Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Discussion - Mineral resource objectives of the Continental Scientific Drilling Committee's dedicated drill holes and add-on science to solve mineral deposit problems

    By C. W. Hunt

    I wish to register strong disagreement with the choices of drilling sites chosen by the Continental Scientific Drilling Committee, while endorsing the stated objectives. Of special significance is the

    Jan 1, 1988

  • SME
    Evaluating The Environmental Risk Of Water Quality Impacts At Mining Sites

    By W. M. Schafer

    The risk that water quality will be degraded by mining activity can be evaluated using risk analysis techniques. Water quality impacts can occur where water-rock interactions with tailings, waste rock

    Jan 1, 1998

  • SME
    Design Considerations For Impounding Valley Leach Pads Vs. Conventional

    By Allan Breitenbach

    Leaching has been used since the 1600s on unlined ore dumps and since the late 1970s on lined leach pads for the recovery of metals from mined ore, the latter typically called ?heap? leaching and the

    Jan 1, 2012

  • SME
    Closure Costs (Pay Me Now And Pay Me Later)

    By J. J. Antony

    As the first wave of precious metal heap leach closures and reclamation projects occur, a number of companies are being hit with costly surprises. While this paper refers specifically to U.S precious

    Jan 1, 1994

  • SME
    Performance Of The Homestake Mining Company Biological Cyanide Degradation Wastewater Treatment Plant August 1984 - August 1986

    By J. L. Whitlock

    A mutant strain of Pseudomonas paucimobilis is utilized to effectively degrade and or remove 90-98% of cyanide, thiocyanate, toxic heavy metals and ammonia from a cyanidation mill process and mine dis

    Jan 1, 1987

  • SME
    Ore Haulage System At Ozark Lead Company

    By Roy H. Paddon

    This paper describes the 6, 000 tpd, three stage haulage system at the Ozark Lead Company's mine in southeastern Missouri. It details the methods and problems pertinent to the loading, hauling, s

    Jan 1, 1971

  • SME
    The Design and Manufacture of the Arrowhead Tunnels Project Precast Segmental Lining

    By Christopher Hebert, Michael R. King, Mehdi Ghazi

    The Inland Feeder project is a critical component of Southern California’s water delivery system, relying on a strategic plan of water transfer and storage to enable the delivery of an additional 650

    Jan 1, 2003

  • SME
    An Expert System For Mine Design And Cost Engineering: New Directions For The Bureau Of Mines Cost Estimating System

    By M. L. Smith

    The U.S. Bureau of Mines Cost Estimating System (CES) has been used for prefeasibility analysis and mine cost engineering since 1978. In the past, prefeasibility analysis with CES has involved the sol

    Jan 1, 1994

  • SME
    The Professional Approach To Drilling And Blasting Operations

    By George H. Tousley

    As a member of the vast fraternity of those that supply and service the mining industry, I can assure you that we are amused, amazed, and horrified at the poor drilling and blasting practices of a gre

    Jan 1, 1976

  • SME
    The Role Of Mineral Science In Tactical R&D

    By H. H. Murray

    Tactical R & D is research and development for a specific application or applications. The mineral scientist has to define and understand the physical and chemical parameters required for a specific o

    Jan 1, 2003

  • SME
    Physical Limnology Of Existing Mine Pit Lakes (b143b112-b515-47b2-900c-ecab69e304fc)

    By G. A. Doyle

    The quality of water in mine pit lakes depends in part on the physical limnology, including such factors as thermal and chemical stratification, turnover and the development of anoxic conditions with

    Jan 1, 1997

  • SME
    Land Reclamation In Urban Areas

    By Gene R. Block

    The most economical method of reclaiming land that has been mined, whether it be in urban areas or in rural areas, is when the final configuration of the mining area is that which is required by the s

    Jan 1, 1984

  • SME
    Lower Grade Nickel Sulfide Resources (a0c91d9f-fa30-4298-95e0-72547311e3ab)

    By J. M. Duke

    Significant resources grading less than about 1 % nickel occur in magmatic sulfide deposits of two types. In the Mt. Keith type, extensive zones of disseminated nickel sulfides occur in the central p

    Jan 1, 1982

  • SME
    How Maintenance Practice Affects Wire Rope Life (In Surface Coal Mining Draglines)

    By W. E. Anderson

    As part of a larger study to identify factors influencing the practical operating life of wire rope used on large draglines in surface coal mining, field trips to operating surface coal mines were mad

    Jan 1, 1977

  • SME
    Assessing the Interaction between the Excavation of a Large Cavern and Existing Tunnels in the Alps

    By Edoardo Misano, Magali Schivre, Martino Semeraro, Alain Bochon

    "INTRODUCTIONThe Laboratoire Souterrain de Modane (LSM) is an underground research laboratory located in the Western Alps on the French – Italian border. It is located in the middle of the 13km long F

    Jan 1, 2016

  • SME
    Overview Of Low-Rank Coal Drying

    By W. G. Willson

    Low-rank coal (LRC) drying processes are generally categorized by operating temperature, drying environment and type of feed (either sized or ground coal). Within these broad categories, drying proces

    Jan 1, 1997

  • SME
    Sustainable Change of Coal Mining Regions

    By J. Kretschmann

    According to the model of product life cycles, the global coal mining industry is in the stagnation phase. The coal demand of the main consumer, China, has peaked in 2013 and is slowly declining. The

    Jan 1, 2019

  • SME
    Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021

    By Aaron Archer, James Parkes

    This paper presents design considerations for the major underground elements of the pending BCRUA Phase 2 Raw Water Delivery System Project. These elements include two Lake Taps; an 8,800 LF, minimum

    Jun 13, 2021

  • SME
    Dust Collection And Control In Urad Crusher Plant

    By James Crosby

    The Urad property had been worked intermittently for over 50 years before American Metal Climax (AMAX) started an extensive exploration program on this property in 1961. The detailed studies of the pr

    Jan 1, 1971

  • SME
    Factors Affecting Solution Balance During In Situ Leaching Of An Unsaturated Copper Ore Body (6dec3392-5dc6-41ba-8b28-57254f57d550)

    By Perry M. Jones

    An important operational and environ-mental concern associated with in situ leaching activity is the balance between solution injection and recovery. Solution balance is an important indicator of the

    Jan 1, 1991