Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Risk-Based Approach to Plant DesignBy Mike Fontaine
The success of a project is defined by meeting the financial performance objectives of the business case within a stipulated timeframe. Early in design, little information is normally available; the u
Jan 1, 2015
-
Techno-Economic Evaluation of Bulk Ore Sorting for Copper Ore at the Panaust Phu Kham OperationBy Hatch, A. Reple, W Valery
The mining industry is facing declining feed grades which require the mining and processing of larger volumes of material per tonne of product. Pre-concentration aims to remove barren material at as c
Jan 1, 2016
-
Experimental and Numerical Studies on Flow Characterstics in Rock Fracture Intersections Considering Influence of Intersecting AngleBy Y. Jiang, B. Li, R. Liu
"In this study, laboratory flow tests were conducted on 2-D artificial rock fracture network models containing a single intersection constituted by two inlet and two outlet branches. Three models with
Jan 1, 2015
-
The quality of Western Canadian coking coalBy David E. Pearson
"Western Canadian coking coals are located in the Rocky Mountains arid foothills of British Columbia and Alberta. They are typical of non-marine coals, characterized by total sulphur contents of less
Jan 1, 1980
-
Corrosion Behavior of Forged AA6082 Aluminum Alloy From Different FeedstockBy P. Gautier
Current feedstock in the aluminum hot forging processes can be used in the cast or extruded forms. The microstructural variation between as-cast and extruded materials could result in different mechan
Jan 1, 2011
-
The Relation Between the Aeration Characteristics of Flotation Columns and Metallurgical PerformanceBy C. Lara-Valenzuela, R. Perez-Garibay, F. López-Saucedo, A. Uribe-Salas, L. Magallanes-Hernandez
A relationship between gas dispersion parameters, namely gas rate (Jg), gas holdup (Eg), average bubble size (db) and bubble surface area flux (Sb), with the metallurgical performance (e.g., grade and
Jan 1, 2009
-
Bioleaching of Low Grade Sulphide Ore in Column ReactorsBy Jae-Chun Lee, Sadia Ilyas
We investigate the technical feasibility of bioleaching of metals from low grade sulphidic ore. Experiments were conducted with an adapted consortium of Sulfobacillus thermosulfidooxidans and Thermopl
Jan 1, 2014
-
Informationization of Mines: From Digital Mining to Smarter MiningBy Shanjun Mao
This paper summarizes current achievements of Digital Mining in China, puts forward the concept, framework and key technology of Smarter Mining, and finally points out that there is still a long way t
Aug 1, 2013
-
Estimation of the in Situ Block Size in Jointed Rock Masses Using Three-Dimensional Block Simulations and Discontinuity MeasurementsBy M. Pötsch, A. Kluckner, P. Söllner, W. Schubert
"The in situ block size is a key parameter in the geomechanical characterization of rock masses. It describes the fracturing of the rock mass and thus is a measure for the degradation of the rock mass
Jan 1, 2015
-
Utilization and Implementation of Geothermal Systems and Ground Source Heat Pumps for Underground Mine CoolingBy K. Robertson, K. A. Scalise, K. C. Kocsis, M. B. Teixeira
"Many deep and highly mechanized underground metal mines require cooling. In many cases, appropriate working conditions might be fulfilled by ventilation alone, but some require the implementation of
Jan 1, 2019
-
The Use of Oxygen Instead of Air in Bioleaching Operations at Medium TemperatureBy D. Ibarra, J. Jacob, A. G. Guezennec, P. d’Hugues, A. Archane
The lack of adequate gas mass transfer is a rate limiting step in many bacterial leaching processes. Oxygen often becomes a limiting factor because of its low solubility compared to the high demand in
Jan 1, 2016
-
Ventilation on Demand ? The Impact of Sensors, Installation, Control Strategies, Commissioning and Advanced Controls PerformanceBy J. Janzen
The cost to supply ventilation may exceed 40% of the total mine energy cost for underground mines and is often higher for deeper mines. The goal of Ventilation-on-Demand (VOD) is to ensure that the re
Aug 1, 2013
-
Optimising Circuit Design for Gravity Gold RecoveryTo determine the optimal circuit configuration for gravity gold recovery consideration should be given to a range of factors in addition to the efficiency of the gravity circuit, including capital cos
Jan 1, 2011
-
Preliminary Implementation of a Predictive Control for Ventilation Systems in Metro StationsBy M. Vaccarini
In this paper a possible methodology to supplement a predictive control approach is reported. The benefits deriving from the application of a predictive control on complex buildings lay on its capabil
Aug 1, 2013
-
Operational Strategy at Chagres Smelter to Maximize Installed CapacityBy R. Bonifaz, R. Subiabre
The Chagres Smelter, part of the Anglo American plc group, situated 80 Km north of Santiago in Chile, completed a series of operational improvement in 2005 resulting in an optimum capacity in its oper
Jan 1, 2007
-
Mechanical Properties of Precipitation Hardened Supersaturated Al-Sc-ZrBy Joseph Licavoli, Paul Sanders, Yang Yang
"Al-Sc-Zr alloys form thermally stable L12 precipitates which provide high temperature strength. Although the overall fraction of L12 Al3Sc and Al3Zr may be increased by increasing scandium (Sc) and z
Jan 1, 2018
-
Predicting and Preventing Spreading of Fines in Submarine Tailings DisposalBy E. Larsen
Marine tailings disposal may in some cases be the best solution to one of mining’s major environmental problems. The public standing of this solution is poor, partly because of past bad practices. Amo
Jan 1, 2016
-
Aspects of Wear in Mill Circuit PumpsBy C. I. Walker
Field tests at a number of large mineral processing operations have been undertaken to better understand the wear life impact of different aspects of pump design, materials of construction and mainten
Jan 1, 2012
-
Relationship between Porosity and Surface Deposit Coverage for Wire and Arc Additive Manufactured Aluminium Alloy 2319By K. E. Harley, M. J. Whiting, T. J. Sabin, E. M. Ryan, J. F. Watts
"Wire and Arc Additive Manufacturing (WAAM) has the potential to enable a very significant reduction in buy-to-fly ratio compared to conventional manufacturing through the ability to build near-net sh
Jan 1, 2018
-
Technologies required for safe and profitable deep level gold mining, South AfricaBy P. H. Willis
Since the 14th CMMI conference, held in Edinburgh in 1990, at which a paper was presented by the author (Willis, 1990) reviewing the role of integrating new technology as a survival strategy for South
Jan 1, 2000