Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Narrow-Vein Mining Project: Economical Realities and Innovation Perspectives for the Extraction of Narrow Vein Deposits

    By Jean-Marie Fecteau

    The gold mine sector is presently facing low gold prices as well as technological challenges. Its competitiveness and survival will depend on new mining methods and equipment to improve ore extraction

    Oct 1, 2001

  • CIM
    Expérience de la Mauritanie en matière d?environnement dans le secteur minier :1999 ?2010

    By Yolaine le Beau

    Plan de la présentation Le contexte mauritanien La situation de l?environnement en 1999 L?évolution de 1999 à 2010 Bilan La situation de l?environnement en 2011 Le contexte mauritanien Pays d

    May 1, 2011

  • CIM
    Using the discrete-element method to investigate ball milling power draw, load behaviour, and impact energy profile

    By M. B. Kime

    "Discrete-element method (DEM) modelling is a powerful tool for studying particulate systems within the mineral processing industry. DEM simulations were conducted to investigate the power draw, load

    Jan 1, 2017

  • CIM
    New Opportunities for Closed Mining Sites: Bioprospecting for Antibacterial Agents

    By G. N. A. Senhorinho, J. A. Scott, C. A. Laamanen

    "Closed mine sites are widely regarded as a negative asset due to their legacy of environmental impacts. These sites are often characterized by waterbodies with elevated metal concentrations and low p

    Jan 1, 2019

  • CIM
    The Future of Gold

    By Arthur Notman

    For the period January 1st, 1942, to January 1st, 1946, the American Bureau of Metal Statistics records the gold production of the world as 118,788,000 fine ounces. If we include 1946 at the same rate

    Jan 1, 1947

  • CIM
    Encapsulation of Mercury in Gossan Tailings Murray Brook Mine, New Brunswick, Canada

    By Robert Harris, Peter Pheeney

    "The Murray Brook gold mine operated from September 1989 to March 1991. Approximately 1.2 million tonnes of gossan were mined from an open pit and treated at a rate of 900 tonnes per day. The facility

    Jan 1, 2001

  • CIM
    Long-term planning at Raglan (b8ce356e-c666-4ad8-a03a-11ba76659079)

    By L. W. T. Weitzel

    "This paper reviews the Falconbridge- SMRQ’s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to

    Jan 1, 2003

  • CIM
    Designing and developing an integrated cave management system

    By A. van As, J. McGaughey, M. J. Mol, R. Tosen

    Geotechnical monitoring is a key element of the successful management of a block cave mine. The interrelationships between production and various monitoring datasets are often not realized due to a la

    Jan 1, 2014

  • CIM
    Effluent Treatment with Toxicity Control at Placer Dome (CLA)’S Dome Mine

    By Trevor Yeomans, David Yaschyshyn

    "Placer Dome (CLA) operates the 90-year-old Dome Mine, in South Porcupine, Ontario.The milling operation currently processes 5 million tons of ore per year, from both the underground and Open pit mini

    Jan 1, 2001

  • CIM
    Unlocking Value through Flotation Equipment Maintenance

    By P. Tolvanen, A. Jalili

    "When hard times strike in the mining cycle, sites tighten their belts and focus on lowering their unit costs. Lower unit costs can be achieved by reducing expenditure, increasing production, or by a

    Jan 1, 2015

  • CIM
    Mechanical properties and fatigue resistance of rails welded with the aluminothermic method

    By J. P. Sancho, J. M. Duart, J. I. Verdeja, J. O. García

    Following a short review of the history of rails used in the transport of passengers and goods, this paper describes the process for rail fabrication, rail structure, and properties, and summarizes th

    Jan 1, 2007

  • CIM
    Restauration Du Site Minier Poirier (Joutel) - Expériences Acquises Et Suivi Des Travaux

    By Richard Maurice

    RÉSUMÉ La restauration du site minier Poirier, à Joutel s?est déroulée entre 1998 et 2001. Le principal élément des travaux a été la restauration du parc à résidus et des zones d?épanchement qui tot

    Nov 1, 2002

  • CIM
    A Physical Volcanological, Chemostratigraphic, and Petrogenetic Analysis of the Little Falls Member, Tetagouche Group, Bathurst Mining Camp, New Brunswick

    By S. R. McCutcheon, D. R. Lentz, W. S. Downey

    "Abstract - The Little Falls member of the Nepisiguit Falls Formation is situated in the northern part of the Brunswick Belt of the Bathurst Mining Camp and has been interpreted as the distal equivale

    Jan 1, 2006

  • CIM
    K-Ar and Rb-Sr dating and the genesis of tungsten at the Clea tungsten skarn property, Selwyn Mountains, Yukon Territory

    By K. M. Tompson, R. L. Armstrong, C. I. Godwin

    "Tungsten skarn deposits on the Clea property in the Selwyn Mountains, Y. T., are related genetically to a quartz monzonite stock, about 500 metres in diameter at the surface. Lower Paleozoic sediment

    Jan 1, 1980

  • CIM
    Some Crushing and Grinding Considerations in Plant Design

    By H. A. Steane

    "This presentation will cover some crushing and grinding considerations in plant design and operation. There is nothing basically new in the subject matter presented here; however, the viewpoint and i

    Jan 1, 1976

  • CIM
    Petrology and alteration of the Siscoe Stock at the Siscoe Gold Mine, Val D'or, Quebec

    By Laszlo Imreh, Pierre Trudel, André C. Tessier

    "The Siscoe gold mine is ranked as the fourth largest mine in the history of the Val d' Or mining district with a total production of 27.4 tAufrom1929 to 1949. Most of the gold mineralization occurred

    Jan 1, 1990

  • CIM
    The Red Dog VIP mill optimization project. Part A: Rectifying the shortage of flotation capacity

    By George Hope, Brigitte Lacouture

    "The Red Dog mine has increased mill throughput most years since start-up. Although flotation equipment has been added over the last 10 years, the Red Dog metallurgical performance has been restricted

    Jan 1, 2003

  • CIM
    Diamonds in Canada

    By J. J. Brummer

    The possibility of diamonds occurring in Canada was first raised by W. H. Hobbs in 1899, who concluded: "that the apex of the fan of diamond distribution probably lies somewhere in the strip of the t

    Jan 1, 1978

  • CIM
    Design Considerations for Mine Waste Management at the Meadowbank Gold Project

    By Cameron J. Clayton

    Cumberland Resources Ltd. is currently planning to develop the Meadowbank Gold Project located some 70 km north of Baker Lake, Nunavut in the eastern Canadian Arctic region. The Meadowbank Gold Projec

    May 1, 2004

  • CIM
    Stratigraphic Positions of Mineralized in the Mount Bourbeau and Lac Berrigan Regions and their Significance

    By J. Guha, A. Gobeil, P. Pilote, A. Tremblay, E. Dimroth

    The Mount Bourbeau Lac Berrigan area is located just to the north of the Town of Chibougamau. The axial trace of the Chibougamau syncline borders the northern part of both areas. The area contains Arc

    Jan 1, 1984