Search Documents

  • CIM
    Improvement of Climatic Conditions in the Underground Excavations in the Aspect of Types Ventilation Dams Which are Used in Sealing Abandoned Area in Polish Copper Mines.

    By R. Stach, S. Gola, P. Zgrzebski, K. Soroko

    "At the moment climatic conditions are a primary problem of the exploitation of copper ore. The efficiency of preventive actions in order to improve climatic conditions is connected with the knowledge

    Jan 1, 2019

  • AUSIMM
    Improvement of Coal and Mineral Sizing Techniques at Nippon Steel Corporation

    Sizing is fundamental technology for each step of ironmaking process. The progress of sizing technology has greatly contributed to the development of ironmaking technology. As the purposes of ironm

    Jan 1, 1984

  • SME
    Improvement Of Coal Refuse Stability

    By D. A. Augenstein

    Operators of coal preparation plants use equipment such as large-capacity dump trucks and bulldozers to haul, spread and compact refuse material to conform to federal and state regulations governing t

    Jan 1, 1977

  • CIM
    Improvement of Elements of Safety Culture in KGHM Glogów Copper Smelter

    By Gabka T., R. E. Gregorczyk

    Work to improve employees' behavior in Głogów Copper Smelter began in 2009. It has been noted that over 90% of accidents at work are attributable to human reasons. At that time, a series of external w

    Jan 1, 2019

  • AUSIMM
    Improvement of Existing Ore-forming Models Due to Systematic Sampling During Mining – An Example from Kambalda, Western Australia

    By C Laming, S Staude, D Hammond, S Sheppard, J Griffith, S Stanfield, S Marriott

    Long Operations is located on the eastern slope of the Kambalda Dome in Western Australia. Kambalda hosts nickel deposits that are modelled to have formed from an exsolving sulfide melt from a parenta

    Aug 18, 2014

  • AUSIMM
    Improvement of Gas Flow in Large Blast Furnace

    By Miyashita T, Yamamoto R, Kishimoto s

    Following considerations of the effect of furnace size on pressure loss, pressure loss in front of tuyeres, gas flow in the lower parts of the furnace, the distribution of the burden and the gas flow

    Jan 1, 1975

  • SAIMM
    Improvement Of High-Temperature Electric Characteristics Of Manganese Ores

    By K. Saito, Y. Miyauchi, T. Nishi, Y. Kizu

    At Tokushima Plant of Nippon Denko Co., Ltd. high-carbon ferromanganese is produced by the electric furnace method using lump manganese ores and sintered manganese ores manufactured from fine manganes

    Jan 1, 2004

  • AIME
    Improvement of Industrial Relations

    By George C. Stone

    AS most of you probably know, Australia has had many strikes. The two places that had the worst reputation were the Broken Hill mines and Port Pirie, where the smelter was located. About four or five

    Jan 1, 1920

  • SAIMM
    Improvement of iron-ore processing performance and inclusion of ores with low concentrating ability in processing, R.I. Ismagilov, A.V. Kozub, T.V. Ignatova, D.N. Golenkov, E.V. Shelepov, D.O. Sharkovskiy, N.I. Lomaka, and A.V. Chanturiya

    By D. N. Golenkov, N. I. Lomaka, A. V. Kozub, T. V. Ignatova, E. V. Shelepov, D. O. Sharkovskiy, A. V. Chanturiya, R. I. Ismagilov

    The modern Russian iron ore mining industry is faced with multiple challenges from everincreasing requirements of steel-making, the value of iron ore concentrates, depletion of high-grade ore reserves

    Jan 1, 2020

  • SME
    Improvement Of Longwall Bit Design

    By S. S. Peng, Luo. Y.

    In a shearer longwall mining operation, the longwall hits are responsible for breaking into and chipping the broken coal blocks away from the coal face. However, underground observations found that th

    Jan 1, 1998

  • SME
    Improvement Of Longwall Bit Design (2515ab35-820d-4a22-94cf-dcc1d9c5ed44)

    By Yi Luo

    In a shearer longwall mining operation, the longwall bits are responsible for breaking into and chip-ping the broken coal blocks away from the coal face. However, underground observations have found t

    Jan 1, 1996

  • CIM
    Improvement of Mass and Value Balance data from the Statistical Benchmark Model

    By Cecilia Arrue, Dominic Fragomeni, N. O. Lotter

    "A statistically designed benchmark mill survey was carried out in July 2005 at the Kidd Creek Concentrator, D Division circuit, which processes Ni/Cu ore from the Montcalm deposit. A structured stati

    Jan 1, 2007

  • IMPC
    Improvement of pellet specifications using high pressure grinding roll in Ardakan pelletizing plant

    By M. Saghaeian, R. Hejazi, L. Hosseini

    The specific surface area (Blain value) of iron ore concentrate entering the pelletizing plant is one of the characteristics most effective on the overall performance of the plant such as producing ha

    Jan 1, 2014

  • CIM
    Improvement of Penetration Prediction in TBM-Tunneling by Performing on-Site Penetration Tests

    By K. Thuro, L. Wilfing, H. Kasling

    "In mechanized tunneling, performance prediction is a crucial issue for estimating excavation costs and construction time of a tunnel project. The aim of this work is to compare the calculated paramet

    Jan 1, 2015

  • AUSIMM
    Improvement of Phosphate Ore Flotation Performance Through Sized Flotation

    Improvement of Phosphate Ore Flotation Performance Through Sized Flotation

    Sep 13, 2010

  • SME
    Improvement Of Plant Yield By Effective Desliming Of Froth Flotation Cell Feed At Elk Run Coal Co. ? Introduction

    By P. J. Bethell

    In the froth flotation process the detrimental effect of slimes on the froth flotability of valuable minerals has long been known.1 Work by Aplan2 on the froth flotation of coal has shown that the pre

    Jan 1, 1986

  • SME
    Improvement of Precast Concrete Segmental Lining by Post-Tensioned Strands

    By Behzad Khorshidi

    "The ultimate objectives of the post-tensioned strands are to connect the precast segments into a ring and provide pre-stress in the tunnel circumference. The method involves inserting the strand thro

    Jan 1, 2016

  • IMPC
    Improvement of Processing Technology for High-grade Massive and Cupriferous Ores of the Talnakh Deposit

    By I. I. Maximov

    The paper describes the results of studies performed with a view to develop an improved technology for processing high-grade massive and cupriferous ores of the Talnakh deposit, the main valuable comp

    Jan 1, 2014

  • SME
    Improvement Of Reduction Retardation For Fluxed Pellets

    By K. Tokutake

    Kobe Steel, Ltd. improved the quality of iron ore pellets for blast furnace burdens when it enlarged its blast furnaces. However. there still remained room to increase reducibility at high temperature

    Jan 1, 1989

  • CIM
    Improvement of Rolling Ability of Magnesium Alloy Sheets

    By M. Ataka

    Magnesium alloys are not easy to plastically deform at room temperature and may suffer from edge cracking at high reductions, especially during sheet rolling. In this study, the authors attempted to i

    Jan 1, 2006