Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Application of Safescape Ladders at the Cracow and Golden Grove Operations

    By B Hawkins, S Durkin, V Lawrence

    The requirement for secondary egress from underground workings has long been regulated in Australia. Escape way systems have evolved from simple airleg rising ladders and timber ladders to steel galva

    Mar 24, 2014

  • AUSIMM
    Review of Variogram Properties and Remarks on its Use in Process Control

    By D M. Frantois-Bongarton

    Variograms can be powerful tools for the analysis and control of process streams and their sampling. Their uses and proper utilisation have been described somewhat unclearly to date, and their limitat

    Aug 21, 2012

  • AUSIMM
    Stabilising and filling the Beaconsfield Hart Shaft

    By A Turner, P Hills, D Johnson

    Underground mining for gold began in Beaconsfield in 1877 and development of the Tasmania Mine saw the sinking of multiple shafts, including the Hart Shaft over the ensuing 35 years. The mine closed i

    Nov 30, 2018

  • AUSIMM
    Evolution of Cretaceous - Recent Drainage Networks and Distribution of Associated Gold Placers in Otago and Southland, New Zealand

    The development and distribution of gold placers in Otago û Southland is related primarily to the evolution and architecture of three distinctly different drainage networks that developed during and s

    Jan 1, 2006

  • AUSIMM
    Seismic Design of Upstream-raised Tailings Storage Facilities in a Semi-arid, Low-seismicity Setting

    By D A. Williams, P J. Chapman

    Constructing upstream raises with tailings is an accepted and cost-effective practice in Western Australia, where the climatic conditions are favourable, desiccation (and hence overconsolidation) occu

    Jul 27, 2015

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    The Use of High-Water Rapid-Solidifying Material as Backfill Binder and its Application in Metal Mines

    By Liu Wenyong, Huang Yucheng, Yang Ba

    High-water rapid-solidifying material, called æhigh-water materialÆ, is a new material developed by the authors over many years. The material can solidify nine times its volume of water into solid. Th

    Jan 1, 1998

  • AUSIMM
    Future Climate – Is Heat Stress a Real Risk for the Future and How Can We Better Manage It?

    By C Killip

    Working in Australia’s harsh climate can have a significant impact on the health, safety and productivity of our teams, but is our working environment expected to be more prone to heat stress in the f

    Nov 4, 2015

  • AUSIMM
    Computational density functional theory study of triazine adsorption on sperrylite (100) surface

    By X Zhang, B McFadzean, P E. Ngoepe, B Nemutudi, P P. Mkhonto, S Pikinini

    There is still a huge challenge in efficiently recovering the arsenides minerals that are largely concentrated in the Platreef Bushveld Complex which constitutes about 21 per cent of the platinum grou

    Aug 24, 2022

  • AUSIMM
    Control System Selection, Strategy and the Future at Pasminco Mining - Broken Hill's Southern Concentrator

    In 1987 the control strategies at the then ZC Mines' New Broken Hill Consolidated concentrator were a miscellaneous mixture of computer hardware and technology for ISA, grinding and residue thi

    Jan 1, 1991

  • AUSIMM
    Practical Considerations and Shortcuts in Sampling

    By D M. Frantois-Bongarton

    "A few situations are first reviewed where practical shortcuts lead to acceptable solutions where none seemed to be possible. These include: The solving of many complex sampling optimisation problem

    Aug 21, 2012

  • AUSIMM
    The Mineralised Rift Valleys of Tasmania

    By King D, Dickinson S. B, Matheson R. S

    Commencing in 1956, Rio TInto Australian Exploration Pty Limited in association with Electrolytic Zinc Co of Australasia, Limited, has been carrying out a mineral prospecting program in North-West Tas

    Jan 1, 1994

  • AUSIMM
    Grade Control in Underground Gold Vein Operations - The Role of Geological Mapping and Sampling

    By J B. Collier, R M. Fraser, O Dahl, I M. Platten

    Grade control is a process of maximising value and reducing risk, through the delivery of quality tonnes to the mill via the accurate definition of ore and waste. It essentially comprises data collect

    Jan 1, 2009

  • AUSIMM
    Closure Planning Lessons Learnt from the Century Mine

    By J Crosbie, M Lord, R Bitencourt, P Defferrard

    The MMG Century mine, which is the largest zinc/lead mine in Australia, began operating in 1999 and ceased mining from the open pit in July 2015, with processing completed in early 2016. Closure plans

    Jun 22, 2016

  • AUSIMM
    Accounting for Vegetation Dynamics in Landform Evolution Modelling

    By G R. Hancock, S Grant, T Whiteside, J B. C Lowry, J Boyden, T J. Coulthard

    Physically-based landform evolution models (LEM) provide a spatial framework to forecast the long-term geomorphic stability of post-mining landscapes. When used to test the relative stability of diffe

    Jun 28, 2016

  • AUSIMM
    The Managalase Volcanic Field and Associated Mineral Occurrences, Papua New Guinea

    The Managalase area is remote and little visited by geologists or prospectors. Yet it holds the key to the tectonics and petrology of this part of Papua. The eastern Managalase plateau (M, Figure 1) l

    Jan 1, 1999

  • AUSIMM
    The Use of Reverse Cleaning in Testwork on Currawong Copper-Zinc Ore

    Laboratory testwork was carried out on an overall orebody composite, of 2.9 per cent Cu and 4.2 per cent Zn, prepared from drill core taken from the Currawong fine-grained, copper-zinc massive sulphid

    Jan 1, 1999

  • AUSIMM
    The Resource Management Act 1991: Its Implementation in Otago

    The Resource Management Act has been in force now for approximately ten months. This Act, and the Crown Minerals Act which accompanied it, have substantially changed the manner by which mining operati

    Jan 1, 1992

  • AUSIMM
    Tasmania's Mining Heritage

    The region we call the West Coast is acknowledged as one of the richest and most diverse mineral provinces in the world. It's the most rugged part of Tasmania and our island is one of the most ru

    Jan 1, 1993

  • AUSIMM
    Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle Mine

    By G B. Smith

    Barrick (Australia Pacific) Limited initiated a trial of Caterpillar’s Minegem autonomous loader technology in 2009 at the Kanowna Belle mine in Kalgoorlie. Autonomous loader technology offers the pot

    Mar 21, 2011