Search Documents

  • IMPC
    Design, Materials Combinations and Recycling

    By Remmerswaal, U. Boin, M. B. G. Castro

    "To design sustainable products that can be recycled with high resource efficiency, low environmental impact and economic feasibility, the choice of materials and materials combinations, made in the d

    Jan 1, 2003

  • SME
    Size Reduction/Mineral Liberation Simulation For A Magnetic Taconite Concentrator

    By R. L. Wiegel

    Several mineral process modeling and simulation packages are currently available for use in evaluating the performance of alternative process flow schemes. A critical link that has been missing from t

    Jan 1, 2003

  • SAIMM
    Evolutionary algorithms for the optimization of production planning in underground mines

    By Q. X. Yun

    This paper provides a new approach to optimize the production planning in underground mines by means of evolutionary algorithms. Firstly, genetic algorithm is used to reach the global optimization in

    Jan 1, 2003

  • SME
    Flambeau And Ridgeway Mines – Lessons Learned

    By F. D. Fox

    The Flambeau and Ridgeway Mines, both owned and operated by wholly owned subsidiaries of Kennecott Minerals Company, were located very close to populated areas having initial concerns about health, sa

    Jan 1, 2003

  • AUSIMM
    Revegetation of Mine Rockdumps Using Indigenous Mosses and Other Pioneer Plants

    By P Alspach, R Buxton, C Morgan, C Ross

    Mining companies worldwide have an increasing interest in restoring indigenous ecosystems following mining. Low levels of plant nutrients and organic matter, pH extremes, heavy metals, physically chal

    Jan 1, 2003

  • SAIMM
    Size Dependent Gold Deportment In The Products Of Copper Flotation And Methods To Increase Gold Recovery

    Plant survey data has shown that gold recovery through a specific copper concentrator was significantly lower than copper recovery. Size-by-size analysis revealed that this was due to poor recovery of

    Jan 1, 2003

  • SME
    Berwind Decision: Where Are We Now With Liability For Contract Miners

    By M. M. Rajkovich

    Just prior to the close of the century, the Mine Safety and Health Review Commission issued its long-awaited decision in Berwind Natural Resources et al. vs. Secretary of Labor[1] to usher in the new

    Jan 1, 2003

  • SAIMM
    Winning Paper: Optimization Of A Raiseline At Mponeng Mine

    By N. Ragoonanthun

    Paper written on project work carried out in partial fulfilment of B.Sc. (Mining Engineering) degree This report investigates the optimization of a raiseline in order to open up the ore reserve qui

    Jan 1, 2003

  • TMS
    Distribution Of Minor Elements In Sulfide Smelting (Keynote)

    By Kimio Itagaki

    The distribution ratios of Ag, Pb, As, Sb and Bi for the Cu2S-FeS or Ni3S2-FeS matte / FeOx SiO2, FeOx-SiO2-CaO or FeOx-CaO slag equilibration in a MgO crucible were determined experimentally at 1523~

    Jan 1, 2003

  • TMS
    Picking -An "Old" Process for Separation of Non-Ferrous Metals?

    By Stefan Mutl

    By the term sorting one understands the separation of a material mixture into two or several products according to different material characteristics in the preparation technology. The oldest sorting

    Jan 1, 2003

  • TMS
    On-Line Analyzers In Hydrometallurgical Applications

    By Richard Krentz

    Two separate on-line analyzers are operated at the Corefco metals refinery. The first application is an on-line refractometer which measures the ammonium sulphate concentration in the primary feed sl

    Jan 1, 2003

  • SME
    So You Have A T/E Species On Your Permit: How To Survive

    By R. J. Wahrer

    In 1996, the Office of Surface Mining (OSM) and the U.S. Fish and Wildlife Service (FWS) completed an Endangered Species Act (ESA) programmatic Section 7 consultation. From the resultant Biological O

    Jan 1, 2003

  • AUSIMM
    Impact of Blast Fragmentation on Hydraulic Excavator Dig Time

    By D Thornton, R Hodson, D Sprott

    Blast fragmentation size distribution and thus blast design have been found to have a direct impact on the load and haul cycle through excavator dig time and bucket payload. Previous studies have demo

    Jan 1, 2003

  • SAIMM
    The link between the design process in rock engineering and the code of practice to combat rock fall and rockburst accidents

    The paper deals with the importance of design, and of codes of practice, in ensuring safe working conditions in mines. The design principles involved in the design process are dealt with, and the imp

    Jan 1, 2003

  • SAIMM
    Integrated comminution and flotation neurocontrol using evolutionary reinforcement learning

    By A. v. E. Conradie, I. Nieuwoudt

    Comminution and flotation circuits are frequently perturbed by disturbances, such as feed particle size variations, ore hardness and varying mineral liberation, which can have a significant impact on

    Jan 1, 2003

  • IMPC
    Thermodynamics of Platinum in Melter Furnace Mattes

    By Steven Wright, Sharif Jahanshahi, Shouyi Sun

    "While there is a large industry based on recovering platinum group metals (PGM) from complex sulphide ores containing Cu and Ni, there is little information on the thermodynamics of the matte phase f

    Jan 1, 2003

  • SAIMM
    Shear band propagation in soft rocks: numerical simulation of experimental results

    By M. Castelli, C. Scavia, S. Marello, A. Allodi

    ABSTRACT – This paper investigates the possibility of interpreting the shear band evolution in hard soils and soft rocks as the result of shear propagation from pre-existing natural defects. Thesis do

    Jan 1, 2003

  • SAIMM
    Assessing risk in grade-tonnage curves in a complex copper deposit, northern Brazil, based on an efficient joint

    By M. B. Fonseca

    Risk quantification in grade-tonnage curves is critical for capital investment in mining projects and can be obtained through geostatistical simulations of orebodies. A practical difficulty may arise

    Jan 1, 2003

  • SAIMM
    Pillar Failure in Deep Coal Seams: Numerical Simulation

    By S. Badr, R. Mendoza, M. U. Ozbay, M. D. G. Salamon

    ABSTRACT: The use of coal pillars at depth is fraught with problems due roof control difficulties and the possible occurrence of coal or pillar bumps. In the USA the largest and most important applic

    Jan 1, 2003

  • ISEE
    The Evaluation of Electronic Detonators at Martha Mine, New Zealand

    By Blair Jackson, Tjaart Louw

    Martha Mine, owned by Newmont Mining, Australia appointed Macmahon Contractors (NZ) Ltd as the mining contractor to drill, blast, and crush and convey ore for processing, followed by construction of a

    Jan 1, 2003