Mitigating Settlement with Pile-Supported Approach SlabsBy Reda M. Bakeer
"An approach slab is the roadway segment that immediately follows a bridge intended to provide a smooth transition between the two elements. Some approach slabs have developed rough rideability with t
Jan 1, 2017
-
The Pile Foundation Of Tall Buildings In ShenzhenBy Li Keqiang
This paper discusses the pile foundation of tall buildings in Shenzhen region. For 156 constructed tall buildings exceeding 18 storeys, about 86. 5 per cent of the sum. The two main types of foundatio
Jan 1, 1991
-
Deep Excavation Retaining Systems In Unsaturated SoilsBy Tariq B. Hamid
Deep excavation is commonly associated with construction of different deep below-grade structural elements (e.g., basement walls and slabs, tunnels, retaining walls, tanks, utilities, etc.) Deep Excav
Jan 1, 2006
-
Study Of Hammer Selection For Driven Steel Pipe PileBy Jiwei Duan
The energy transferred from a hammer to the pile top is considered as the effective energy in this paper. The effective energy is related to the pile dimensions, soil and pile-soil interface propertie
Jan 1, 2006
-
Measured And Predicted Response Of Laterally Loaded Piles - SynopsisBy K. Mallikarjuna Rao
There are several methods available to estimate deflection and ultimate Capacity of laterally loaded piles. In this investigation an attempt has been made to verify the existing methods for prediction
Jan 1, 1996
-
Comparison of Static Lateral Behavior of Vertical and Battered Pile Groups of the I-10 Twin Span Bridge Using Finite Element SimulationBy Ahmad F. Souri, Murad Abu-Farsakh
"In this study, the static lateral resistance of vertical and battered pile groups was analyzed using 3D finite element analysis. The battered pile group finite element model was verified using the re
Jan 1, 2017
-
When Real Estate Values Beckon - The Means And Methods Employed In The Underpinning Of 1501 BroadwayBy Edward J. McNamara
People in the real estate industry are fond of saying that the three most important features of a piece of property are, in order, location, location, and location. This is perhaps the reason that the
Jan 1, 2000
-
Vibratory Driver/Extractors Do More Than Drive Sheet Piles - SummaryBy John L. White
Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to
Jan 1, 1997
-
Diaphragm Walls And Barrettes For Top-Down Construction: A Project ReportBy Bjöm Böhle
Top-down construction (or cut and cover construction) is providing important advantages when comparing with conventional construction techniques for commercial developments with deep basements, underg
Jan 1, 2006
-
Reanalysis Of Piles Under Static And Dynamic Lateral LoadsThe process of pile driving disturbs the soil around the pile. The nature and magnitude of disturbance depends upon 1) the pile size, and 2) the nature of soil. Therefore, the prediction of a single p
Jan 1, 1989
-
Design Methods For Earthquake-Induced Pile BendingBy George Mylonakis
The curvatures and subsequent bending imposed to piles by the surrounding soil during the passage of strong seismic waves is studied. This type of bending develops even in the absence of a superstruct
Jan 1, 2002
-
Application of Large-Scale and Rapid Construction of Lightweight Stabilized Soil with Air Foam for Deep Water Zone to Stabilize Existing Quay WallBy Yoshio Mitarai, Takeshi Nagatome, Yosuke Tanaka
"This paper describes an application of lightweight soil in a deep water area to stabilize an existing quay wall at the Port of Tokyo. Super Geo Material, abbreviated SGM, is a type of lightweight soi
Jan 1, 2015
-
Longitudinal Splitting Of Precast Reinforced Concrete Piles During Driving ? SynopsisBy B. B. Broms
The high transverse tensile stresses that develop in precast concrete piles during driving have been investigated experimentally from pile load tests and theoretically using the finite element method
Jan 1, 2010
-
Steel And Concrete Piles Used In The Great Plains Of USABy Marius B. Wechsler
A mathematical analysis is developed for the determination of the cases when HP-piles might be replaced by precast concrete piles. The analysis focuses especially on the "integral abutment-bridges" wh
Jan 1, 1992
-
Construction Productivity Advancement Research Program (CPAR)By Jesse A. Pfeiffer
CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati
Jan 1, 1989
-
Ultimate Soil Pressures For Pile Groups In Soft Clay Subjected To Lateral Soil MovementsBy L. F. Miao
Studies were carried out to investigate the ultimate soil pressure acting on pile(s) undergoing lateral soil movement in soft clay. A special apparatus has been designed to apply a uniform rectangular
Jan 1, 2008
-
Vertical And Lateral Load Tests On Driven And Cast-In-Place Piles ? SynopsisBy G. Price
The Building Research Establishment installed a base load cell in a driven cast-in-place pile prior to it being tested under vertical load. The monitored base loads were found to be significantly less
Jan 1, 2010
-
Bearing Capacity Of Piles Using Cavity Expansion Theory ? SummaryBy R. Bellotti
The theory of cavity expansion in an infinite frictional soil mass whose strength is represented by a curved Mohr-Coulomb failure envelope has been used to predict with some confidence the cone resist
Jan 1, 1987
-
Deep Foundation Construction Using "Top/Down" Building Techniques In The United StatesBy David C. Lager
While not a new construction technique "top/down" construction is seeing increased use in high rise building construction. Using diaphragm wall, drilled shaft and mining construction techniques, top/d
Jan 1, 1987
-
Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - IntroductionBy Jon H. Gould
This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub
Jan 1, 1992