Search Documents

  • TMS
    Preparation of a Carbon Free Precast Block for Ladle Lining

    By Zhigang Liang

    A carbon free precast block was prepared by using high-alumina fused corundum as aggregate and fused magnesia, and ultra-fine Al2O3 and ultra-fine SiO2 powders as matrix materials. A small linear expa

    Jan 1, 2009

  • TMS
    EMF Study Of Nb-Al Intermetallics

    By Pratheesh George

    Solid state galvanic cell with CaF2 as the electrolyte was employed for determining the thermodynamic properties of Nb-Al binary alloys in the temperature range of 973-1073 K. The activities and activ

    Jan 1, 2006

  • NIOSH
    IC 7185 Inspection And Testing Of Mine-Type Electrical Equipment For Permissibility ? Introduction

    By L. C. IlsLey

    The theory and practice followed by the Bureau of ones in the investigation of electrical equipment4/ made for service in massy mines are of particular interest not only to manufacturers but also to t

    Jan 1, 1941

  • ISEE
    Preparing a Written Blast Plan (1b8a88a8-1e7f-429f-bd71-b32f7b3dbf86)

    By David Ziegler

    A formal blast plan is sometimes required for projects involving rock excavation. A written blast plan submitted with a bid proposal can also be an important sales tool. A blast plan will cover the ba

    Jan 1, 2003

  • CIM
    Prescriptive Blasting

    By D. Mark Richards

    Highland Valley Copper (HVC) is a large open pit copper mine in the southern interior of British Columbia. Machine guidance technology using GPS has been utilized at the mine since 1996 for blast hole

    May 1, 2007

  • SME
    Improved Apatite Recovery From Pyroxenite Ore Using Dry Milling

    By P. Bester, G. J. van der Linde

    Foskor operates a mine in the Northern Province of the Republic of South Africa exploiting the igneous complex at Phalaborwa. It produces about 3 million tons of phosphate concentrate per year by mean

    Jan 1, 1999

  • AIME
  • SME
    Benefits Of The Pilot Tunnel On The Cumberland Gap Highway Tunnel Project

    By W. Randall, Robert M. Leary

    Twin 1250 m (4100 ft.) long highway tunnels through Cumberland Mountain near Middlesboro, Kentucky are planned to be completed in the early 1990's. The tunnels will be excavated in sandstones, li

    Jan 1, 1987

  • NIOSH
    IC 6295 Mining Laws of Costa Rica

    By A. D. Garman

    The mining ordinance of Costa Rica dates from 1830. In spite of the numerous attempts to enact a new ordinance , it has been so much amended and reamended during the hundred years of its existence eit

    Jul 1, 1930

  • AUSIMM
    Flotation of Hematite Using Hydroxamates as Collectors

    Flotation testing has been done at laboratory scale on hematite mineral and ore samples using stage additions of various hydroxamates. Chemisorption of hydroxamate species onto the hematite surface wa

    Jan 1, 1999

  • SME
    Effect Of Bit Wear On Productivity Of Continuous Miners PRIPRINT 93-238

    By A. W. Khair

    This paper presents an analysis of the dynamics of bit wear on the productivity of the continuous miners. Two field surveys have been carried out. The first survey was to assess the impact of bit wear

    Jan 1, 1993

  • SME
    Intrenchment Creek Combined Sewer Overflow Conveyance System

    By Kenneth F. Wyman

    The following report details the successful construction of Contract 2A of the Three Rivers Water Quality Management Program, Intrenchment Creek Combined Sewer Overflow Conveyance System, in DeKalb Co

    Jan 1, 1985

  • CIM
    The Importance of Shaft Heating in Coal Mines

    By M. Uszko

    The climatic area in which Poland is located requires heating the ventilation air at intake shafts during the winter season. Air heating of the intake shaft should ensure safe operation of hoisting de

    Aug 1, 2013

  • SME
    Technical Note - SO2 abatement in a 440-kW pilot-scale combustor —limestone injection tests

    By G. H. Lewis, C. L. Krcil, N. S. Harding, D. E. Havekotte

    Introduction Limestone injection work was completed in a 440-kW (1.5-million Btu per hour) pilot-scale combustor in preparation for a 50,000-kg/h (110,000-lb per hour) industrial steam boiler limes

    Jan 12, 1986

  • SME
    Regulatory Aspects Of Subsidence Under Surface Mining Control And Reclamation Act

    By Dermot M. Winters, Brent T. Wahlquist, C. Y. Chen

    The enactment of the Surface Mining Control and Reclamation Act (SMCRA) in August 1977 addressed subsidence resulting from underground mines, in addition to creating the requirements for reclamation o

    Jan 1, 1986

  • AUSIMM
    Specification and Selection of Hand-held Gas Monitors (Detectors) for Underground Mines

    By D J. Brake

    There are many sources of gas in underground mines including development and production blasting, strata gases, spontaneous combustion, diesel equipment, chemicals used for a wide range of functions,

    Aug 31, 2015

  • ISEE
    Chemical and Physical Factors that Influence No. Production During Blasting - Exploratory Study

    By James Rowland, Isaac Zlochower, Richard Mainiero, Michael Sapko

    The National Institute for Occupational Safety and Health (NIOSH) carried out exploratory laboratoryscale studies to identify factors that may contribute to nitrogen oxides (NOx) production associated

    Jan 1, 2002

  • SAIMM
    Spotlight ? Minerals And Mining Policy Workshops ? March 1996

    The Steering Committee for Minerals and Mining Policy convened two workshops during March 1996 to address the following topics: Business Environment- National and Provincial Powers, Administration an

    Jan 1, 1996

  • CIM
    Studies of PEM fuel cells and hydrogen storage materials

    We report the studies of Proton-Exchange Membrane Fuel Cells (PEM FC) and hydrogen storage materials at McMaster University for the last 14 years. From the initial investigation of ionic conduction me

    Jan 1, 2005

  • ISEE
    Blasting Vibrations Control: The Shortcomings of Traditional Methods

    By Thierry Bernard, Pierre M. Vuillaume, Michel Kiszlo

    "In the context of its studies for the trench ministry of the environment and for the French national coal board, INERIS (the French institute for the industrial environment and hazards, formerly CERC

    Jan 1, 1996