Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Complex Piling Works At London Blackfriars Station

    By Jamie D. McEwan

    To cater for the future introduction of 12 car trains, London Blackfriars railway station is being extended from the north end to span across the River Thames. Following the demolition of existing bui

    Jan 1, 2011

  • DFI
    The Waterloo Barrier - A Sealable Joint Steel Sheet Piling For Groundwater Control And Remediation - Presented At The Deep Foundations Institute Annual Meeting & Conference Toronto, Ontario, October 15-17, 1997 - Summary

    By Murray Gamble

    A new type of groundwater cutoff wall has been developed at the University of Waterloo. The Waterloo Barrier? is a steel sheet piling system that incorporates a sealable cavity at each interlocking jo

    Jan 1, 1997

  • DFI
  • DFI
    Instrumented Load Tests On Closed-And Open-Ended Piles

    By Junhwan Lee

    Pipe piles can be either closed- or open-ended piles. Pile load capacity for a closed-ended pile consists of the shaft and base resistances, while, for an open-ended pile, it consists of shaft, soil p

    Jan 1, 2003

  • DFI
    Söderströmstunneln – An Immersed Tunnel Founded on Steel Core Piles

    By Frank Haehnig, Kjell-Åke Averstad, Johannes Glückert

    "AbstractThe Söderströmstunneln is part of the Citybanan project that is currently under construction in the centre of Stockholm. Main part of the lot Söderströmstunneln is a 300m long immersed tunnel

    Jan 1, 2014

  • DFI
    Fundex - Deep Foundation Institute Tensile Pile Test Seminar - September 9 & 10, 1993 - Introduction

    After the Loma Prieta Earthquake, which caused major damage to viaducts in the Bay Area, the California Department of Transportation set up a test programme for foundation piles. Funderingstechnieken

    Jan 1, 1993

  • DFI
    Non-Linear Analysis Of Large Pile Groups For The New Wembley Stadium

    By S. Hardy

    The paper describes state of the art non-linear analyses of the pile groups that were employed during the raising of the 133m high triumphal arch which forms the centre piece of the new Wembley stadiu

    Jan 1, 2006

  • DFI
    Spring Constants of Belled Caissons for Seismic Retrofit of an Existing Critical Structure in a Seismically Active Area

    By David E. Albus, Ahmadreza Mortezaie, Bidjan Ghahreman

    The structural evaluation of seismic performance of an existing hospital in Long Beach, California, required spring constants of foundation elements. The structure included support by deep foundation

    Jan 1, 2018

  • DFI
    Installation And Testing Of Instrumented Tieback Anchors - Introduction

    By Joan Stoupa

    The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili­

    Jan 1, 1990

  • DFI
    Historical Evolution Of Deep Foundations

    By Dean E. Matthews

    The concept of a pile for construction is credited to a Neolithic tribe called the "Swiss Lake Dwellers" who lived in what is now Switzerland about 6,000 years ago. They used piling, not for supportin

    Jan 1, 2003

  • DFI
    Drilled Pile Design and Installation Challenges in an Urban Environment

    By Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran

    This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment

    Jan 1, 2018

  • DFI
    New Possibilities for Quality Assurance of Diaphragm Wall Joints

    By Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider

    "Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc

    Jan 1, 2014

  • DFI
    Computation Of The Load/Settlement Behaviour Of HP-Bearing Piles - 1. Introduction

    By E. E. De Beer

    This paper describes a method for the determination of the settlement of an individual H-bearing pile, based on the results of CPT-tests. As implied by the nature of the problem, no analysis perform

    Jan 1, 1987

  • DFI
    A Quality Control System For Augered Cast-In-Place Pile Installation

    By George G. Goble

    The use of augercast piles has been limited by the engineer's concern for the structural quality of the installed pile. The nature of the pile is such that its final structural continuity is very

    Jan 1, 1997

  • DFI
    Pin Piles For Seismic Rehabilitation Of Bridges

    Since the 1989 Loma Prieta Earthquake in the San Francisco Bay Area, the California Department of Transportation (CALTRANS) has accelerated seismic upgrading of their bridges. Many structures can be i

    Jan 1, 1993

  • DFI
    Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - Synopsis

    By Robert Jakiel

    The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange

    Jan 1, 2000

  • DFI
    An Innovative Approach To Load Testing Of High Capacity Piles

    By P. Bermingham

    A new approach to load testing of high capacity piles is presented. The method is mobile, inexpensive, repeatable and non-destructive allowing for multiple pile testing at a single site. A reaction ma

    Jan 1, 1989

  • DFI
    Resolution Of Prestressed Concrete Pile Splice Problems - Summary

    By David Siu

    Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea

    Jan 1, 1991

  • DFI
    Re-Use Of Foundations And The Role Of NDE Techniques

    By Huw Williams

    It is becoming increasingly common practice to re-use existing foundations for new projects, especially on urban sites where geotechnical conditions are congested. A knowledge of the foundation dimens

    Jan 1, 2006

  • DFI
    FDOT Method of Independent Separation of Tip and Skin Capacities of Driven Concrete Pile with Embedded Sensors

    By Sastry Putcha, Vamshi Vemula, Aneesh Goly, Kumar Allady

    Current dynamic testing practice to obtain pile total capacity will not yield optimum capacity due to the strain incompatibility between the side and tip resistances during driving. Superposition of e

    Jan 1, 2018