Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Mining Mineral Processing Simultaneous Planning The Work Index ValueBy J. A. Caceres
Mining planning and mineral processing are almost two unconnected areas. The mining area builds its economical models considering the plant like a constant parameter: a constant throughput, an average
May 1, 2003
-
Leadership in Maintenance Best Practices - The Mining ExperienceLeadership "Organizing a group of people to achieve a common goal" Paradigms ? Rush to produce or cut costs. ? The most important thing after safety is production. ? We?ll take care of ??this?? o
Aug 1, 2013
-
Slurry Pump and Pipeline Performance Testing at the Georgia Iron Works Hydraulic LaboratoryBy G. R. Addie
"In February, 1975, the President of Georgia Iron Works Company, Mr. Tom Hagler decided to build a new hydraulic laboratory to water performance test all of the companies' centrifugal slurry pumps.Equ
Jan 1, 1980
-
Geometallurgical Modeling - The New Approach to Plant Design and Production Forecasting/Planning, and Mine/Mill OptimizationBy Dave Bulled, Chris Bennett, Glenn Kosick, Glenn Dobby
"Mining companies around the world are embracing geometallurgical modeling at a rapid rate, as senior executives realize that inputs must be properly measured if the output is to be managed effectivel
Jan 1, 2004
-
Discounted cash flow analysis — Methodology and discount ratesBy L. D. Smith
"This paper examines the impact of the various assumptions that go into an economic evaluation, and shows how these can be combined to show an exciting result that may not really exist. An example of
Jan 1, 2002
-
Implementation of a Flotation Expert Control System at the Raglan MineBy G. Couture
"The Glencore Raglan mine Concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. The nickel metallurgical plant was originally designed to process 100 tonnes per hour of o
Jan 1, 2015
-
The Texasgulf Concentrator ExpansionBy A. M. Hill
"This is an account of the expansion of Texasgulf's Timmins concentrator by the building of a fourth circuit.The original capacity of the mine and concentrator was 3.6 million tons per year of ore. In
Jan 1, 1979
-
The Fuelcell Mining Vehicles Development Program: An UpdateBy Marc C. Bétournay
Over the last four years, an international initiative, championed by Vehicle Projects LLC, the Fuelcell Propulsion Institute and Natural Resources Canada, has been active in carrying out research proj
May 1, 2003
-
L'Électroaffinage du Cuivre: Fin de l'Histoire?By Étienne Yvenou, Martin Désilets
Le procédé d’électroaffinage du Cu est nécessaire pour atteindre les niveaux de pureté requis pour les applications les plus courantes telles que son utilisation comme conducteur électrique ou thermiq
May 2, 2024
-
Proposed Mining and Milling Practice at Sherritt Gordon MineBy Staff
Introduction As the Sherritt Gordon property is still in the development stage, . it is rather difficult to write a proper account of the mining methods and milling practice that will be used. Whil
Jan 1, 1930
-
Follow-up of the uranium reconnaissance program in northwest ManitobaBy N. M. Soonawala
Detailed regional geophysical and geochemical surveys, ground surveys and drilling were undertaken to follow-up the federal-provincial Uranium Reconnaissance Program (URP) over the 27,OOO-km2 Kasmere-
Jan 1, 1979
-
Heterogeneity of Low-Grade Ores and Amenability to Sensor-Based SortingBy A. Mazhary
"Although ore sorting in mining is not a new concept, sensor-based sorting has failed to gain broad acceptance due to perceived challenges with the technology. In order to gain wider applications, thi
Jan 1, 2015
-
Biological Monitoring and its Use in the Mining IndustryBy S. W. Stogran
"Chemical and limited biological monitoring of mine and mill effluents are being used by regulatory agencies to monitor and control discharges to the environment. Amendments to the Federal Fisheries A
Jan 1, 1994
-
The evolution and future of overburden dewatering at Highland Valley Copper (ccb710cb-32e0-4645-ac2a-8a63f54a56a6)By P. A. Witt
"Highland Valley Copper is a conventional truck-shovel mining and flotation concentrator operation located 75 km southwest of Kamloops, British Columbia (Fig. 1).The ore is situated within a porphyry
Jan 1, 2005
-
Mineralogical Tracing of Metallurgical Results - The Sarcheshmeh Copper Mine CaseBy S. Banisi, H. R. Iran-Manesh, M. R. Shayestefar, H. Shekarchyan
"Flotation circuit of the Sarcheshmeh copper mine processes 41,000 t/d of ore at 0.9% Cu. Chalcopyrite and chalcocite are the main copper bearing minerals which are concentrated in three stages of rou
Jan 1, 2003
-
Elimination of the Pre-Aeration and Primary Filtration Circuits From the Dome Mill Flowsheet"Placer Dome Inc.'s Dome Mine is located in South Porcupine, Ontario and has been in production since 1910. In the past, the mill leach circuit was preceded by preaeration and primary filtration circu
Jan 1, 1992
-
Comparison of Flotation Grade Dynamics Enabled By Real-Time MeasurementBy F. E. du Plessis
"The distinction between data suitable for process control and data subject to aliasing only becomes quantifiable with the availability of rapid real-time measurements. Expecting the dynamics of flota
Jan 1, 2012
-
Towards a Worldwide Network of Education in Mineral EngineeringBy Hans de Ruiter
"Delft University of Technology, RWTH Aachen, Helsinki University of Technology and Imperial College established the Federation of European Mineral Programs (FEMP) in 1999 as a legal body to coordinat
Jan 1, 2004
-
A regressive mode of highwall failure in coal strip minesBy B. Stimpson, K. Kosar, K. Barron
"A number of high wall failures have occurred in some of the Alberta coal strip mines of a type called by the authors ""Multiple block plane shear slope failure "". They cause rapid deterioration of t
Jan 1, 1986
-
An in-Shovel Camera-based Technology for Automatic Rock Size Sensing and Analysis in Open Pit MiningBy Shahram Tafazoli
This article presents a novel technology for sensing the size of rocks after blasting in hard rock mines. Blast engineers require rock size statistics to carefully adjust the blasting parameters. The
May 1, 2009