Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Inspector?s Guide to Augered Cast-in-Place PilesBy Matthew E. Meyer
The intent of this manual is to provide guidelines for observing and documenting the installation of ACIP piles. The manual may also serve as a guide for the training of inspection personnel. It is ex
Jan 1, 2010
-
Investigation and Design for Large Drilled Shaft Foundations in Southwest ArizonaBy John C. Tosh, Peter M. Kandaris, Sheldon John
Geologic, geotechnical and hydrologic studies were performed for the design of 115 deep, large diameter drilled shaft reinforced concrete foundations (6 to 12 feet) to support tall steel monopoles for
Sep 8, 2021
-
Probabilistic Subsurface Characterization for Transmission Line Foundation DesignBy Neil T. Russo, Peter M. Kandaris, Jogi S. Gadok
"Assessment of subsurface data for foundation design in support of long high voltage electric transmission lines is best accomplished using a probabilistic strategy since only a small portion of struc
Jan 1, 2017
-
Innovative Use of an Active Soil Nail Wall in Lieu of Pit Underpinning for a Historic BuildingBy Tai Luu, Maxim C. Schisler, Yaser Taheri
The Stevens Gateway Project is an expansion of the Stevens Institute campus overlooking the Hudson River in Hoboken, NJ. The plans call for 90,000 ft2 (8360 m2) of new classroom, research, and student
Jan 1, 2019
-
Driving And Extraction Of Steel Pipe Piles In Nearshore EnvironmentBy Nihal Bohra
A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the bre
-
Mini-Pile Design and Construction Methods Change to Mitigate Soil Loss through Glacial Till (db8ff9fc-ef1a-44d4-9e2e-ad6c00fcf7e5)By Cassandra A. Wetzel
"Rock socketed mini-piles are a desirable foundation alternative when design capacity is more than 40 tons and there is limited access. In this case history mini-piles were designed to support between
Jan 1, 2017
-
Complex Deep Foundation System for Tall Tower in New York CityBy Renzo D. Verastegui, Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala
"When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high-rise towers in New York City. The 52-story condominium building is located on a 60 ft by 100 f
Jan 1, 2017
-
Secant Pile Top-Down Construction for a Drainage Channel in Puerto Rico: An OPA FinalistBy Bill Shea, Gordon King
"For a drainage channel built in San Juan, Puerto Rico, a value engineering (VE) proposal incorporating a secant pile top-down approach saved time and facilitated construction work on the larger flood
Jan 1, 2012
-
Axial Capacities Of Drilled Displacement Piles Predicted By Spt And Cpt Based MethodsBy Sam Warren, Antonio Marinucci, Genesis Z. Figueroa, Anne Lemnitzer
Drilled Displacement Piles (DDP) provide an ideal deep foundation solution that combines the benefits of ground improvement with traditional advantages of piling systems. This paper consolidates data
May 1, 2022
-
Augered Pile World Record Depth within a Soil Mix BasementBy Andres M. Baquerizo, Jeremiah J. Filjones, Nicholas Feldt
The Estates at Acqualina located in Sunny Isles Beach, FL, is comprised of two, ocean-front, 50-story, luxury towers with podiums and villas. With city regulations now requesting that above-grade floo
Jan 1, 2019
-
Case Study: The Use Of Post Tensioned Piles For Wind Turbine FoundationsBy Amr Sallam, Ahmad Mohamed, Mohamed Alrowaimi
Renewable energy, in the form of wind and solar, has emerged as main source of energy in the modern society. The wind industry has substantially grown over the last two decades to become a key player
-
Drilled Pier Foundation with Ground Improvement Using Cement Deep Soil Mixing for Highway BridgesBy Shahriar Vahdani, Andy Herlache, Andrew Bro, Wei-Yu Chen
"The Presidio Parkway Project will reconstruct approximately 1.6 miles of highway, including seven bridges, three cut-and-cover tunnels, and an undercrossing connecting the Golden Gate Bridge to the C
Jan 1, 2014
-
Deep Excavation Support: Innovative Shoring Design in an Urban EnvironmentBy Richard D. Luark, Fernanda S. Madrona
Designing temporary retaining systems that allow for deeper excavation amid the existing urban infrastructure has become a challenge. A 60-foot-deep excavation in downtown Seattle was required to cons
Jan 1, 2019
-
Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River GorgeBy Brian J. Olson, Kevin Haiar
Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re
Sep 8, 2021
-
Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation MethodsBy Ali Azizian, Brian Hall
"Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an envir
Jan 1, 2016
-
Geotechnical Monitoring Of Deep Shoring Adjacent To Train InfrastructureBy Jakub Szary
Excavation and shoring adjacent to the above-grade Gilmore train station and elevated guideway was undertaken in 2019. A perimeter secant pile cut-off wall was constructed to a depth 37 m (121 ft) bel
Sep 1, 2022
-
Soil Nailing Guide Specification - Title ? Table Of Contents - Model Specification - 1. General - 1.1 Purpose Of SpecificationThis specification, along with the drawings, encompasses all designs, materials, products, accessories, tools, equipment, services, transportation, labor and supervision, installation techniques, and
Jan 1, 2010
-
Helix Deflection Effect on Load Settlement Behavior of Pile with Increasing Stress LevelBy Adnan A. Malik, Tadashi Maejima, Jiro Kuwano
"Previous studies revealed that the helix deflection reduced the end bearing capacity of screw pile in dense ground even if the installation process is completed with minimal soil disturbance. The ult
Jan 1, 2017
-
The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff WallBy Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers
Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM
Jan 1, 2019
-
The Impact Geotechnical Data Management Systems May Have on Risk Allocation for Differing Site Conditions in Construction ContractsBy Steven M. Henderson, Zachary D. Jones
The risk of allocation in construction contracts is a primary concern for all parties. For contracts involving subsurface construction the allocation of site condition risk is critical. In the past on
Jan 1, 2017