Search Documents

  • AIME
    Forum On Open Pit Mining - Tungsten Carbide Bits for Blockholing at Ajo

    By ALFRED T. BARR

    In certain areas of the New Cornelia pit, considerable secondary blasting is necessary to reduce oversized boulders, formed from primary blasting, to pieces which will pass the 41/2-cu yd dippers on t

    Jan 1, 1949

  • CIM
    Forum on Rod and Ball Mill Liners

    By W. H. Zieman

    NORMAN WEISS, Milling Engineer, American Smelting• and Refining Company: The subject of the Forum on Rod and Ball Mill Liners is very fascinating, and there is no end of discussion when operators get

    Jan 1, 1959

  • CIM
    Forum on the Non-Cataracting Ball Mill

    By L. E. Djingheuzian

    ANON-CATARACTING (N-C) ball mill is so operated that the balls are not thrown in-ward at the top of their paths. The result is to maintain, in the mill, a quiescent pool in which classification will o

    Jan 1, 1958

  • AUSIMM
    Forum: The Role of Government Departments in the Minerals Industry

    I am wearing two hats today. When the invitations went out to participate in this forum, two were received in the head office of the Department of Lands and Survey - one addressed to the Director-Gene

    Jan 1, 1976

  • CIM
    Forward Osmosis for Industrial Process Water Recovery: The Case of TMA-CO2-H2O as Draw Solution

    By V. G. Papangelakis, T. Clark, G. Kolliopoulos

    Sustainability of the hydrometallurgical industry requires the development of processes for effective water recovery; if process water is recovered and recycled, fresh water intakes will be reduced. F

    Jan 1, 2015

  • TMS
    Fostering Minerals Workforce Skills Of Tomorrow Through Education And Training Partnerships

    By Gavin Lind

    The Minerals Council of Australia (MCA), through its Minerals Tertiary Education Council (MTEC), builds capacity in higher education in the core disciplines of mining engineering, metallurgy and miner

    Jan 1, 2014

  • AUSIMM
    Fosterville Gold Mine Heated Leach Process

    By M Binks

    The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo

    Aug 8, 2011

  • AUSIMM
    Fosterville gold mine – breaking the mould for Victorian gold

    By N Phillips

    Fosterville gold mine recently celebrated production of its one millionth ounce of gold based firmly within a history of refractory sulfide gold mining. Compared with other Victorian gold mines, the d

    Sep 20, 2017

  • SME
    Fouling Studies In Mill Water Supply Of Gold And Silver Recovery Operations ? Introduction

    By C. Duke

    The water treatment industry has historically been involved with reducing or inhibiting the inherant scale forming or fouling tendencies of natural waters associated with large industrial cooling wate

    Jan 1, 1983

  • DFI
    Foundation Base Material Strength Assessment for Drilled Pipe Piles using Force and Displacement Data

    By Patrick J. Hannigan, Geir Veslegard, Frank Rausche, Rozbeh B. Moghaddam

    A common type of deep foundation used in Norway to support bridge structures is the drilled pipe piles (piles) filled with concrete reinforcement after installation. The standard installation practice

    Jan 1, 2018

  • DFI
    Foundation Behaviour Of A Large HS-Train Viaduct After 4 Years' Operation

    By Michel Bustamante

    The Arbre viaduct, 200 metres long, is the most important structure on the Belgian portion of the High Speed Train line between Paris and Brussels. The particular geotechnical conditions of the soil w

    Jan 1, 2002

  • DFI
    Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, Dc

    By Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey

    Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and

    Oct 1, 2022

  • SME
    Foundation Conditions, Cart Creek Bridge Daggett County, Utah

    By Wilbur J. Morin

    Construction of Flaming Gorge Dam in northeastern Utah necessitated the construction of a new state highway, Utah-260, to provide access to the dam and the town of Dutch John. A 550-foot arch structur

    Jan 1, 1963

  • DFI
    Foundation Construction Challenges At 100 11th Avenue In Manhattan - Osterberg Cell Load Test In Mica Schist

    By Cem Altuntas

    This paper is the second in a series of two describing the design and construction of a foundation for a major high-rise real estate development on the west side of Manhattan, N.Y. The foundation memb

    Jan 1, 2008

  • DFI
    Foundation Construction Challenges At 100 11th Avenue In Manhattan - Secant Pile Wall

    By Andrew Cushing

    This paper presents the design and construction of the foundation for a major high-rise real estate development on the west side of Manhattan. Arup was retained by Underpinning and Foundation Skanska

    Jan 1, 2008

  • DFI
    Foundation Design And Construction Challenges For The Phoenix Sky Train Project

    By John C. Niedzielski

    The PHX Sky Train is a five mile long automated people mover system located at Phoenix Sky Harbor International Airport. Phase I of the PHX Sky Train includes the design and construction of 227 drill

    Jan 1, 2010

  • DFI
    Foundation Design and Construction Challenges with Marsh Deposits in a High Seismic Risk Zone

    By M. Reza Saberi, T. Ted Miyake

    Driven piles are a common tool in any engineer’s toolbox for supporting large structures over very soft ground, especially in high seismic risk zones. Challenges include achieving sufficient vertical

    Jan 1, 2018

  • DFI
    Foundation Design And Construction In Variable Rock

    By Joel Moskowitz

    A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140 m by 100 m, will include 4 basements under the entire footprint. The perimeter was to be

    Jan 1, 2002

  • DFI
    Foundation Design for Cut-and-Cover Tunnels Using Cement Deep Soil Mixing

    By Shahriar Vandani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles (2.6 km) of highway, including seven new bridges, three new cut-and-cover tunnels, and a new undercrossing connecting the Golden

    Jan 1, 2014

  • CIM
    Foundation for rapidly expanding material handling facilities

    By K. Law

    "The Hatch Product Transport (HPT) system is a highly flexible and configurable route selection and sequencing system for controlling large bulk material handling facilities. The system has a generic

    Jan 1, 2006