Search Documents

  • CIM
    Bio-treatment of Refractory Gold Ore in Obuasi Mines

    By J. K. Afidenyo, J. Osei-Owusu

    "The Obuasi Mine of AngloGold Ashanti Limited has been operating the world’s largest Biooxidation Plant at its Sulfide Treatment Plant (STP) in Ghana, using the Gencor Biox® technology since February

    Jan 1, 2008

  • NIOSH
    RI 9448 - Seismicity and Stress Changes Subsequent to Destress Blasting at the Galena Mine and Implications for Stress Control Strategies (9844d375-659f-4a7e-a5c0-a9fa2020e7d7)

    By F. M. Boler

    The U.S. Bureau of Mines conducts research at the Galena Mine, Wallace, ID, with the aim of mitigating the effects of rock bursting. Destress blasting is commonly used as a stress control technique at

    Jan 1, 2010

  • AUSIMM
    Determination of the Crystalline Percentage in a Natural Silica Material with Respect to the Emission of Respirable Silica Dust

    By A Asadov, D Nair

    This paper discusses the determination of the percentage of crystalline material in a natural silica deposit which would be considered harmful to health (<10 ¦m). A sample of the natural silica mat

    Jan 1, 2003

  • NIOSH
    Review Of The Mineral Industries (Metals And Nonmetals Except Fuels) (8111a13c-5fba-46f4-ad27-90a538b86049)

    By Kung-Lee Wang

    SUSTAINED growth characterized the U.S. economy in 1964. Many new peaks were achieved in production, sales, employment, employee earnings, and business profits. At the end of 1964, the economy had exp

    Jan 1, 1965

  • ABM
    Estudo Sobre O Uso De Um Motor Stirling Como Sistema De Cogeração De Energia Utilizando O Resíduo Térmico Da Escória De Aciaria Elétrica

    By Eduardo Hollanders de Moura, Carlo Tripoli, Paulo Santos Assis

    Este artigo mostra como a utilização de um motor Stirling pode tornar o processo siderúrgico mais sustentável e rentável ao gerar energia elétrica com o resíduo térmico da escória de aciaria elétrica.

    Aug 1, 2019

  • TMS
    Removal of Hg(II) from Aqueous Solutions Using Spent Grain

    By Liyuan Chai

    In this study, spent grain was used as an adsorbent for the removal of Hg(II) from aqueous solutions, the process parameters such as contact time, solution pH, adsorbent dose, and initial Hg(II) conce

    Jan 1, 2009

  • SME
    Cut-and-Fill Stoping at Star Mine

    By Gordon Miner

    GENERAL DESCRIPTION At the Star mine, Hecla Mining Co., located in Burke, Shoshone County, ID, the mining method is horizontal slicing (timbered or untimbered) cut-and-fill using hydraulic sand backf

    Jan 1, 1982

  • NIOSH
    Practical Techniques To Improve The Air Quality In Underground Stone Mines

    By R. H. Grau, S. B. Robertson, F. Garcia, A. C. Smith, T. P. Mucho

    Researchers working for the National Institute for Occupational Safety and Health (NIOSH) at the Pittsburgh Research Laboratory are developing ways to protect the health of miners. Part of that effort

  • AUSIMM
    Australia’s Potential for Nickel Sulfide Ore Systems – A New Continental-scale Time-space Framework for Exploration

    By R G. Skirrow, M Cooper, J Claoué-Long, K Czarnota, H Dulfer, J Thorne, D C. Champion

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Tholeiitic intrusion-hosted nickel (PGE-Cu) sulfide deposits are under-represented in Austr

    Mar 18, 2015

  • AUSIMM
    Remediation Strategies for Acid Mine Drainage at Sullivan Mine, West Coast, New Zealand

    By K Gordon, A Black

    Two remediation strategies have been considered to reduce the levels of acidity and dissolved metals in acid mine drainage discharging from Sullivan Mine, West Coast, New Zealand. The oxidising strate

    Jan 1, 2003

  • CIM
    Kairos Mining: A Comprehensive Approach to Sustained Long-Term Benefits in Copper Processing Plant Automation

    By Luis Castelli, Aldo Bonomelli, Giselle Schifferli, Claudio Zamora

    "This paper introduces the operational concept and the description of a multi-site Remote Support Center for knowledge management and long-term process performance improvement.This centralized Support

    Jan 1, 2010

  • SAIMM
    Cansolv® SO2 Scrubbing System: Review Of Commercial Applications For Smelter SO2 Emissions Control

    By Valérie Léveillé

    As new legislation drives to lower SO2 emissions from metallurgical plants, plant managers face the challenge of keeping their costs under control. The Cansolv® SO2 Scrubbing System has been broadly a

    Jan 1, 2009

  • NIOSH
    Reinforcing Coal Mine Roof with Polyurethane Injection: 4 Case Studies

    By Gregory Molinda

    NIOSH has recently completed a study of the interaction between polyurethane (PUR) and coal mine roof in order to determine the mechanism of reinforcement, in both highly fractured rock and unfracture

    Jan 1, 2008

  • SAIMM
    Micropore Carbon Furnace Lining

    By Stefan Basista, Janusz Tomala

    Modern constructions of electric ferroalloy furnaces are still based on applying in the lower "liquid" areas the standard carbon materials. What can be illustrated by the experience from several years

    Jan 1, 2007

  • SME
    Butte: A World Class Ore Deposit

    By Steve J. Czehura

    The Butte quartz monzonite is the host rock for early porphyry copper style mineralization and subsequent mesothermal-epithermal, enargite-gold style veining that transects the district. The east-west

    Jan 1, 2006

  • NIOSH
    OFR-38(2)-74 Survey Of Electromagnetic And Seismic Noise Related To Mine Rescue Communications - Volume II - Seismic Detection And Location Of Isolated Miners ? Introduction

    By Robert L. Lagace

    This final report documents the work dune by Arthur D. Little, Inc. (ADL) on behalf of the U.S. Bureau of Mines, Pittsburgh Mining and Safety Research Center (PMSRC), on Contract H0122026 (which began

    Jan 1, 1974

  • DFI
    Comparison of Static Lateral Behavior of Vertical and Battered Pile Groups of the I-10 Twin Span Bridge Using Finite Element Simulation

    By Ahmad F. Souri, Murad Abu-Farsakh

    "In this study, the static lateral resistance of vertical and battered pile groups was analyzed using 3D finite element analysis. The battered pile group finite element model was verified using the re

    Jan 1, 2017

  • SME
    Up-to-date Excavation, Support, and Lining Solutions Meet Timing Requirements for the First Two Tunnels of the 2006 Winter Olympic Games

    By Georgios Kalamaras, Chiaia Dinu, Platania Paolo, Alessio Carlo, Giampiero Cirvegna, Claudio Santucci

    The Project alignment initiates north of Pinerolo, along the State Road 23[S.S. 23] that is one of the principal arteries to the northwestern Alps where a number of Olympic events for the 2006 Winter

    Jan 1, 2005

  • NIOSH
    OFR-02-90 A Raw-Coal Concentration Sensor For Hydrotransport

    By Victor V. Verbinski

    This report presents the development of a raw coal concentration sensor for hydro-transport of coal and refuse (rock) from underground mines, and the results of an international test series carried ou

    Jan 1, 1988

  • SME-ICGCM
    Development of Low Profile Remote Roof Bolting Module

    By Bill Kyslinger

    In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Boart Longyear Poland and KGHM, J. H. Fletcher & Company was ta

    Jan 1, 2006