Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Producing a GIS Based Multi Attribute Decision Making for Social and Environmental Sustainability Assessment in a Copper Mine in IranBy B. Farshadi, B. Asi, M. J. Habibian
"Dare-Zereshk deposit is one of the deposits supplies ore for Taft copper Complex in Iran Yazd province. This deposit is situated underneath a village the same name. Prior to mining activities, the vi
Jan 1, 2011
-
Two Tunnels in Totally Different Geological Formations Driven by the Same 7M Double-Shield TBM with an Extremely Thin-Walled Monoshell Honeycomb Segmental Lining SystemBy Wolfgang Guetter, Wolfgang Weber
The upgrading project for two hydropower plants in Slovenia, Europe, requires two new pressure tunnels: Plave II (5.9 km Flysch) and Doblar II (3.6 km Limestone). It is the worldwide largest applicati
Jan 1, 2001
-
Horizontal Geotechnical Investigations for TunnelingBy Nick Salisbury, Alan Howard, Scott Tunison
INTRODUCTION Geotechnical investigations for tunneling projects typically use vertical test borings and, to a lesser extent, angled borings. Horizontal drilling applications were often limited to
Jan 1, 2005
-
Social, Environmental And Governmental Issues Impacting The Uranium IndustryBy Jon J. Indall
I. INTRODUCTION The challenge of moving the use of nuclear energy from military to civilian use was first issued by President Dwight Eisenhower in his December 8, 1953 “Atoms for Peace” speech deliv
Jan 1, 2007
-
Proactive Interburden Fracturing Using Underground Inseam Drilling with Validation MonitoringA series of gas inrush events occurred during development at Grosvenor mine resulting in exposure to elevated levels of methane at the production face. A total of 22 gas inrush events occurred releasi
Jan 7, 2020
-
Incorporating Indigenous Technologies Into Enhanced Stormwater, Erosion And Sediment Control SystemsBy R. C. Warner, L. Mills, S. D. Botts, M. Marticorena
The Antamina Mine is located in the mountainous region of the Ancash Department of Peru at an elevation of approximately 4200m.The 120 km main access road crosses the headwaters of numerous high-value
Jan 1, 2004
-
Identification And Nature Of Risks In Construction Projects A Contractor's PerspectiveBy J. J. Casey
This paper is one of a series of presentations organized by the Conference of American Society of Civil Engineers with the goal of making significant progress toward an equitable and effective allocat
Jan 1, 1979
-
Homestake’s McLaughlin mine : One of the largest US gold mines comes onstream in 1985Introduction The Homestake Mining Co. has always been big on gold. After 108 years in the business, the company and its principal product are almost synonymous. The relationship continues. On Sept.
Jan 1, 1986
-
Analysis And Control Of Energy Consumption In Surface Coal Mining - Preprint 09-082By D. Bogunovic
The U.S. coal mining industry consumes a significant amount of energy, primarily diesel fuel and electricity. The continuous global increase in energy demand, high energy prices, and environmental iss
Jan 1, 2009
-
New Developments In Flow And Pipe Management Capabilities Through New Velocity Profile Measurement And Pipe Wall Wear Monitoring Instrumentation - Preprint 09-006New developments in the non-invasive and real-time measurement of the velocity profile of slurry flow in horizontal pipes will be described. This information can be used to determine the approach and
Jan 1, 2009
-
Tappan Zee Crossing of the Hudson River, New YorkBy Ian Hooper, Alan Winter, Stefan Sadokierski, Craig Covil
The existing Tappan Zee Bridge was built in the late 1950s and has been working over its design traffic load for some time now. A new project, which is being jointly sponsored by the New York State Th
Jan 1, 2005
-
Impact Of Consolidation On The Shear Strength Of Coal Refuse Impoundments – Preprint 97-110By R. J. Sweigard, C. T. Justice, T. Beckham, E. D. Thompson, T. C. Hopkins
Fine coal refuse is often pumped, as slurry, into surface impoundments as a means of permanent disposal. As the available volume is filled, the height of the embankments are frequently increased. Many
Feb 24, 1997
-
Design and Construction of the Shoal Creek Raw Water Intake at Lake LanierBy D. Rendini, R. D. Gutridge
INTRODUCTION Gwinnett County, Georgia, is a part of the rapidly expanding metropolitan Atlanta Georgia area. Located approximately 48 km (30 miles) northeast of Atlanta, Gwinnett County has a curr
Jan 1, 2005
-
Suspension Of Apatite Particles In A Self-Aerated Denver Laboratory Flotation CellBy O. A. Lima
Effective solids suspension is a necessary precondition for particle collection, and solids suspension is largely dependent on the hydrodynamics of the flotation cell. This study attempted to correlat
Jan 1, 2009
-
Lake Cumberland Raw Water Intake Structure—Somerset Water ServiceBy Timothy M. Bruner, William J. Maloney
Faced with rapid growth that strained their current water supply capabilities, the Somerset Water Service in Somerset, KY decided to construct a new intake structure on the shore of Lake Cumberland. W
Jan 1, 2001
-
Discussion - Mineral resource objectives of the Continental Scientific Drilling Committee’s dedicated drill holes and add-on science to solve mineral deposit problemsBy C. Meyer, J. J. Eidel
C. W. Hunt I wish to register strong disagreement with the choices of drilling sites chosen by the Continental Scientific Drilling Committee, while endorsing the stated objectives. Of special signifi
Jan 6, 1987
-
Lessons and implications from the onshore and offshore gas hydrate field production testsBy Se-joon Kim, Jong-hwa Chun
"‘Gas hydrate’ is the common term for a solid material formed from the combination of various gases as ‘guest’ and water as ‘host’. A series of large-scale scientific drilling and coring programmes co
Sep 1, 2014
-
The Economics Of Geothermal Heat As An Alternate Fuel ? IntroductionBy Donald Towse
Geothermal heat might become an important fuel for several reasons: (1) To substitute for other scarce and critical fuels. (2) Because it may be less costly to the user than alternate fuels. (3)
Jan 1, 1975
-
Increased value of refined high sulfur coalBy P. R. Dugan
Sulfur removal from high sulfur coal has several objectives including: a) reduction of the atmospheric load that contributes to the problem of acid precipitation; b) reduction of ash, which contribute
Jan 1, 1988
-
American College Tunnels in Athens, Greece—Design and Construction of Very Large Diameter Tunnels in RockBy S. Schina
Part of the Imittos Western Peripheral Motorway in Athens is the twin road tunnel in the vicinity of American College, with 20m excavation diameter. In the paper, the environmental and other requireme
Jan 1, 2001