A Study On Stress Distribution And Reasonable Size Of Coal Pillar In A Coal FaceBy H. C. Li
Mechanical models are established in accordance with the degree of mining on both sides of the coal pillar, and formulae were derived which calculated the superposition stress distribution and the wid
Jan 1, 1992
-
Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence PredictionBy Witold M. Pytel
A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi
Jan 1, 1992
-
Surface Fracture Development From Mine Subsidence In Eastern KentuckyBy Clyde DeRossett
Surface fractures, sometimes of significant size, are observed in eastern Kentucky over high extraction areas. Field observations were correlated with mine maps and a regional subsidence prediction co
Jan 1, 1993
-
Coal Pillar Life Prediction in the Vaal Basin, South AfricaBy J. Nielen van der Merwe
This investigation was done to develop a method to predict the lie of coal pillars. It has long since been known that coal pillars deteriorate over time, but there was no method to quantify the deteri
Jan 1, 1998
-
Pillar Optimization For Initial Design And Retreat RecoveryBy Charles Steed
The design of pillars in room and pillar operations is always a compromise between factor of safety and ore recovery. In actively mined and accessed areas the stability of pillars must be sufficient t
Jan 1, 2003
-
An Analysis Of Longwall Shield Cycle Effectiveness By Polycorder MonitoringBy Greg Hendon
Various methods have been used to evaluate the effectiveness of shields in place. The most common method used is static recording of leg pressures by visually examining pressure gauges. In an effort t
Jan 1, 1990
-
Comparative Studies In The Mechanics Of Grouted Roof BoltsBy Stephen P. Signer
To improve the understanding of the support interaction mechanics between grouted bolts and coal mine roofs and to help lay the foundations for improved design and evaluation techniques, the 0.8. Bure
Jan 1, 1988
-
Application Of Short-Term Time-Dependent Plate Loading Tests For Estimation Of In-Situ Elastic And Viscous Parameters Of Weak Floor StrataBy Gang Chen
This paper explores the possibility of using short-term time-dependent plate loading tests to estimate the elastic and viscoelastic parameters of the weak floor strata typically associated with coal s
Jan 1, 1990
-
Application of the Coal Mine Roof Rating, Derived from Drill Core, in the Roof Support Design of a Coal Belt Conveyor TunnelBy John Rusnak
The Coal Mine Roof Rating (CMRR) is a practical rock mass classification system for use in design of mine openings. Data can be obtained for this purpose from exploration drill cores if simple geotech
Jan 1, 1998
-
Horizontal Stresses and Their Impact on Roof Stability at the Nelms No. 2 MineBy J. B. Lizak
This paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.
Jan 1, 1984
-
Intrinsic Response Of Borehole Pressure Cells Laboratory Calibration And Nonlinear Fem SimulationBy D. Su
This paper presents the details and results of a preliminary investigation into the response of borehole pressure cells (BPCs) in soft coal. Two parallel approaches, laboratory calibration and nonline
Jan 1, 1990
-
Aspects of Chain Pillar Design in Relation to Longwall MiningBy B Whittaker
The paper examines the role of chain pillars in longwall mining layouts as used in several countries. The application of chain pillars in relation to their expected design role is discussed. An import
Jan 1, 1987
-
An Application Of Fem Back Analysis Method To Mine RoadwayKnowledge of initial ground pressures or in-situ stresses and mechanical properties and geological conditions is of great importance in drivage and maintenance of a mine roadway. Field measurements
Jan 1, 1990
-
Detection of Abandoned Mines and Air Passages/Burning Centers of Mine Fires by Combined Electromagnetic MethodBy Shu Yan
The high resolution resistivity method (HRRM) is developed specifically for detecting underground cavities and tunnels. HRRM has a special feature in that it can recognize and cancel static shift, whi
Jan 1, 2005
-
The Influence of the First Layer Thickness of Immediate Roof on its StabilityBy Lixun Kang
Bedded structure is the characteristics of coal measures strata. Bedding planes, coal streaks and soft rock bands existing in roof strata destroyed its continuity in the direction perpendicular to the
Jan 1, 2005
-
Outcomes of the Landmark Longwall Automation Project with Reference to Ground Control IssuesBy Michael Kelly
Inertial navigation technology has, for the first time, allowed the position of a longwall shearer to be mapped in three dimensions. Following the success of the technology in highwall mining and succ
Jan 1, 2005
-
Is Mining Coal at a 900M Below Surface at the Xuandong Coal Mine in China Challenging or Just Interesting Rock Mechanics?By Wouter Hartman
Xuandong Coal Mine is mining coal in one of the most challenging underground environments in the world. This work has found that it is not only challenging but it also has the composition for some int
Jan 1, 2012
-
Development of Low Profile Remote Roof Bolting ModuleBy Bill Kyslinger
In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Boart Longyear Poland and KGHM, J. H. Fletcher & Company was ta
Jan 1, 2006
-
The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)By Stephen Tadolini
A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar
Jan 1, 2007
-
Analytical Investigation of Shaft Damages at West Elk MineBy Tim Ross
Several shear failures were observed in Shaft #1 at the Mountain Coal Company, LLC, West Elk Mine, after mining longwall Panel 23, 1,100 ft to the east of Shaft #1. It was speculated that this shear