUSIMM
    Mine Planning and Geotechnical Considerations in the Development of the Western Baters of Yallourn Open Cut Mine

    By Tilley H. L

    The 90 m deep Yallourn Open Cut brown coal mine in the Latrobe Valley, Victoria is developing into an area close to a reverse fault. A major batter stabilisation program, matched to ongoing operatio

    Jan 1, 1989

  • AUSIMM
    Mine Planning and Grade Control - Goldsworthy

    By Newman H. A

    Goldsworthy Mining Limited is currently mining iron ore at an annual rate of 7 million tons from several small orebodies, each of which exhibit wide variations in iron, phosphorus, silica and alumi

    Jan 1, 1973

  • IIMP
    Mine planning and ore control data integration

    By Pabel Alvarado

    Mineral deposits with large data uses different block dimensions in Long term planning (LTP), short term planning (STP), and ore control (OC). Using applications can Re-block, Krige, Compute variable,

    Sep 1, 2017