Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Ground granulated blast-furnace slag for cemented mine backfill: production and evaluation

    By E. Douglas, V. M. Malhotra

    "This report presents the results of a laboratory study undertaken to evaluate ground granulated blast-furnace slag from Algoma Steel Corporation, as a replacement for Portland cement in cemented mine

    Jan 1, 1989

  • CIM
    Throughput and Recovery Improvements Following Commissioning of the Mount Milligan Mine

    By P. Miranda, K. Le, G. Maes, R. Peters

    "The Mount Milligan Mine, owned by Thompson Creek Metals Company Inc. (TCM), started operations in September of 2013. It is located between the communities of Fort St. James and Mackenzie and is the f

    Jan 1, 2015

  • CIM
    The Use of Fibre Reinforced Shotcrete Fill Retaining Walls with Engineered Drainage System to Achieve Safe and Efficient Hydraulic Fill Placement in Underground Voids

    Safe underground mine backfilling with hydraulic fill requires efficient fill drainage and stable fill retaining walls or bulkheads. If any or both the above two requirements are not satisfied, such

    May 1, 2007

  • CIM
    Updating the Lucky Friday Mill – Experiences in Revamping a Historic Milling Operation

    By Dale Dean, Bill Hancock, Raul Mondragon, Carlos Aguilar, Chris Martin

    "In 1942, commercial mining operations began in what is now the Lucky Friday Ag/Pb/Zn mine in Idaho’s Silver Valley. Wholly owned since 1962 by Hecla Mining Company, the mine has produced more than 14

    Jan 1, 2011

  • CIM
    A new Canadian shovel dipper design for improved performance

    By N. Shi, T. G. Joseph

    The design of dippers for cable shovels has essentially remained unchanged for the last 100 years. In the past 10 years, shovel manufacturers have started taking another look at dipper design, resulti

    Jan 1, 2006

  • CIM
    Information Strategy Planning on Nuclear Power Plant Project Management System

    By Son Hye Jin

    Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the

    Aug 1, 2013

  • CIM
    Geology of the Sustut Copper Deposit in B.C. (2d42b1e7-1c94-47a9-b4c1-62e26e60d034)

    By G. Harper

    "AbstractThe Suetut. Copper deposit, 230 miles northwest of Prince George, B.C., was discovered in August of 1971. Subsequent exploration has included 56,417 feet of surface diamond drilling in 139 ho

    Jan 1, 1977

  • CIM
    Changes in grade, volume and contained gold during the mining life-cycle of gold placer deposits

    By J. D. Bliss, G. J. Orris, W. O. Menzie

    "Analysis of gold placer data from gold placers throughout the world suggests that gold grades and volumes cannot be used to distinguish between most types of gold placers. Only the alluvial plain and

    Jan 1, 1987

  • CIM
    New Assessment Technique for LHD Vehicle Visibility

    Over the last three decades, the mining industry has been moving towards more underground mechanized mining methods and the number of LHD vehicles utilised has increased. The growth of mechanization a

    May 1, 2004

  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • CIM
    Characteristics of late Archean plutonic rocks from the Abitibi and Pontiac sub provinces, superior province, Canada

    By John N. Ludden, Maurice Rive, Hillar Pintson

    "Quelques soixante-dix-sept plutons présents dans la Sous-Province de Pontiac et dans la partie centrale de la Sous-Province de I’Abitibi ont fait I ’objet d’une reconnaissance systématique. Ils ont é

    Jan 1, 1990

  • CIM
    Comparative economics of bacterial oxidation and roasting as a pre-treatment step for gold recovery from an auriferous pyrite concentrate

    By S. R. Gilbert, C. O. Bounds, R. R. Ice

    "Many ores are upgraded to produce auriferous sulphide concentrates (principally pyrite) which are not amenable to direct cyanidation. Often these refractory gold-bearing concentrates contain undesira

    Jan 1, 1988

  • CIM
    Hydrothermal Alteration in Hydro-Fractured Athabasca Basin Sandstone: Distal Expression of Uranium Mineralization?

    By Jeanne B. Percival, Paul Ramaekers, Charles W. Jefferson, Pat A. Hunt, Eric G. Potter, Katherine E. Venance, William Davis, Sean A. Bosman

    "A 10-cm thick clay-rich layer near the top of the Manitou Falls Formation of the Athabasca Group is unusual in its breccia texture, alteration, and detrital mineral composition relative to the adjace

    Jan 1, 2013

  • CIM
    Improving Construction Environmental Metrics Through Integration of Discrete Event Simulation and Life Cycle Analysis

    By H. Golzarpoor

    Life Cycle Analysis (LCA) is a methodology for evaluating the environmental impacts associated with a product during its life cycle. LCA is identified as the most reliable method for verifying environ

    Aug 1, 2013

  • CIM
    Experiences with a New Generation Automated Long Hole Drilling Rigs at LKAB Kiruna Mine in Northern Sweden

    By Patrik Ericsson

    During the 90?s Atlas Copco and LKAB developed a pioneering fully automatic long hole production drilling system based on the Atlas Copco Simba W469 drill rigs. These drill rigs have since then drille

    May 1, 2007

  • CIM
    The Development of Process Mineralogy at Falcon Bridge Limited, and Application to the Raglan Mill

    By Norman O. Lotter, Lori Kormos, Greg J. Wilkie, Peter J. Whittaker, Johannes S. Stickling

    "Assessment of opportunities to improve mineral processing performance in existing concentrators and in describing undeveloped orebodies is key to improving the business case of a mining company. This

    Jan 1, 2002

  • CIM
    Geology of the Ore Fault Ni-Cu Deposit, Bird River Sill Complex, Manitoba

    By P. Walford, C. Mealin, D. Good

    "The geology of the Ore Fault Ni-Cu deposit has been reinterpreted in the light of recent studies of the geology of the Neoarchean Bird River Sill Complex and the occurrence of economic Ni-Cu and Zn-C

    Jan 1, 2009

  • CIM
    Comparison of Penzien and Wang analytical methods with the finite difference numerical method in seismic analyses of the Qazvin-Rasht (Kuhin) tunnel

    By F. Hassani, R. Mikaeil, B. Ferdowsi

    Two analytical solutions for estimating the ovaling deformation and forces in circular tunnels are widely used in engineering practice, due to soil-structure interaction under seismic loading. This pa

    Jan 1, 2008

  • CIM
    Ivanhoe New Horizons

    By Jess Harding

    Oyu Tolgoi investment agreement now in full, legal effect Successful completion of a series of conditions to 2009 Investment Agreement was announced March 31, 2010. Full-scale construction now set t

    May 1, 2010

  • CIM
    On-Line Flotation Simulator at Pyhäsalmi Mine

    By K. Zenger, J. Kaartinen, J. Huuskonen, S. Torttila, S. Lähteenmäki, J. Pietilä

    "Pyhäsalmi Mine in Finland has a long history of continuous process development. The concentrator processes Cu-Zn-sulphide ore with high recoveries. An on-line flotation simulator has been developed t

    Jan 1, 2015