Search Documents

  • SME
    Flowing And Raveling Clays

    By Roy J. Leonard

    Two small diameter sewer tunnel projects being hand dug under major highways in the Greater Kansas City area encountered problems which were unforeseen from the geotechnical engineering information su

    Jan 1, 1987

  • CIM
    Flowmeter Validation Method for Pipes with Scaling in an Industrial Water Pumping Station for Mineral Processing in Los Pelambres Mine, Chile, Through Fluorescent and Radioactive Tracers

    By A. Diaz, Minera Los Pelambres, C. G. Salinas, G. Leinenweber, F. Diaz, D. Rojas, R. Bernal, O. Jimenez

    "Los Pelambres Mine (MLP) is located in the IV Region of Chile, a semi-arid region where water plays a key role in operations as a scarce resource and is vital for the sustainability of human life, an

    Jan 1, 2016

  • SME
    Flowsheet Analysis For Mass Balance Calculations In Overdefined Metallurgical Systems With Recycle

    By James Wm. White

    Calculation of consistent steady-state mass balances in operating metallurgical plants and pilot plants is of interest for many reasons. In general, enough data can - and should - be collected to over

    Jan 1, 1979

  • SME
    Flowsheet Auditing For Improved Metallurgical Performance (d12ad8e3-164f-4af7-ae89-df43bfda2ce1)

    By Deepak Malhotra

    This paper discusses the need for periodic auditing of mineral processing flowsheets and the potential benefits a company can gain from a study of this nature. A carefully designed flowsheet auditing

    Jan 1, 1986

  • SME
    Flowsheet Changes For Decreased Moisture Of Concord Mine Coal

    By J. D. Allen

    The Concord Mine Coal Preparation Plant of United States Steel Corporation, located near Bessemer, Alabama, began operations in June, 1950. The basic cleaning circuit consisted of a Chance Cone for cl

    Jan 1, 1966

  • SME
    Flowsheet Description And Process Development Sept-Iles Concentrator

    By Benoit Gagnon

    Mining of the Schefferville iron deposits began in 1954 on completion of the 574 km railway linking the mines and the St-Lawrence river port of Sept-Iles. Apart from crushing, no treatment of these or

    Jan 1, 1980

  • CIM
    Flowsheet Design Using Flotation Rate, Selectivity and RTD Data

    By Manqiu Xu, Peter Wells, Gord Bacon

    "A methodology is proposed for milling flowsheet design using flotation rate, selectivity and residence time distribution data. The flotation rate data and the difference in flotation rates between th

    Jan 1, 2005

  • CIM
    Flowsheet Development and Integrated Pilot Plant Testing for a Pyrochlore Bearing Carbonatite Ore

    By S. Kelebek, B. Ingram, C. Gibson, T. MacNeil, M. Aghamirian

    "The beneficiation and upgrading of pyrochlore from its ores is carried out through flotation. In industrial practice, upgrading is conducted in a two-stage flotation process in which pyrochlore flota

    Jan 1, 2016

  • TMS
    Flowsheet Development for Benefication of Lithium Minerals from Hard Rock Deposits

    By M. Oliazadeh

    Spodumene [LiAl(Si2O6)] is the most common and desirable economic lithium-bearing mineral due to its high lithium content. In Canada, there are several spodumene deposits at the development stage that

  • CIM
    Flowsheet Development for the Extraction of Rare Earths Using Mintek’s Pyearth™ Process

    By I. Thobadi, C. Pawlik, K. Bisaka, S. Mokoena, M. Erwee

    The PyEarth™ process developed at Mintek has been demonstrated successfully at pilot scale. Nine tons of ore containing 2.3 mass % of total rare earth oxides (TREO) from a dormant mineralogically comp

    Jan 1, 2017

  • CIM
    Flowsheet Development for the Hypogene Geomet Unit in the Ivanplats Kamoa Copper Project

    By S. R. Amos, N. O. Lotter, A. L. Hannaford, J. F. Oliveira, D. W. Broughton

    "Ivanplats Ltd appointed Xstrata Process Support to perform the flowsheeting development work for their hypogene and supergene geomet units of the Kamoa Copper deposit, located in the Democratic Repub

    Jan 1, 2013

  • SAIMM
    Flowsheet development for the Sukari gold project in Egypt

    By M. Rhodes

    The Sukari project, which is owned by Centamin Egypt Ltd, is located in southern Egypt, 770 km south of Cairo but close to the Red Sea. The project is the first new gold development in Egypt and was c

    Jan 1, 2009

  • CIM
    Flowsheet Development for Thompson Ultramafic Low-Grade Nickel Ores

    By J. A. Bos, Z. Dai, P. Quinn, A. Lee

    A flowsheet is being developed for processing Thompson ultramafic low-grade nickel ores. This type of ore is characterized by high content of serpentinized magnesium silicates which generate slimes du

    Jan 1, 2009

  • IMPC
    Flowsheet Development Of A Nickel Sulfide Deposit At Vale?s Center Of Mineral Development

    By Aline Tavares

    This paper describes the investigative studies carried out at Vale´s Center of Mineral Development (CDM) for a nickel sulfide deposit aiming to develop an adequate flotation flowsheet. The CDM facilit

    Sep 1, 2012

  • SAIMM
    Flowsheet development work for re-opening of Prieska Cu-Zn Mine, J. Taguta and M. Bryson

    By M. Bryson, J. Taguta

    The Prieska deposit, mined between 1971 and 1991, is one of the world’s top thirty volcanogenic massive sulphide (VMS) base metal deposits. The Prieska Copper Mine in the Northern Cape Province was cl

    Jan 1, 2020

  • CIM
    Flowsheet Development, Commissioning and Start-up of the Voisey’s Bay Mill (33ff6fb1-ab13-4641-96a6-597d0ce850b9)

    By Manqiu Xu, Joe Holmes, Peter Wells, Peter Langlois, Germain Labonté, Jim Barrett

    "The flowsheet for the Voisey’s Bay mill had to meet the challenge of processing an ore containing high pentlandite and chalcopyrite values in a largely pyrrhotite/troilite matrix. In the 1994-97 peri

    Jan 1, 2007

  • CIM
    Flowsheet development, commissioning, and start-up of the Voisey’s Bay mill

    By P. Langlois, G. Labonté, J. J. Barrett, J. Holmes

    "The Voisey’s Bay mill processes a high-grade pentlandite and chalcopyrite ore in a largely pyrrhotite/troilite matrix. From 1994 to 1997, circuit development focused on making a 14% nickel concentrat

    Jan 1, 2017

  • CIM
    Flowsheet Development, Commissioning, and Start-Up of the Voisey’s Bay Mill (2943ae37-09c1-4777-81e1-21dde3685311)

    By P. Langlois, G. Labonté, J. J. Barrett, J. Holmes

    "The Voisey’s Bay mill processes a high-grade pentlandite and chalcopyrite ore in a largely pyrrhotite/troilite matrix. From 1994 to 1997, circuit development focused on making a 14% nickel concentrat

    Jan 1, 2017

  • TMS
    Flowsheets Development For Recovery Of Non Ferrous Metal Values From Secondary Resources By Solvent Extraction

    By T. K. Mukherjee

    The importance of the processing of secondary resources such as solid industrial wastes and liquid effuents as well as byroducts for the recovery of the associated metal values hardly needs any elabor

    Jan 1, 1996

  • TMS
    Flowsheets Development For Recovery Of Non Ferrous Metal Values From Secondary Resources By Solvent Extraction (39d0eedf-59da-482f-93e2-7ab07106593a)

    By T. K. Mukcherjee

    The importance of the processing of secondary resources such as solid industrial wastes and liquid effluents as well as byroducts for the recovery of the associated metal values hardly needs any elabo

    Jan 1, 1996