Search Documents

  • CIM
    Final recovery at Inco's Little Stobie Mine: A case study

    By S. Espley, G. Tan

    "Inco's Little Stobie Mine is a low-grade nickel operation producing approximately 4()()() tons per day. Backfill has never been an economical option at the mine; therefore, the only viable type

    Jan 1, 1994

  • NIOSH
    Final Report Of Investigation To The Diesel Emissions Evaluation Program (Deep) - Noranda Inc. - Brunswick Mine - Diesel Particulate Filter (DPF) Field Study ? Executive Summary ? About the Project

    By S. McGinn

    The Brunswick Mine Diesel Particulate Filter Study was one of several research projects initiated by the Diesel Emissions Evaluation Program (DEEP). The study was carried out at Noranda?s Brunswick Mi

    Jan 1, 2004

  • NIOSH
    Final Report Of The Technical Study Panel On The Utilization Of Belt Air And The Composition And Fire Retardant Properties Of Belt Materials In Underground Coal Mining - Executive Summary

    The Technical Study Panel on the Utilization of Belt Air and the Composition and Fire Retardant Properties of Belt Materials in Underground Coal Mining (hereafter referred to as the Panel or the TSP)

  • DFI
    Final Report – Workshop on Quality Assurance for Post-Grouted Drilled Shafts

    By Mary Ellen Bruce Large

    "In partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC), Deep Foun

    Jan 1, 2016

  • ISEE
    Final Rock Slope Blasting Techniques: Considerations in Design and Execution

    By Michael F. Barber

    "Highway slopes are intended to remain stable over a long period of time. Unexpected slope failures can be costly in terms of human life and property damage or loss. Cleanup of failures can prove to b

    Jan 1, 1999

  • SME
    Final Stage Of Store B?lt Railway Tunnel - Summary And Appraisal -

    By Siegfried Zell

    INTRODUCTION Denmark is a small country with a population of about 5.5 million in the north of Europe. A substantial part of Denmark consists of islands, and the Danes have been familiar with ferry

    Jan 1, 1995

  • SME
    Final Subsidence Basin

    By W. M. Ma, Daniel W. H. Su, K. Centofanti, Yi Luo, W. L. Zhong, Syd S. Peng

    2.1 INTRODUCTION When total extraction of an opening of sufficient size is reached in a horizontal coal seam, the roof strata in the overburden deform continuously to reach a new equilibrium conditi

    Jan 1, 1992

  • SME
    Final Tunnel Liner at Mill Creek 3 Project - Case Study

    By M. Schafer

    The 20 foot diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT-3) has been completed. This paper will summarize aspects of liner design and address the construction approac

    Jan 1, 2008

  • SME
    Final Tunnel Liner At The Mill Creek 3 Project

    By M. Schafer

    The 6-m- (20-ft-) diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT3) has been completed. This article summarizes aspects of liner design and ad-dresses the construction a

    Jan 1, 2008

  • SME
    Final Tunnel Linings on Oakwood Beach West Branch Interceptor, Staten Island, New York

    By Peter S. Schneidkraut

    This paper will discuss the Final Tunnel Linings which were placed in 6700m of a 2.32m inside diameter precast concrete lined interceptor sewer tunnel in Staten Island, New York. Two methods were empl

    Jan 1, 1993

  • CIM
    Final Wall Stability in Metal Open Pit Mines Using Presplit Blasting

    By Kazem Oraee

    Implementing stable final pit walls in open pit mines during the open pit design phase and mine exploitation has become one of the most important concerns of mining engineers in recent years. Failure

    Aug 1, 2013

  • CIM
    Finance

    "In the first half of 1990, Cambior earned $1104 million, or $0.37 per share, on revenues of$66.4 million. The company's strong cash position, attained late in 1989 and in the beginning of1990 th

    Jan 1, 1990

  • SAIMM
    Finance accounting and cost control for long-term construction contracts supported by the integrated management and information system Aristoteles

    By K. Böde

    Hochtief AG Germany has developed a comprehensive management and information system for the construction industry named Aristoteles. This system is an efficient supporting tool to manage a variety of

    Jan 1, 2003

  • SME
    Financiacion Minera

    By Herbert D. Drechsler

    La financiación minera está inter-relacionada con los siguientes aspectos: "determinatión de los recursos totales a utilizar en una empresa minera; adjudicación eficiente de estos recursos a los vario

    Jan 1, 1982

  • SME
    Financial Analysis Applications In Mineral Exploration And Development (842ce720-9adf-4d15-bcce-6bfb75f27dca)

    By Daniel T. Brian, O&apos

    Exploration targets and results in the mining industry are commonly summarized in terms of tonnage and grade. Business appraisals require, as additional information, the expected profit or loss implie

    Jan 1, 1969

  • SAIMM
    Financial Analysis of the Impact of Increasing Mining Rate in Underground Mining, Using Simulation and Mixed Integer Programming

    "This paper challenges the traditional notion that mine planners need to plan production so as to incur the lowest mining cost. For a given mine configuration, a mine that increases its mining rate wi

    Jan 1, 2017

  • SME
    Financial Analysis Software As A Decision Making Tool In The Mining Industry

    By C. A. Roberts

    What are the benefits and limitations of financial analysis software as a decision making tool in the mining industry? Traditionally, the assumptions and simplifications imposed by complex and uncerta

    Jan 1, 1992

  • CIM
    Financial and Geomechanical Optimization for Mine Pushbacks

    By M. Grenon

    OBJECTIVE ?To link slope stability and financial assessment algorithms into a commercially available mine design software packages to provide integrated global pit optimization.

    May 1, 2013

  • AIME
    Financial Aspects Of Joint Venture And Multiparty Structures

    By David C. N. Cockburn

    INTRODUCTION This paper analyses certain of the financial considerations which will commonly apply in relation to the following questions: - what equity structure or project vehicle should be ad

    Jan 1, 1985

  • CIM
    Financial Aspects of Mine Operation

    By A. H. C. A. Zimmerman

    WE have just heard what must be regarded as a thoughtful, constructive and somewhat painful analysis of the financial function of our industry. While thinking about this, it is interesting to reflect

    Jan 1, 1962