Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Foundations For The M25 Motorway Near To Heathrow AirportBy John F. Spence
Ever since opening, the M25 motorway to the west of London has carried a rapidly increasing volume of traffic. The section of M25 between the junctions with the M3 and M4 motorways, which is in the ne
Jan 1, 2007
-
Prediction And Performance Of Drilled Shafts Constructed Under SlurryBy Clyde N. Baker
The paper describes procedures used to predict the settlement performance of drilled shafts constructed under slurry through water bearing deposits to a dense bearing strata, considering both side res
Jan 1, 1991
-
Accessing HistoryBy Richard Pizzi
Built in 1806, Boston's African Meeting House is the oldest surviving Black church building in the country. A $7 million dollar renovation was begun in 2006 to restore this historic building to
Jan 1, 2011
-
Bacteria Help Civil Engineers; Report Of A Pilot ProjectBy John W. M. Lambert
This paper describes the execution and the results of a new method to seal off leaks in water retaining constructions. The new method, called BioSealing is based on activating the bacteries, present i
Jan 1, 2006
-
Vertically Loaded Piles In Sand Subjected To Triangular Profiles Of Soil MovementsBy W. D. Guo
With an experimental apparatus developed recently, model tests on piles were conducted in sand subjected to triangular soil movement profiles. Four instrumented piles tests are reported, which show th
Jan 1, 2006
-
Coming To Times - Background - CollapseBy Darrell L. Beddard
The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western
Jan 1, 1995
-
Local Use And Design Of Augered, Cast-In-Place Piles In The Southern Piedmont Province ? IntroductionBy Geoffrey C. Hebner
Augered, cast-in-place piles (ACIP) have become a very common foundation type in Atlanta and the Southern Piedmont Province as well as much of the United States in the past 20 years. Prior to the intr
Jan 1, 2003
-
Presentation #1 - Deep Foundation Inspection And Integrity Testing - Introduction - Why Use Drilled Shafts?By Bernard Hertlein
¦ Drilled shafts resist scour seismic loads better than groups of driven piles ¦ Drilled shaft construction creates less noise and vibration than driving piles ¦ Drilled shafts permit direct obser
Jan 1, 2001
-
Design And Construction Of Integral Drilled Shaft - Columns For The Boscawen-Canterbury BridgeBy Frederick C. Rhyner
Drilled shafts have become an economical foundation choice for bridges in the northeast United States, especially when they can be constructed over water without the use of cofferdams. For the Boscaw
Jan 1, 2004
-
Project Specifc Design Criteria I-880 Reconstruction Project, Oakland, CaliforniaBy Steve Thoman
After the 1989 Loma Prieta Earthquake, the California Department of Transportation (Caltrans) initiated an overview of the Caltrans Bridge Design Specifications (BDS) and bridge seismic design practic
Jan 1, 1996
-
Tied-Back Micropile Walls In Landslide RepairBy Kevin W. Cargill
In September 2004, Hurricanes Frances and Ivan caused the Pigeon River in western North Carolina to flood. This flooding eroded the embankment below Interstate 40 (I-40) and sent one of the eastbound
Jan 1, 2006
-
Rigid Inclusions For Soil Improvement In A 76 Building ComplexBy Walter I. Paniagua
A housing complex of 76 buildings is being constructed in the city of Morelia, in western central Mexico; the buildings are 5 levels high, with a shallow concrete slab foundation. Soil conditions incl
Jan 1, 2008
-
Settlement & Vibration Monitoring For Transmission Line Foundation Installation: A Case HistoryBy R. Heath Forbes
The route of a new, 4-mile long, electrical transmission line passed through residential neighborhoods and commercial areas of a small town in the South Carolina Coastal Plain. The new line consisted
Jan 1, 2011
-
Sheetpile Wall System With Tiebacks In A Soft Clay Profile - Description - A. Alignment DescriptionBy Jean J. Abiassi
The Boston Marine Industrial Park (BMIP) VENT 6 project is a cut and cover tunnel, part of the Central Artery / Tunnel (CA/T) in the city of Boston. The BMIP job will serve as the south approach t
Jan 1, 1994
-
Soil Grouting to Arrest Foundation SettlementBy Anuj K. Singh, Shuvranshu Rout, Manos De
"Foundation for tracks of coke transfer car and dust extraction pipe was designed as series of isolated foundations spaced at 11.0m along length of coke oven battery resting on soil at depth of 2.5m.
Jan 1, 2017
-
Liquefaction Mitigation Synthesis ReportBy Timothy C. Siegel
This report presents the results of a synthesis on the design and analysis of ground improvement for liquefaction mitigation. The synthesis included an industry survey concerning the practice of groun
Aug 1, 2013
-
Analysis Of Strain-Dependent Concrete Modulus From Mass Instrumented Test Pile SamplesBy Lee Sieng Kai
This paper presents the result of the analysis of strain-dependent concrete modulus from full-scale static axial compression load tests conducted on more than 200 instrumented cast-in-place barrettes
Jan 1, 2006
-
Development of New Shaft Resistance Models for Piles Driven in the Puget Sound LowlandsBy Armin W. Stuedlein, Youssef Bougataya
Early stage design of driven piles primarily relies on static analysis based on one or a combination of total and effective stress approaches, the latter known as the method to estimate axial capaci
Jan 1, 2018
-
Recent Developments In Continuous Flight Auger PilingBy P. H. Derbyshire
The use of continuous flight auger piles has increased significantly in the U.K. to such an extent that it is now the most widely used method of constructing small diameter bored piles. This paper des
Jan 1, 1989
-
Soil Nail Support Of Excavation System For The Embassy Of The Peoples Republic Of China In The United StatesBy Giovanni A. Bonita
The new Embassy of the Peoples Republic of China in the United States (Chinese Embassy) is located in the Embassy Row portion of Northwest Washington DC. The 475,000 ft2 (44,125 m2) struct
Jan 1, 2006