Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    New Nazca Plate Reconstructions and Implications for Intermontane Basin Evolution in the Andes

    Intermontane valleys form unusual features of compressive mountain belts both in the sharp topographic break they represent and in the strike-slip displacements often associated with the valleys. S

    Jan 1, 1987

  • AUSIMM
    A Case Study of the Development, Engineering and Construction of a Biological Oxidation Plant for a Refractory Pyrite-Arsenopyrite Gold Ore

    By M Binks

    This paper presents a case study that describes the selection, development, engineering and construction of a process plant for the biological oxidative pre-treatment of a refractory pyrite-arsenopyri

    Jan 1, 2004

  • AUSIMM
    Innovative Ground Support System

    By Fabjanczyk M. W

    Artificial ground support has developed into a refined science over the past 20 years. From reactive support systems such as timber props and steel supports, to active systems such as roof bolts a

    Jan 1, 1992

  • AUSIMM
    Some Environment Aspects of Aluminium Production

    Aluminium in Australia, and in fact all round the world, is made virtually exclusively by the Hall-Heroult process, whereby the metal is derived from the electrolysis of alumina dissolved in an ele

    Jan 1, 1977

  • AUSIMM
    A Neural Network Based Method for Modelling Spatio-Temporal Behaviour of Environmental Pollutants

    By Durucan S

    Uncertainty due to spatial and temporal variability of different pollutants found in soil, water and air is an important issue in the modelling of environmental impacts. Recognition of spatial envir

    Jan 1, 1995

  • AUSIMM
    Overall Concepts in Drilling for Roof Bolting

    By Tonegato S, Wood M

    The lack of objective data on roof bolting machines, bits, rods and overall system has created the need for an objective assessment of roof bolting. This work outlines a test rig for such objectiv

    Jan 1, 1986

  • AUSIMM
    North Mine - A Case Study

    By Terlich R. E, Finlayson J. M

    A combination of high virgin rock temperatures, deep workings and extensive utilisation of heavy diesel equipment has presented North Mine (A Division of North Broken Hill Limited) with challenging

    Jan 1, 1988

  • AUSIMM
    Regeneration of 2-Naphthol from Cobalt Precipitate

    By Haigh C. J

    A process has been developed to recover at least 75% of the 2-naphthol contained in cobalt precipitate produced during the removal of cobalt from electrolytic zinc plant solution. The recovered mat

    Jan 1, 1977

  • AUSIMM
    Fuel Conversion at Toyo Smelter

    By Nagai K, Moriyama K

    Toyo smelter has been making s veral efforts to reduce and diversify energy for dealing successfully with such :n:;rgy problems as the first and second oil crises. ::,specially it is one of th:; m

    Jan 1, 1987

  • AUSIMM
    Ensure Your Fleet is Always Operating at its Top Efficiency Using Advanced Monitoring and Benchmarking Technology

    By Rogers R, Kinnane T

    In a typical open cast mining operation, investigation of how existing truck performance compares with the highest achievable truck performance is largely neglected. This paper addresses this issue

    Jan 1, 1994

  • AUSIMM
    Slope Stability Radar for Managing Rock Fall Risks in Open Cut Mines

    By N Harries

    The management of risks associated with slope instability is an essential process in the safe and economic operation of open cut mines. The æslope stability radarÆ (SSR) has been developed to better m

    Jan 1, 2007

  • AUSIMM
    Fluid and Metal Sources in the Mt Carbine Tungsten Deposit, North Queensland, Australia

    By Forsythe DJ, Sun S-S Andrew AS

    Paragenetic, fluid inclusion, stable isotope, and 87Sr/86Sr and 143Nd/144Nd isotope studies of the Mt Carbine tungsten deposit in North Queensland provide information on the sources of the mineralis

    Jan 1, 1987

  • AUSIMM
    Prevention of Scaling and Corrosion of Titanium Alloy Heat Exchanger Tubes at the Risdon Electrolytic Zinc Refinery

    Scale build-up in titanium palladium alloy spent electrolyte heat exchangers in the residue treatment plant commissioned at Risdon, Tasmania in 1971 was shown to be a mixture of manganese dioxide and

    Jan 1, 2005

  • AUSIMM
    Simulation of Heap and Dump Leaching Processes

    By Yusuf R

    Many heap and dump leaching processes involve competitive, complementary and sequential reactions between multiple minerals and reagents. A comprehensive model has been developed to deal with thes

    Jan 1, 1984

  • AUSIMM
    Coal - Paper No. 8 Use Of Optimal Techniques To Minimise Moisture Retension In Fine Coal Filtration

    By Sergeant G. D, Norman J. R

    The importance of reducing the moisture content of fine coal, the nature of the retained water and the means of its removal are discussed. A statistical technique, using a balanced block design, was

    Jan 1, 1969

  • AUSIMM
    The Port Hedland Hot Briquetted Iron Project

    By Bensley C. N

    In June 1995, BHP announced that it would build a Hot Briquetted Iron (HBI) plant and associated beneficiation, materials handling and infrastructure facilities at Port Hedland, Western Australia. T

    Jan 1, 1996

  • AUSIMM
    Application of EDM Techniques to the Routine Survey of Undergound Mines

    By Sloan GJ, Lysnar RD

    Since the of Bergstrand's Geo-dimeter in 1946, and Wadley's Tellurometer in 1956, there have been numerous Electromagnetic Distance Measurement (EDM) instruments produced throughout the worl

    Jan 1, 1984

  • AUSIMM
    Pilot Study on Blast Movement Monitoring at Geita Gold Mine

    By F Mwijage

    "The benefits of measuring blast movement to reduce ore loss and dilution have been recognised by many people for many years and various methods have been used with limited success. Geita Gold Mine is

    Mar 26, 2012

  • AUSIMM
    Selective Mining at Ok Tedi - Past, Present and Future

    Selective open pit mining for gold has been in progress at Harbour Lights since the onset of mining in March 1985. Selective mining techniques used are similar to those in other recently opened gold m

    Jan 1, 1986

  • AUSIMM
    Underground Infrastructure Requirements for Underground Cave Mining Operations

    By A G. L Pratt, G F. Dunstan, A Leonforte

    The selection of the material sizing and mine dewatering systems are important elements in the development of a large-scale, high tonnage (greater than 4 Mt/a) underground hard rock mine. The sizing s

    Jan 1, 2008