Numerical modelling of tunnel liner and fracture interaction - SynopsisBy D. F. Malan
Considerable practical knowledge and effective use of empirical evidence is required in the design of tunnel support systems. In many instances, it is unclear how individual support elements interact
Jan 1, 2008
-
Reclamation And Environmental Management In Dimension Stone MiningBy I. Ashmole
From the point of view of the environmental impact created, dimension stone mining is a relatively benign industry. There are no emissions besides those of the diesel powered earthmoving equipment uti
Jan 1, 2008
-
Reducing coal quality variability with size optimization of blending pilesBy F. S. Beretta
Mineral processing efficiency depends on various factors and among them includes head grade fluctuations feeding the processing plant. Head grades can fluctuate beyond an admissible range, implying in
Jan 1, 2009
-
Valuation Of A Mineral Resource That Has A Compound Metal Content Distribution: An Example Based On The Merensky Reef At Wesizwe Platinum Limited?s Pilanesberg ProjectBy D. R. Young
Drilling exploration over the Wesizwe Platinum Limited?s Pilanesberg Project has identified the Merensky Reef at depths varying from 594 m to 1 552 m depth. Merensky Reef thickness varies from 0.05 m
Jan 1, 2006
-
Observations and analyses of roof guttering in a coal mine - SynopsisBy X. Ndlovu
Underground observations in a coal mine have indicated failure oft he immediate roof above the bords. Careful observations and photographic recording of occurrences of these roof failures, termed ?roo
Jan 1, 2007
-
The socio-economic aspects of mine closure and sustainable development?guideline for the socio-economic aspects of closure: Report 2 - Guideline for the socio-economic aspets of mine closureBy J. Stacey
There are four components to this guideline 1. Guidance on the socio-economic aspects of closure policy 2. Socio-economic closure activities mapped against the mining project life-cycle (a ?check st
Jan 1, 2010
-
The effectiveness of current control of submerged arc furnace electrode penetration in selected scenarios - SynopsisBy A. C. Mulholland
The electrical control of three-electrode submerged-arc furnaces suffers from a number of complexities, mostly due to the nature of the furnace electrical circuit providing power to the furnace where
Jan 1, 2009
-
The Application Of Facies Classification In Evaluating The Merensky Reef At Bafokeng Rasimone Platinum Mine, South AfricaBy K. G. Lomberg, M. D. Lionnet
The Bafokeng Rasimone Platinum Mine (BRPM) is a joint venture between Rustenburg Platinum Mines Limited and Royal Bafokeng Resources (Pty) Ltd (Bafokeng). The mining lease has been granted over Boschk
Jan 1, 2006
-
A Review of Work-Integrated Learning in South African Mining Engineering UniversitiesBy L. A. Maseko
"As part of the mining engineering curriculum, students are required to be placed in industry for vacation work or work-integrated learning (WIL). In this paper we review work-based placement as done
Dec 1, 2018
-
Calcination Characteristics Of Laterite Ores From The Central Region Of Anatolia ? SynopsisBy E. Keskinkilic
Drying, calcination, prereduction, and smelting are the main steps in conventional crude ferronickel production. Industrially, these steps are conducted using the rotary kiln-electric arc furnace (RKE
Jan 1, 2012
-
Maintenance and major repairs of tap-holes and tapping spoutsBy L. H. Lindstad
The paper reviews the tapping process and the major wear mechanisms on the tap-hole, including wear from tapping tools. Measured temperatures in different tap-holes are related to choice of binder and
Jan 1, 2014
-
Increasing the capacity of existing and new exothermic autoclave circuits - SynopsisBy G. M. Dunn
Pressure leach autoclave circuits are employed in the leaching of ores, concentrates, mattes, alloys and intermediates for the recovery of metals into solution. Once the metals are extracted into solu
Jan 1, 2009
-
Summary of results of ACARP project on cross-belt cuttersA project was funded by the Australian coal industry to investigate the mechanisms that might lead to sample bias when using cross-belt cutters, in order to help coal industry personnel to make better
Jan 1, 2009
-
The LUREC® process?key to economic smelter acid plant operation - SynopsisBy K. -H. Daum
Over many decades, numerous feasibility studies have demonstrated, that the production of sulphuric acid remains the most viable option of sulphur recovery from smelter off gas and abatement of SO2 em
Jan 1, 2009
-
The Introduction of a Stiff Rockbolt and Hanging Wall Control Management System at a Platinum Mine in South AfricaBy P. Altounyan, K. Akermann, T. Van den Berg
Amandelbult Mine is currently undertaking a trial to mechanise the mining of the UG2 reef through the introduction of room and pillar mining. As part of the trial, a system of managing the control of
Jan 1, 2003
-
Using laser scanner face mapping to improve geotechnical data confidence at Sishen mineBy T. M. Russell
"Face mapping is a simple but invaluable means of geological and geotechnical data acquisition whereby intact rock properties, rock mass properties, discontinuity properties, and structural orientatio
Jan 1, 2018
-
A comparison between the duplicate series method and the heterogeneity test as methods for calculating Gy?s sampling constants, K and alphaThe compilation of the sampling nomogram is an essential tool in the optimization of a sampling protocol and allows the operator to track the change in relative variance of the sampling error (the Fun
Jan 1, 2009
-
Shaft Sinking Methods Based On The Townlands Ore Replacement Project ? Raiseboring. - 1. SynopsisBy D. Visser
This paper is based on the Townlands Ore Replacement Project whereby the concept of conventional sinking of one large diameter shaft was declined and replaced with three smaller raise bored shafts. A
Jan 1, 2009
-
Shaft Sinking Methods Based On The Townlands Ore Replacement Project ? Raiseboring. - 1. Synopsis (1a409def-2d2d-4370-aaf2-3d4061365083)By D. Visser
This paper is based on the Townlands Ore Replacement Project whereby the concept of conventional sinking of one large diameter shaft was declined and replaced with three smaller raise bored shafts. A
Jan 1, 2009
-
A Simple Framework For Developing A Concept Beneficiation Flow SheetBy J. Rabe
Tasked with developing a flow sheet for a new resource, one typically turns the experts for help. The advice of an expert can be invaluable in reducing the time and costs associated with characterizin
Jan 1, 2014