Technical Aspects And Research In DowndragBy Jean-Louis Briaud
The following is a summary of a very recent report prepared at Texas A&M University for the National Cooperative Highway Research Program and entitled "Downdrag on Bitumen Coated Piles". Anytime the
Jan 1, 1989
-
Challenges and Lessons Learned from Shoring Design of 2nd / Broadway Metro StationBy Babak Mamaqani, Pirooz Barar
Regional Connector Transit Corridor (RCC) is part of the Los Angeles metro expansion project under construction which adds three new stations into the system. PB&A was responsible for the design of th
Jan 1, 2019
-
Deep Drilled Shafts For The Pearl Harbor Memorial Bridge New Haven, ConnecticutBy Theodore von Rosenvinge
Large diameter (2.4 meter) drilled shaft foundations were installed to depths of over 62 meters through soil into Arkose bedrock for Connecticut?s Pearl Harbor Memorial Bridge (I-95 over New Haven Har
Jan 1, 2011
-
-
Geophysical Methods For Site Characterization For Marine FoundationsBy Richard E. Sylwester
Evaluating surface and subsurface conditions for marine foundations (bridges, causeways, terminals, etc.) is often done with a limited amount of data. Subsurface information for these projects is pri
Jan 1, 2013
-
Drilled Shaft Design For Noise Wall Barriers Along I-20 In Columbia, SCBy Anil Bhandari
Using subsurface data collected at each drilled shaft location is an ideal approach for conducting drilled shaft design. However, conducting subsurface tests at each drilled shaft location and subseq
Jan 1, 2011
-
Innovative Deep Foundation Support Using Ductile Iron PilesBy Thomas Billups, Brendan FitzPatrick, Doug LeDo, David Carchedi
"Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical analysis and design. These challenges often include working on site
Jan 1, 2016
-
Emergency Jacking Tunnel in Compressible SoilBy Tai Luu, Michael McNicholas, James C. McIntyre
The Jersey City Municipal Utilities Authority (JCMUA), discovered that an existing sewer pipe had collapsed under the New Jersey Transit Conrail Railroad between Pine Street and Ash Street in Jersey C
Jan 1, 2019
-
Harmonization of Execution Codes: Overview of Standardization for US TransportationBy Silas C. Nichols
"Abstract Piling and deep foundations are a staple for transportation projects in the United States (US). Driven or bored piles have been used for everything from support of bridge foundations and ret
Jan 1, 2014
-
Deep Dry Soil Mixing Performance and Quality Control Acceptance CriteriaBy Patrick K. Wong, Richard Kelly
"The variability in strength and compressibility of in situ deep soil mixing products can be greater than the variability of the natural soil. However, satisfactory performance can be achieved by care
Jan 1, 2015
-
Block 43: Diverse Technologies in Complex Site ConditionsBy John Kvinsland
"The Block 43 Project is the future home of the Paul Allen Institute for Brain Science located just off the southern shore of Lake Union in Seattle, Wash. The South Lake Union (SLU) district experienc
Jan 1, 2014
-
Drilled Shaft Acceptance Criteria Based Upon Thermal Integrity ProfilingBy Garland Likins, Gray Mullins, George Piscsalko
"Quality control of drilled shafts is greatly dependent upon the practices of the site personnel. For drilled shafts cast under slurry, inspection of the hole prior to concreting is very difficult or
Jan 1, 2016
-
Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging ProjectBy José Carlos do Amaral, Marcelo Groszownik, Jorge Beim
"Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the
Jan 1, 2015
-
Earth Pressure Distribution On Diaphragm Wall During ExcavationBy Ting Chinsu
Diaphragm wall with tie-back cable is widely used for deep excavation, especially in the area with high density of buildings. This paper presents the measured earth pressure distribution on diaphragm
Jan 1, 1991
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KYBy Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Foundations Of The 'Kö-Galerie' In Düsseldorf Using Top/Down Building TechnologiesBy P. Arz
With a total of five basement levels, ground floor and a further six levels above grade, construction of the Kö-Galerie building, on the Königsallee, in the centre of Düsseldorf, was completed with al
Jan 1, 1989
-
Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - SynopsisBy D. K. ] [Gupta
The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and
Jan 1, 1996
-
High Strain Testing Of Augered Cast Piles At Miami Fort Power StationBy C. Michael Morgano
Static tests are costly and time consuming, so they are not always the best answer [ ]
Jan 1, 2005
-
Delving Deeper Into Foundation Slurry RheologyBy Greg Plutko
Laboratory testing has shown that the Marsh Funnel test can be significantly impacted by long-chain polymer entanglement. In general, shorter hydration time leads to more chain entanglement which in-t
-
Cofferdam Failures ? IntroductionBy Richard J. Hartman
This presentation identifies some of the more common problems associated with cofferdam construction. After the various problems are identified, they are briefly explained and possible solutions and p
Jan 1, 1987