Study On The Recycling Of Valuable Metals In Spent Al2O3-Based CatalystBased on X-ray phase analysis and exploratory experiments, a new technology was developed to recycle multiple valuable elements in spent Al2O3-based catalyst. The experimental results showed that afte
Jan 1, 2007
-
Field-Scale Investigation Of Pulverized Coal Mill Power ConsumptionTwenty field-scale tests were conducted in a 28 MW pulverized coal power plant in Healy, Alaska, to examine mill power consumption in relation to coal grind size. The intent in this field-scale study
Jan 1, 2008
-
The QIT Madagascar minerals deposits - geology, mining & mineral processingBy M. Mead, J. Dumouchel, W. Yule, J. Giroux
The QMM mineral sands of South East Madagascar contain approximately 1,900 million tonnes of mineable sand with a total heavy mineral (THM) content of roughly 4.5wt%. The QMM deposits are the world’s
Jan 1, 2005
-
Tunneling Challenges in the Nation?s CapitalBy Moussa Wone
The Washington, DC Water and Sewer Authority (WASA) has implemented facility planning for the Anacostia River Projects portion of a program to bring its Combined Sewer System (CSO) into compliance wit
Jan 1, 2008
-
Flotation Froth Image Segmentation Based on Highlight Correction and Parameter Adaptation Mining, Metallurgy and ExplorationBy Wen Tao Liu, Tong Tian, Fu Sheng Niu, Xiu Man Liang
In order to address the difficulty of accurate segmentation of froth images of different sizes, a method of froth image segmentation based on highlight correction and parameter adaptation is proposed.
-
Dewatering for the Lenox Avenue Subway Reconstruction ProjectBy Paul C. Schmall, Thomas Tuozzolo, Arthur B. Corwin
The Lenox Avenue Reconstruction Project involved the excavation and replacement of 750 m (2,500 ft) of deteriorated subway invert concrete, 5 to 7 m (15 to20 ft) below water table in very permeable gr
Jan 1, 2001
-
Collapse and Remining of Tunnel TO8 at THSRC Contract C230By William Stewart, John Tinkler, Gary B. Hemphill
Of the 345 km long Taiwan High Speed Rail Project, connecting the cities of Taipeiand Kaohsiung, the 23 km alignment on Contract C230 required the construction of5755 m of shallow mined tunnels rangin
Jan 1, 2005
-
The Carbon-In-Pulp Plant Of The Masbate Gold Operations PhilippinesBy F. V. Antonio, R. S. Pizarro
Masbate Gold Mines, dormant since WWI I, are now back in operation. The ore treatment plant incorporates carbon-in-pulp processing, utilized because of the ready availability of coconut shell charcoal
Jan 1, 1981
-
Tracer Gas Techniques For Mapping Air And Methane Migration Through A Longwall Waste In An Underground Coal Mine Using Tube Bundle SystemsBy G. W. Bonnell, D. A. Young, D. G. Genter
Through 1996 and 1997, CANMET and the Cape Breton Development Corporation (CBDC) conducted a project to study the Phalen Mine’s 7 East longwall ventilation network to help determine methane emission p
Jan 1, 2001
-
Power Generation at Gold Fields -Chimney Creek The Profitable Alternative (c346a3f3-d1f2-4072-a265-76751b3dfe9f)By Michael F. Gleason
In 1986, Gold Fields began negotiations with a large Nevada electrical power utility to supply power for its Chimney Creek Mine In northern Nevada. After the long negotiations reached an impass over v
Jan 1, 1990
-
Ground Treatment for Tunnel Construction of Line 10 Extension to the Madrid Metro Under Difficult Ground Water ConditionsBy Manuel Arnáiz, Pedro R. Sola, Rogelio Baudot, Manuel Herrera, Carlos S. Oteo
The aim of this paper is to describe and analyze the ground treatment performed between January and May 2002 in order to increase safety during excavation and reduce instability problems along 180 m o
Jan 1, 2003
-
Improving Energy Efficiency in Copper Heap Leaching with the use of BindersBy K. A. Lewandowski
Leach heaps are plagued with problems due to fine material migrating downwards, clogging the spaces between the coarser ore particles, resulting in decreased metal recovery rates. The use of a binder
Jan 1, 2008
-
A New Model For Blast Fragmentation Prediction Based On Multivariate Analysis - IntroductionBy T. Hudaverdi
Several studies have been conducted on blastability and prediction of fragmentation. The term blastability is used to refer the susceptibility of the rock to blasting and is closely related to fragmen
Jan 1, 2011
-
Concentrations and fractionation of REEs in marine ferromanganese crust deposits controlled by water depthBy Andrea Koschinsky, Peter E. Halbach, Margret Halbach, Andreas Jahn
"Ferromanganese crusts contain hydrous Mn and Fe oxides as main metal compounds together with some economically interesting minor elements such as Co, Ni, Ti and Cu and trace metals such as Mo, W, Nb,
Sep 1, 2014
-
Glenbrook Nickel – Can New Caledonian Ore Save the Only US Nickel Producer?By Kerry Spickelmier
The only nickel smelter and the only active nickel mine in the United States is Glenbrook Nickel Co., a joint venture (50% each) of Cominco Resources International Ltd. and Cominco Ltd. In 1989, with
Jan 1, 1993
-
The Technological Evolution Of Longwall Mining – Preprint 97-116By M. Karmis, C. Haycocks
The evolution of longwall mining is briefly traced from its inception in England in the 1620's. In the beginning this method recovered 90% of coal with roof closure controlled by packs and walls.
Feb 24, 1997
-
The Development Of An Energy Balance Model To Predict The Economic Impact Of Installing A Tailings Wash Thickener At The Fort Knox Mine, Fairbanks, AlaskaBy J. Hollow, D. Walsh
The Fort Knox Mine is located in Alaska’s interior, where the average ambient air temperatures range from -24oC in January to 16oC in July. The mill processes a free milling gold ore utilizing both a
Jan 1, 2007
-
Actualizing Sustainable Mining: “Whole Mine, Whole Community, Whole Planet” Through ‘Industrial Ecology’ And Community-Based StrategiesBy Ivan Weber
Asking the question, “What do the world’s leading corporations and cutting-edge practitioners of sustainability put forth to guide a given mine site for planning and action toward ‘sustainability’?”,
Jan 1, 2005
-
Second Narrows Water Supply Tunnel—Final Design, Procurement and Construction - RETC2021By Gregg W. Davidson, J. Andrew McGlenn, Frank Huber
The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet the long-term needs of a g
Jun 13, 2021
-
Dulles Corridor Metrorail Extension Project - Tunneling Options for Tysons CornerBy John Rudolf
Metropolitan Washington Airport Authority is currently undertaking the first Phase of Metro?s Extension to Northern Virginia. A wide range of tunnel options was considered for the Tysons Corner segmen