    Amax Coal’s Delta Mine – Medium-Sized, High-Sulfur Operation Survives Markets Challenges

    By Steve Kral

    Amax Coal Industries Inc.'s Delta Mine is a medium-sized. high-sulfur coal producer that has lived up to the challenges posed by nearly six decades of a highly competitive domestic coal market.

    Jan 1, 1993

  • DFI
    The Synergy Between Theory And Practice In Geo-Engineering

    By Bas R. Hemmen

    GeoBrain is a facility at GeoDelft with the purpose to provide society with all relevant geo-engineering knowledge and experience in a structured way. On the basis of the available knowledge and exper

    Jan 1, 2006

  • SME
    Kárahnjúkar Hydroelectric Project, Iceland Extreme Underground Construction

    By Bernhard Leist, William D. Leech, Johann Kröyer, Holger Evers

    Landsvirkjun—the national electric power company of Iceland—is building the Kárahnjúkar Hydroelectric Project in eastern Iceland. Two glacial river systems will be dammed and channeled through a serie

    Jan 1, 2007

  • CIM
    The Ore Deposits of Nickel Plate Mountain, Hedley, B.C.

    By Paul Billingsley

    NICKEL Plate mountain coincides closely with that portion of the Hedley mining district which is of economic interest. From it has come almost the entire past production, and the active mines of the p

    Jan 1, 1941

  • SAIMM
    Handling Of Fluctuating And Low-Strength SO2 Gases An Overview

    By Klaus Hasselwander

    Fluctuating SO2 gas streams represent a difficult task for designers of SO2 removal systems (with respect to designing the plant), but in spite of the designers great efforts to solve the problems, th

    Jan 1, 2009

  • SME
    Missouri-Rolla’s Online Program Gains Popularity

    By Tad S. Golosinski, R. Larry Grayson

    Online education is not new. During the last decade, it has reached the stage where many universities offer a variety of courses, degrees and programs without any associated residency requirements.

    Jan 1, 2002

  • CIM
    Automating Delay Reporting to Deliver Effective Maintenance

    By Shaun Booth

    Automating Delay Reporting to Deliver Effective Maintenance Corporate Background: Technology Company: Matrikon Inc. Global software and service provider of Information Technology and Control Solut

    May 1, 2003

  • AUSIMM
    Building and Calibration of a Geotechnical Model for Sublevel Open Stope Design at Olympic Dam

    By I Thin, L Morizzi, C Seymour, G Mungur

    Olympic Dam has been investigating mine design options for the South Mine Area (SMA), which will continue using the existing sublevel open stoping (SLOS) method. The SMA is an undeveloped mining area,

    May 9, 2016

  • SME
    Mining, EPA, and toxic waste : Will your mining company be liable?

    By Peter Haller

    Introduction The impact of the Comprehensive Environmental Response, Compensation, and Liability Act, or Superfund, as well as the Resource Conservation and Recovery Act (RCRA) and their state counte

    Jan 2, 1987

  • NIOSH
    IC 6578 Good rock-dusting and ventilation in two Alabama Coal Mines

    By F. E. Cash

    "Explosions in bituminous coal mines are preventable. The combination of adequate ventilation, thorough rock-dusting, and water on the cutter bars of mining machines and of empty and loaded cars will

    Mar 1, 1932

  • ISEE
    The Computerized Design Program for Tunnel Blasting

    By Jeon Jeon, Yong-Kun Choi, Chung-In Lee, Yong-Hun Jong, Hag-Soo Kim

    In this study, a computer program to design tunnel blasting pattern has been developed. The program consists of two parts; one is for tunnel blasting pattern design and the other is for blasting model

    Jan 1, 2005

  • CIM
    Sidbec-Normines Inc. et la Production de Boulettes à basse Teneur en Silice et de Boulettes a Hauts Fourneaux à Port-Cartier

    By Réjean Lévesque

    SIDBEC-NORMINES a été incorporée en 1976. Depuis la fin de 1977, ses activités comprennent outre la concentration au lac Jeannine, près de Gagnon, du minerai de fer extrait du gisement du lac Fire, I&

    Jan 1, 1979

  • AUSIMM
    Deformation of Single Crystals of Lead by Creep

    By Phil N

    A large number of experiments have been carried out by many workers on the recrystallization of deformed and subsequently annealed metals and alloys. Although observations on single crystals are of gr

    Jan 1, 1940

  • DFI
    Base Grouted Piles - Mr. P. M Cashman, Independent Consultant

    By W. J. Kingwell

    My comments and questions are addressed to Mr. Troughton. It seems to me that the tests were very well tailored to determine long term effects on performance of bearing piles as groundwater pressures

    Jan 1, 1991

  • SAIMM
    Steel-Slag As Filler Material In Concrete

    By H. Moosberg-Bustnes

    In cement-based products, such as concrete and mortars, a balance between the particle sizes of the components must be kept in order to obtain the required material properties, such as workability and

    Jan 1, 2004

  • DFI
    Stresses And Settlement In Soil Due To Axially Loaded Piles And Pile Group - Synopsis :

    By Virendra Singh

    The load settlement behaviour of single pile or pile group may be obtained using computer based methods such as the finite or boundary element techniques. An alternative method of obtaining the vertic

    Jan 1, 1996

  • NIOSH
    Coal Seam Degasification

    By Pramod C. Thakur

    In This Chapter [Origins of coalbed methane Reservoir properties of coal seams Thresholds for coal seam degasification Methane emissions in mines Methane drainage techniques How to t

    Jan 6, 2006

  • ISEE
    Portable, Multi-Channel and Continuous Velocity of Detonation Recorders (122b6f71-61a6-4f23-afba-c5878df1df8c)

    By Jackson R. Pressley, Bruce Vandenberg

    The knowledge of how and when your explosives go off can help you make intelligent decisions regarding future application of explosives thus removing some of the black magic associated with blasting.

    Jan 1, 1992

  • DFI
    Different Drilling Techniques in Challenging Geology at Seminole Hard Rock Hotel and Casino

    By Michael Arnold, Jonathan Delgado

    In 2017, Bauer Foundation Corp. (BFC) was awarded the contract to install the deep foundations for the new 17-story Hotel Tower and the Low Rise Casino Expansion at the Seminole Hard Rock Hotel and Ca

    Jan 1, 2018

  • NIOSH
    RI 9643 - Full-Scale Testing Of The Float Dust Deposition Meter

    By Robert A. Cortese, Henry E. Perlee

    Coal dust and float coal dust, produced during normal mining operations, in underground coal mines, are carried from the point of origin downstream by the ventilating air, where it deposits on the sur