Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Sampling and Blending Practice for a 5000 Tonne/Day Iron Blast FurnaceBy Brown D. N, Troth D. A
Large blast furnaces demand high standards of preparation of feed materials which must meet tight specifications of chemical and physical quality. Measurement of these factors must be expeditious b
Jan 1, 1976
-
Management of Core Geotechnical Risks for Underground Mining ProjectsThis paper discusses the concepts of core risk associated with mining projects and operations and illustrates the types of core geotechnical risks and consequences that may relate to a range of differ
Jan 1, 2003
-
Belt Conveyors In The Mining IndustryAlthough the title of this paper permits a very broad scope for discussion, I propose to deal mainly with those aspects of design part- icularly related to rook filling, the'theme of this confe
Jan 1, 1973
-
The Role of Conditioning Energy in Emulsion FlotationThe effect of conditioning energy input on the metallurgical results of an emulsion flotation process has been attributed by previous authors to a detergency process. This publication shows that suc
Jan 1, 1969
-
Extractive Metallurgy-Safety Regulation in Western AustraliaBy Jones
Extractive metallurgy in the mining industry in Western Australia has diversified and increased in the last 11 years. Before 1980, the industry mainly produced alumina, nickel, mineral sands and iron
Jan 1, 1992
-
Design, Construction and Commissioning of A 4 Tonne/Hour Matte Fuming Pilot PlantBy Lightfoot BW, Foo KA, Conochie DS
Aberfoyle Limited operated a matte fuming pilot plant, incorporating a SIROSMELT furnace in 1980/81. This plant was a significant advance in both smelting and tin extraction technology. Important
Jan 1, 1984
-
Catastrophe Analysis of Coal Oxidation Process Under Low TemperatureBy W Lu, D Wang
Study of coal oxidation at low temperatures forms the basis of investigating the inherent properties of spontaneous combustion of coal. In general, the process of coal oxidation at low temperatures is
Jan 1, 2005
-
The Use of An-Fo Blasting Agent at Great Boulder MineTo enable AN-FO .tòo' be used on an equal .weight basis wish Nitro Gl reerin.e expl3oòsives r smaller diameter bore holes became necessary With consequent modifications to drill steel and burd
Jan 1, 1964
-
Driving Through Broken Ground. Standard Method Adopted at Central Mine, Broken HillOwing to the 'creeps' and consequent movements in the mines, followed by the recent fire in the southern workings, the whole of the orebody above the 800 ft. level is now very much crushed
Jan 1, 1932
-
Practical Mine Dewatering by Means of Surface Drilled WellsMine dewatering has long been a problem with mines and some of the shallowest mines have the biggest problems. Machinery was developed by the ancients for raising water by rope buckets with treadmi
Jan 1, 1988
-
Foundations of Sustainable Resource ProcessingBy P Sutton
The global goal of Sustainable Development is not achievable without major changes in the way goods and services are delivered and material needs are satisfied, which requires tremendous innovation in
Jan 1, 2002
-
Fordertechnik Dewatering ScreensThis paper will discuss Fordertechnik dawatering screens and their application in process industries. Fordertechnik screens were designed for the dewatering of deslimed, wet fines materials encoun
Jan 1, 1984
-
Lead Flotation Practice And Control At North Broken Hill LimitedBy Sandy W
This paper examines the effects of a significant number of plant alterations and modifications to the lead flotation circuit during the past five years. Metallurgical effort is directed largely at
Jan 1, 1983
-
Paste Thickening of Tailings at the Clermont Coal Preparation PlantPaste Thickening of Tailings at the Clermont Coal Preparation Plant
Sep 13, 2010
-
Commissioning of the Olympic Dam SmelterThe production of copper by the Outokumpu direct blister process commenced in July 1988. The problems and incidents encountered in commissioning the main smelter equipment are outlined. Early diffi
Jan 1, 1989
-
Examining the Concept of Capacity Utilisation and Efficiency as Applied to Mining EquipmentBy B J. van Loggerenberg
The capital cost of major items of mining equipment is very high. The operating cost of such equipment is also high. It is therefore important that such expensive equipment is used productively. To th
Jan 1, 2003
-
Hydraulic Fill at Osborne MineBy J A. Brown
Osborne Mine commenced hydraulic filling of three stopes in April 1999. Two of these stopes experienced barricade failures in July 1999 and January 2000. As a result, a review of hydraulic filling was
Jan 1, 2002
-
Mine Planning and Grade Control - GoldsworthyBy Newman H. A
Goldsworthy Mining Limited is currently mining iron ore at an annual rate of 7 million tons from several small orebodies, each of which exhibit wide variations in iron, phosphorus, silica and alumi
Jan 1, 1973
-
The Critical Role of Representative SamplingBy K H. Esbensen
The critical role of representative sampling is featured and illustrated by selected examples from the geosciences and beyond. As there already are many demonstrations of the potential (and potentiall
Aug 21, 2012
-
Pit-Blend Optimisation - A Case Study in Iron OreBy Piotto P
Pit optimisation algorithms are designed to produce a pit with maximum value, but for certain minerals like iron ore, limestone, coal, etc, it is also necessary that the designed pit contains ore whic
Jan 1, 1996