Search Documents

  • AIME
  • AIME
  • SME
    Errata (404675de-044f-46a1-a378-4f06623fc2de)

    The following errors were inadvertently included in "How millisecond delay periods may enhance or reduce blast vibration effects" by R.M. Wheeler in the September issue of Mining Engineering.

    Jan 1, 1987

  • DFI
    Errata (5268ac87-18a9-458e-b334-4f72060324e3)

    Volume 1 pages 665-671 Title should read as Dynamic pile testing of H-piles at HDB sites J.Wei, Y. S. Heng, C. S. Lok, M. K.Chong Housing and Development Board, Singapore 'tons'

    Jan 1, 1994

  • AIME
  • AIME
  • AIME
  • AIME
    Errata (c57724e0-c183-44e8-8978-bd8c0fc5d1de)

    [VOL. XXXVI. Page. Line. 155 29 For "Joachimstahl," read "Joachimsthal." 215 Foot-note 2. For " May, 1892," read " May, 1902." 216 21 For " ack-screw," read " jack-screw." VOL. XXXVII. 31 3 For "

    Jan 1, 1918

  • AIME
  • AIME
  • DFI
    Errata - Performance Of A Large Diameter Drilled Pier

    By A. J. Partos

    Table 4, Page 311 Table 4 Experimental Parameters from Straight Line Interpretation of Mohr Failure Envelope [ ]

    Jan 1, 1991

  • SME
    Erratic Highs -- A Perennial Problem In Resource Estimation

    Most statistical and geostatistical methods of re-source and reserve estimation work extremely well for Normal (Gaussian) well-behaved information. However, most interesting mineral deposits exhibit f

    Jan 1, 2000

  • AIME
  • ISEE
    Erratum: A Three Parameter Rock Fragmentation Distrubution

    By A T. Spathis

    Corrections are given for “A three parameter rock fragmentation distribution” by A.T. Spathis (Measurement and Analysis of Blast Fragmentation, Workshop hosted by 10th International Symposium on Rock

    Jan 1, 2013

  • CIM
    Errington and Vermilion Lake Mines

    By William C. Martin

    "Consolidated Sudbury Basin Mines Limited owns two mines, 4 miles apart, near the southwest end of Sudbury Basin. The Errington mine lies close to the north boundary of Creighton Township and about 18

    Jan 1, 1949

  • CIM
    Error Associated with the Sampling of Gold Ores

    By Raphaël Mermillod-Blondin, Claude Bazin

    "Sampling is an important step for ore body evaluation and daily plant material balances. The Gy’s equation is regularly used to assess the size of the samples to be collected and to estimate the repr

    Jan 1, 2012

  • CIM
    Error Associated with the use of Triaxial Rock Strength Criteria when Assessing the Stability of Underground Openings

    By J. P. Harrison, R. Roostaei

    "In this paper we investigate the consequences of using conventional triaxial peak strength criteria in the polyaxial stress conditions that occur around the end of a long circular underground opening

    Jan 1, 2015

  • CIM
    Error Variance Information from Paired Data: Applications to Sampling Theory

    Abstract - A method to extract certain types of error variance information from paired data is presented, which constitutes an important tool for the calibration of Gy’s formula for variance predictio

    Jan 1, 1998

  • AIME
    Errors in Underground Air Measurements

    By Stefan Boshkov, Malcolm T. Wane

    The validity and accuracy of velocity measurements underground have been questioned repeatedly by those in mine ventilation work. The general disagreement on the subject is well illustrated in an AIME

    Nov 1, 1955

  • AIME
    Erskine Ramsay

    ONE DAY IN the mid-1880s, in a suburb 0f Pittsburgh, Pennsylvania, there dismounted from a train the two foremost leaders of the day in the coal and steel industries-Andrew Carnegie and H. C. Frick. T

    Jan 1, 1953