Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Fundamentals and Applications of Metal-Ligand Complexes of Gold(I/III) in Non-Cyanide Gold Processes

    Despite the research interest on non-cyanide gold lixiviants over the past three decades all the non-cyanide gold processes are still at the developmental stages with limited understanding on solution

    Jan 1, 2004

  • AUSIMM
    Kinetic Modelling Associated with Coal Carbonisation

    By Quinlan M. J, Ratcliffe J. S

    Chemical kinetics is a dependent process which usually correlates the rate at which a reaction proceeds with the mechanism descriptive of the manner by which reactive particles interact. Given the la

    Jan 1, 1975

  • AUSIMM
    Roof Support of the Wongawilli System

    Legislation up to the early 1950s prevented the mechanical extraction of pillars. The mines operating at that time had formed extensive areas of pillars. When permission for the mechanical extractio

    Jan 1, 1974

  • AUSIMM
    Mechanical Sampling Plants

    In 1997, the Australian coal industry through Standards Australia committee MN-001 Coal and Coke recognised the need to produce a Standard giving some instruction on how to inspect and audit mechanica

    Jan 1, 2005

  • AUSIMM
    The Planning and Design of the Prospect to Pipehead Tunnel

    The Prospect to Pipehead Tunnel is a component of the Sydney Water Board's multi-million dollar Drinking Water Quality Program to improve the quality of Sydney's potable water supply to meet

    Jan 1, 1993

  • AUSIMM
    Practical Conditional Simulation for Geologists and Mining Engineers

    By Coombes J, Richards W. L

    The objective of this paper is to illustrate, in a practical way, how both geologists and mining engineers can use conditional simulation to add value to their decisions. Inherent assumptions, requi

    Jan 1, 1998

  • AUSIMM
    Future Development of LaTrobe Valley Brown Coal for Power Generation

    By Van Heuzen JA

    The extensive deposits of brown coal in the Latrobe Valley form the major solid fuel resource in Victoria and are the energy source for most of the State's power generation. This paper describ

    Jan 1, 1982

  • AUSIMM
    The Cadjebut Zinc Operation

    The Cadjebut Mine is located 80 km southeast of Fitzroy Crossing. Cadjebut is owned 58 per cent by BHP Minerals and 42 per cent by Billiton Australia. Cadjebut is a 'Mississippi Valley Type&apo

    Jan 1, 1992

  • AUSIMM
    Mining A 100 Million Tonne Orebody Without Subsidence (1eceb353-235c-4b84-8df9-2b3937c9c8f3)

    The major copper orebody at Mount Isa is being extracted at a rate of four million tonnes per year. The method used requires an equivalent rate of back filling with (mainly) cemented fill. There w

    Jan 1, 1980

  • AUSIMM
    Geostatistical Texture Modelling in Enhancing Ore Reserve Estimation in Base Metal Deposits

    By Dimitrakopoulos R

    Ore textures in base metal deposits are an important factor in the liberation of the economic components of the ore, metal recovery and reagent consumption during beneficiation. Optimising the mine

    Jan 1, 1997

  • AUSIMM
    The Enhancement of Galena Flotation Using Cyanide

    By Pietrobon M. C, Ralston J, Smart St C R

    In an on-going study of the chemistry of base metal sulphide flotation, the effect of the inclusion of cyanide in the reagents suite has been studied, with special reference to ore from Pasminco Min

    Jan 1, 1991

  • AUSIMM
    Large Compact Bucket Wheel Excavators

    Most compact bucket wheel excavators in use are in the small to medium range. Large compact bucket wheel excavators compete directly with con- ventional longer boom excavators which have operational

    Jan 1, 1989

  • AUSIMM
    The Application of Automated Samplers in Copper/Nickel Processing

    By J E. Powalisz

    "The application of automated sampling techniques can help to provide a representative sample of process fluids and slurries that provide data for controlling process, custody transfer and quality ass

    Jul 29, 2014

  • AUSIMM
    Effects of Open Fire on Ventilation in Coal Mines

    By S K. Ray

    Open fire in a mine gallery causes large-scale damage to property and sometimes precious lives. Such fires produce two distinct effects, the throttle effect and the buoyancy effect. These effects dist

    Jan 1, 2005

  • AUSIMM
    Protection of ?Tunnels in their Future Environment

    By A L. Bennett

    It is well understood that designers and constructors must protect the existing surroundings of tunnel construction, particularly in the selection of excavation methods, ground support and waterproofi

    Sep 17, 2014

  • AUSIMM
    Application of Ground Magnetic Surveys over Heavy Mineral Sand Strands to Increase Confidence in the Interpreted Continuity of the Modelled Resources

    By V O’Brien

    The suitability of magnetic surveys flown at low altitudes to identify buried heavy mineral (HM) strands has long been accepted. This is despite the low intensity magnetic response often obtained from

    Oct 5, 2011

  • AUSIMM
    Flotation Process Control Optimisation at Prominent Hill

    By J Lombardi

    OZ Minerals' Prominent Hill copper-gold concentrator is located 130 kilometres south east of the town of Coober Pedy in the Gawler Craton of South Australia. The concentrator was built in 2008 an

    Aug 8, 2011

  • AUSIMM
    Shift Roster Modification to Increase Productivity at PT Freeport Indonesia Underground Mine

    By B Ganesia, H Sahupala

    PT Freeport Indonesia is a copper-gold mine operation located in West Papua, Indonesia about 3500 km east of Jakarta. Current ore production is about 270 000 tpd, of which 30 000 tpd comes from underg

    Jan 1, 2002

  • AUSIMM
    The use of Conditional Simulation for Drill Hole Spacing Evaluation and Decision-Making in Telégrafo Project, Northern Chile

    By O Rojas

    The Telégrafo copper – gold deposit is located in the Centinela district of the Antofagasta region in northern Chile. Telégrafo is a porphyry copper deposit of Eocene – Oligocene age which h

    Aug 22, 2011

  • AUSIMM
    Development of Robot System for Automatic Assembling of Bolted Segments

    By Harada M, Katsuta S

    In order to shorten the time taken to com- plete shield tunnel excavation work, reduce labor costs and to improve safety, an automatic assembly robot system for the segments used has been developed

    Jan 1, 1987