Search Documents

  • IMPC
    Load Torque Estimation for Monitoring Ball Mill Filling

    By Roberto Galéry, Braz J. C. Filho, Marcelo M. Stopa, Douglas B. Mazzinghy, Priscila M. Esteves

    "The purpose of the research is to monitor ball mill filling by means of signals usually measured in its electrical drive. The method is based on the mill torque estimated from rotor speed and inducti

    Jan 1, 2018

  • DFI
    Load Transfer And Capacity Of Drilled Shafts With Full-Depth Casing

    By Rolf Katzenbach

    Construction of drilled shaft foundations with the use of hydraulic oscillators and rotators to install temporary casing over the full depth of the shaft is described. The equipment and techniques we

    Jan 1, 2007

  • DFI
    Load Transfer Curve of Piles in Sands under Uplift Forces

    By Jogeshwar P. Singh, Aser I. Abbas, Mohamed Ashour

    The presented methodology predicts the pile head response (i.e. pile head load - displacement curve) and develops the load transfer (t-z) curve of piles in sandy soils under tension forces based on so

    Jan 1, 2018

  • SME-ICGCM
    Load Transfer Distance Calibration of a Coal Panel Scale Model: a Case Study

    By Mark K. Larson

    Calibration of LaModel for deep coal mines begins with adjustment of overburden stiffness for load transfer distance. This calibration determines whether mining induced stresses are concentrated in th

    Jan 1, 2012

  • SME-ICGCM
    Load Transfer Distance Measurements at Two Mines in the Western U.S.

    By Mark K. Larson, Douglas R. Tesarik, Heather E. Lawson

    "Load transfer distance (LTD) is simple in concept and usually evident in underground coal mines. Many people in the mining industry recognize LTD as the distance from the panel to where the mine ribs

    Jan 1, 2015

  • AUSIMM
    Load Transfer Mechanisms in Reinforcing Tendons

    By Tarrant GC

    Cement and resin encapsulated tendons are widely used in the stabilisation of mine roadways. One of the main factors in controlling the efficiency of the reinforcement is the ability of the tendon

    Jan 1, 1992

  • SME-ICGCM
    Load Transfer Mechanisms In Reinforcing Tendons (59e0902f-c551-42cd-8764-b6dda6eee4b4)

    By M. W. Fabjanczyk

    Cement and resin encapsulated tendons are widely used in the stabilisation of mine roadways. One of the main factors in controlling the efficiency of the reinforcement is the ability of the tendon to

    Jan 1, 1992

  • ISEE
    Load Transfer of Polycarbonate Blast Resistant Glazing Systems

    By Joshua Calnan, Braden Lusk, Kyle Perry

    This paper presents detailed information and data regarding the load transfer characteristics of Blast Resistant Glazing Systems utilizing two different thicknesses of polycarbonate. A series of triax

    Jan 1, 2014

  • DFI
    Load-Deformation Based Design of Deep Mixing for Supporting MSE Walls at Kitimat LNG, BC

    By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li

    "Detailed design of an extensive deep mixing (DM) scheme using the Cutter Soil Mixing (CSM) technique was completed for foundation support of mechanically stabilized earth (MSE) walls for Kitimat Liqu

    Jan 1, 2015

  • SME
    Load-Haul-Dump

    By Robert M. Stevens, Arnoldo Acuña

    INTRODUCTION In the early 1950s, underground miners and tunnel¬ing contractors were experimenting with ways to supple¬ment or eliminate track-bound loading and hauling equipment. Diesel-powered crawl

    Jan 1, 1982

  • AIME
    Loading

    By Thomas Fraser, David R. Mitchell

    THE primary purpose of the loading plant is to transfer the finished product from the preparation machines to the railroad car, truck, or barge in which it is to go to market. Secondary purposes of th

    Jan 1, 1943

  • AIME
    Loading (e55ead06-1892-4060-ae37-100ebc452351)

    By Thomas Fraser, David R. Mitchell

    THE primary purpose of the loading plant is to transfer the finished product from the preparation machines to the railroad car, truck, or barge in which it is to go to market. Secondary purposes of th

    Jan 1, 1943

  • CIM
    Loading and Blasting a Hot Pillar Remnant

    By Roland Hunt

    This paper deals with the practical problems as sociated with blasting a heated pillar remnant. This pillar remnant was the final stage in the blasting of a multi-stag e pillar blast. Production from

    Jan 1, 1977

  • TMS
    Loading And Froth Flotation Of A Chelating Ion-Exchange Resin

    By Saskia Duyvesteyn

    For many applications in hydrometallurgy and water treatment it would be advantageous to use ion-exchange resins in stirred reactors. However, attrition of the resin may lead to significant losses of

    Jan 1, 1995

  • AIME
    Loading and Hauling Equipment for use in Caving And Sublevel Stoping

    By James J. Wise

    INTRODUCTION One basic design feature utilized in all caving and sublevel stoping techniques is the drawpoint. These draw- points may be located on sublevels when using sublevel caving methods, or

    Jan 1, 1981

  • SAIMM
    Loading And Transport System At SMC - Optimization

    By M. M. D. S. Vemba

    Paper written on project work carried out in partial fulfilment of B.Sc. Eng (Mining Engineering) degree Engineering refers to the application of mathematics and other sciences to logically develop

    Jan 1, 2004

  • SME
    Loading And Unloading Unit Trains Of Coal

    By Emil Szaks

    [A great number of papers have been presented at various Engineering Society meetings on the Unit Train subject. Moat are descriptions of facilities that have been constructed or are abort to be built

    Jan 1, 1979

  • SME
    Loading Characteristics Of Gold-Bromo Species Onto Activated Carbon

    By R. K. Mensah-Biney, M. T. Hepworth, K. J. Reid

    The loading characteristics of gold-bromide species onto activated carbon were evaluated using a batch system. The overall loading of gold onto activated carbon was rapid for the first few hours, but

    Jan 1, 1994

  • SME
    Loading Characteristics Of Gold-Bromo Species Onto Activated Carbon (aa62a345-eae2-47b3-aff9-67f5cd8fbd20)

    By R. Mensah-Biney

    The loading characteristics of gold-tetrabromide species onto activated carbon have been evaluated using a completely mixed batch reactor system. The overall loading of gold onto carbon was rapid for

    Jan 1, 1992

  • TMS
    Loading Characteristics of Gold-Bromo Species onto Weak-base Anion Exchange Resin PAZ-4

    By Robert Mensah-Biney

    The loading characteristics of gold-tetrabromide species onto a weak-base resin, PAZ-4, were evaluated using a completely mixed batch reaction system. The time. to attain equilibrium loading was subst

    Jan 1, 1991