Search Documents

  • SME
    Holistic planning and approval of sustainable lignite mining and utilization

    By L. Kulik, J. den Drijver

    Rhenish lignite will continue to play an indispensible role in the energy mix of the German Federal Republic for a long time to come. The use of lignite for electricity generation, upgrading and, if n

    Jan 1, 2011

  • ISEE
    Holistic scientific approach to address wall damage and berm loss from blasting in large open cut metal mines

    By Tapan Goswami, Stephen Jeric, Geoff Brent

    Highwall failures in large deep open cut mines have very significant safety and commercial implications. There are many factors influencing the stability of highwalls. The major influence is the inter

    Jan 1, 2011

  • DFI
    Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground Station

    By Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth

    In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a

    May 1, 2022

  • CIM
    Hollinger Shaft Practice

    By V. J. Southey

    HOLLINGER mining operations have required development by 24 vertical shafts having a total length of 28,160 feet. Seventeen of these are sunk from surface and seven are interior shafts. Four surface s

    Jan 1, 1939

  • SAIMM
    Hollister Project - Introduction

    By Steve Konieczki

    [ ] Great Basin Gold Ltd. (GBG) owns the Hollister Mine and operates it through the wholly owned subsidiary Rodeo Creek Gold, Inc. The property is located in northern Nevada on the Carlin Trend gold

    Jan 1, 2008

  • DFI
    Hollow Core Bar Micropiles - Design Parameters Interpreted From 404 Load Tests

    By Jesús E. Gómez

    This work is a continuation of a paper presented in the 32nd DFI Annual Conference, Colorado 2007, titled ?Hollow Core Bar Micropiles - Design parameters interpreted from 260 load tests.? The first pa

    Jan 1, 2008

  • SME
    Holographic Measurement of Elastic Moduli

    By D. R. Schmitt, B. L. Jensen, T. J. Ahrens, C. L. Smither

    The in situ elastic moduli of rock are measured holographically by a borehole instrument in marble and oil shale. A point force induced displacement field is recorded with double expo- sure holography

    Jan 1, 1986

  • SME
    Holographic Testing Method of Rock

    By Duk-Wom Park

    INTRODUCTION he most important information required for the engineering design of structures in rock is its inherent rock properties. Without providing adequate parameters on the rock property, hi

    Jan 1, 1986

  • CIM
    Holt-McDermott Milling Operation

    By R. H. Colquhoun

    "INTRODUCTION The Holt-McDermott Mine is wholly-owned gold mining operation of American Barrick Resources Corp. that begun operations in June 1988.The property is located 0.5 km. south of Highway 101

    Jan 1, 1989

  • AIME
    Home Coming Week at the Institute

    By AIME AIME

    CHARACTERIZING the annual meeting as the biggest and best one yet has happened so repeatedly that some may suspect it has become a conventional phrase, like "good morning," and yet, what else can be s

    Jan 1, 1930

  • AIME
    Homestake Mining Company's Carrier-Current Shaft Signaling System

    By John F. Wiggert

    DURING the early years of Homestake operations, shaft signaling from the cage tenders to the hoisting engineers was done by mechanical means. Small steel cables or jointed steel rods were suspended in

    Jan 1, 1941

  • SME
    Homestake Mining Company, Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline Studies

    By C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani

    The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine, or for the expansion of an existing mine, can range between 9 months to 24 months, or more. Th

    Jan 1, 2001

  • AIME
    Homestake's Bulldog Mountain Carbon-In-Pulp Silver Plant

    By Steven Mitchell

    BACKGROUND Homestake Mining Company began milling operations at the Bulldog Mountain Mine near Creede, Colorado in 1969. The Bulldog Mill, rated at 350 tpd, produces a bulk flotation condentrate a

    Jan 1, 1983

  • SME
    Homestake's Bulldog Mountain Mill Creede, Colorado ? History

    By Frank M. Howell

    Creede, one of the younger major mining camps in Colorado, grew spectacularly to a town of eight or ten thousand people in the early 1890's following discovery of rich ore in the Amethyst and Las

    Jan 1, 1969

  • SME
    Homestake's Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline Studies

    By C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani

    The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine or the expansion of an existing mine can range from nine to 24 months, or even longer. The time

    Jan 1, 2003

  • SME
    Homestake’s McLaughlin mine : One of the largest US gold mines comes onstream in 1985

    Introduction The Homestake Mining Co. has always been big on gold. After 108 years in the business, the company and its principal product are almost synonymous. The relationship continues. On Sept.

    Jan 1, 1986

  • AUSIMM
    Homogeneity assessment of crushed and pulverised iron ore certified reference materials – implications for laboratory quality control

    By J Carter, B J. Armstrong

    Best practice for the submission of samples to an internal or commercial laboratory requires quality control materials to be included for the purpose of independently and comprehensively assessing lab

    Sep 18, 2023

  • TMS
    Homogeneous Heating In Microwave Processing

    By Xiang Sun

    Microwave processing has been under continuous development as an advanced heating method in modern industries. However, problems with uneven heating still remain. Although heating uniformity is highly

    Jan 1, 2006

  • CIM
    Honeywell Multivariable Predictive Control Implementation in the Goldex Grinding Circuit

    By M. R. Dion, K. Frenette, R. K. Jonas, S. Simard, F. Robichaud

    "In 2011, a site study indicated that the application of Honeywell’s Multivariable Predictive Control Technology (MPC) to the Goldex processing facility would provide significant opportunities for imp

    Jan 1, 2017

  • SME
    Hong Kong Strategic Sewage Disposal Scheme (SSDS) TBM Tunnelling Beneath Seabed and Urbanised Areas\

    By Massimo Concilia, Remo Grandori, Paolo Nardone

    Paul Y. – SELI Joint Venture had been contracted to build the longest section of the Strategic Sewage Disposal Scheme (SSDS) – Stage I. This involved two tunnels under urban and marine areas excav

    Jan 1, 2001