Search Documents

  • AUSIMM
    Long-Term Monitoring of Water Infiltration Through Covers at White Æs Waste Rock Dump at the Rum Jungle Mine Site Using Lysimeters

    By A I. M Ritchie, G P. Timms

    Monitoring of water infiltration into WhiteÆs waste rock dump at the Rum Jungle mine site in the Northern Territory, Australia, started in 1983, and has since produced a unique and long-running data s

    Jan 1, 2003

  • AUSIMM
    Long-Term Performance and Cost Benefit Analysis of Passive Acid Mine Drainage Treatment Systems Installed in the Appalachian Coal Region of the Eastern United States

    By J S. Simmons, J G. Skousen

    This project evaluated the performance of nine passive treatment methods by studying 137 treatment units in eight eastern states. Performance was normalised according to construction cost, projected s

    Jan 1, 2003

  • DFI
    Long-Term Performance of a Deep Mixed Column-Wall at Arabianranta Area (Helsinki, Finland)

    By Leena Korkiala-Tanttu, Ilkka Vähäaho, Juha Forsman, Paavo Lahdenperä, Kalle Rantala, Osmo Korhonen

    "District of Arabianranta (Helsinki, Finland) has been founded on an old seabed, which was filled with miscellaneous soil materials. The subsoil consists of very low shear strength clays and organic c

    Jan 1, 2015

  • SME
    Long-Term Performance Of An Integrated Bioreactor And Wetland Treatment System At The Forest Queen Mine Site In Silverton, Co

    By S. Odell

    The Bureau of Land Management (BLM) has constructed two biochemical reactor systems (BCRs) to treat mining influenced water from the Forest Queen Mine near Silverton, CO. The bioreactors coupled with

    Jan 1, 2010

  • CIM
    Long-Term Performance of Dry Cover Systems for Reactive Mine Waste

    By David Christensen

    The long-term performance of dry covers is being examined in a research study funded by the International Network for Acid Prevention (INAP). The study was separated into two phases. The two main comp

    Nov 1, 2002

  • SME
    Long-Term Performance Of Passive Acid Mine Drainage Treatment Systems

    By P. F. Ziemkiewicz

    This project evaluated the performance of nine passive treatment methods by studying 137 treatment units in eight eastern states. Performance was normalized according to construction cost, projected s

    Jan 1, 2003

  • DFI
    Long-Term Performance Of Wind Turbine Foundations Through Numerical Modeling

    By Spencer Ness, Yazen Khasawneh, William Tjaden, Mohammad Nassim

    The evaluation of long-term performance of the wind turbine structures is essential in lowering the Levelized Cost of Electricity (LCOE) from wind sources. The required maintenance of the wind turbine

    Oct 1, 2022

  • CIM
    Long-Term Planning at Raglan

    By Lee W. T. Weitzel

    This paper reviews the Falconbridge- SMRQ?s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to

    May 1, 2002

  • CIM
    Long-term planning at Raglan (b8ce356e-c666-4ad8-a03a-11ba76659079)

    By L. W. T. Weitzel

    "This paper reviews the Falconbridge- SMRQ’s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to

    Jan 1, 2003

  • CIM
    Long-term planning of an underground mine using mixed-integer linear programming

    By G. McIsaac

    This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore z

    Sep 1, 2005

  • CIM
    Long-term planning of an underground mine using mixed-integer linear programming (3f914add-ff63-4567-994a-ce69fb049d25)

    By G. McIsaac

    "This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore

    Jan 1, 2005

  • NIOSH
    Long-Term Response Of A Coal Mine Roof To Time Lapse Between Exposure And Support

    By Daryl E. Radcliffe

    The Bureau of Mines, as part of an agreement with the Bear Coal Co., Somerset, Col o., evaluated the response of a coal mine roof to time lapse. Time lapse, the interval between exposure and support o

    Jan 1, 1980

  • AUSIMM
    Long-Term Scheduling

    This paper describes modern long-term mine scheduling and gives an example of its application. It then discusses the obstacles to the implementation of such schedules.

    Sep 26, 2011

  • SME
    Long-Term Soil Fertility Observations In Arctic Alaska

    By J. D. McKendrick

    Alaska's Arctic Slope lies between the Brooks Range and Beaufort Sea and is a region about the size of Nebraska. It has some of Alaska's richest hydrocarbon deposits. In addition to containi

    Jan 1, 1988

  • SME
    Long-Term Stability for Two-Seam Mining at OCI's Big Island Mine

    By J. F. T. Agapito

    Two flat-lying trona seams 3-to 3.5-m thick, approximately 10 m apart, and at depths of 250 m are mined by room-and-pillar at OCI's Big Island Mine in Wyoming. Continuous miners and a yielding pi

    Jan 1, 1999

  • SME
    Long-Term Stability Of Compressed Air Energy Storage Cavities In Salt Domes ? 1. Introduction

    By R. L. Thoms

    Compressed air energy storage (CAES) has been initiated recently in West Germany with a 290 MW peaking-power facility utilizing twin cavities with volumes of 150,000 m3 each in the Huntorf salt dome (

    Jan 1, 1979

  • AUSIMM
    Long-term Stability of Mine Tailings, Macraes Mine, Otago: Comparison to a Geological Analogue

    By D Craw

    Bulk ore tailings from the Macraes gold mine gold extraction process are stored in a large (ca 0.6 km2, 80 m deep) mixed tailings impoundment whose pH is maintained near 8 by natural rock neutralizing

    Jan 1, 2000

  • SME
    Long-Term Stability Of Overburden Above Room And Pillar Mines

    By Gennaro Gerald Marino

    Vast improvement in methods of design and analysis of the long- term stability of overburden above room and pillar mines is needed. Improved methods are vital for planning and land development and for

    Jan 1, 1986

  • SME
    Long-Term Subaqueous Solute Generation in Pit Lakes: Implications for Modeling and Closure

    By C. P. Newman, T. Gray, G. Beale, T. Cluff

    Predictive geochemical and limnologic modeling of pit lakes is an important aspect of modern permitting. One of the key assumptions of many predictive pit-lake models is that highwalls and pit backfil

    Jan 1, 2019

  • SME
    Long-Term Subsidence Its Causes, Development And Magnitude

    By Yi Luo

    This paper presents some of the results of a research on long-term subsidence over and near the chain pillar systems -the area available to long-term subsidence in longwall operations. Although the lo

    Jan 1, 1999