Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Three-Dimensional Numerical Modelling of Load Distribution and Settlement of Pile GroupsBy Onur Kacar
A numerical approach has been implemented to assess the settlements of pile groups bearing in clay. A three-dimensional finite element program has been utilized to model a vertically loaded spread foo
Jan 1, 2018
-
Comparison Of Static Load Test And Dynamic Pile Testing ResultsBy Patrick J. Hannigan
A comparison of 40 statically and dynamically load tested piles was performed to evaluate the variation between testing methods. This evaluation indicated an agreement of 10% to 15% could be obtained
Jan 1, 1987
-
Compensation Grouting Under Real-Time Monitoring, Rio Piedras Project, San Juan, Puerto Rico - Deep Foundations Institute 25th Annual Meeting And 8th International Conference New York USA, October 5-7, 2000By Jean-Pierre Hamelin
Ground movements induced by underground excavation are always of critical concern, particularly in urban areas. Compensation grouting now appears as a safe means to control these movements. The paper
Jan 1, 2000
-
Ground Vibrations from Pile and Sheet Pile Driving Part 2 — Review of Vibration StandardsBy K. Rainer Massarsch, Bengt H. Fellenius
"Abstract Vibration limits for buildings with respect to ground vibrations from pile driving published in international standards are reviewed. At first, relevant vibration parameters are defined and
Jan 1, 2014
-
The Determination Of The Property Index Of Stabilizing Agent And Computer Simulation For The Optimum Mix In Deep Foundation ConstructionBy Li Huimin
In this paper the step of determining the property index and the program of mixture ratio design of stabilizing agent in deep foundation construction are presented. According to the principle of compu
Jan 1, 1991
-
The Use of the Expander Body with Cast in Situ Piles in Sandy SoilsBy Mario A. Terceros H., K. Rainer Massarsch
"ABSTRACTThe Expander Body (EB) technology has been used successfully to increase the pile toe capacity of bored piles in loose to medium dense soil. An important advantage of the EB system is the abi
Jan 1, 2014
-
Operator Independent Installation Of Lime Cement (L/C) ColumnsBy Tobias Hansson
The quality of Lime Cement (L/C) columns is to a great extent dependent on the installation procedure. At a site in the south of Sweden, the client reported problems with the installed columns. To eva
Jan 1, 2000
-
Presentation #4 - Reflections On Pile Integrity TestingBy Joram M. Amir
Even when they are cased! [ ] In bored piles, as well as in drilled shafts, and in caissons too, defects will occur! [ ]
Jan 1, 2001
-
Minipiles In Soft Marine Deposits Rescue Sinking WarehouseBy Bruno Gemmi
A new warehouse built with prefabricated components over an area underlined by soft marine soil deposits started showing differential settlements well before its completion. Its 103 spread footings c
Jan 1, 2011
-
Video Inspection Of Rock Sockets For A Piling ProjectBy Ali Ameli
Design loads are limited for piles relying upon toe stresses in rock due to uncertainty about the rock quality over the whole pile diameter because of rock mass properties or construction effects. Th
Jan 1, 2006
-
Case History - Augered Cast-In-Place Piling Installed Into Weathered SandstoneBy Edwin W. Meyer
The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560
Jan 1, 2006
-
Effective Dewatering Is More Than A Pump In The Hole - A Presentation At The Deep Foundations Institute Annual Meeting St. Louis, Missouri, November 1980By William J. Rothschild
Ground water at construction sites can be controlled by properly placed wellpoint dewatering systems. Care must be taken in planning cofferdams to have adequate space for and access to pumps, headers
Jan 1, 1984
-
High-Capacity Rock Anchors Provide Uplift Resistance For Concrete-Filled Steel Pipe Piles - A Case StudyBy James Weaver
During the past 16 years, the authors have successfully used high-capacity rock anchors installed inside open-ended pipe piles, driven to bedrock, to provide uplift and overturning resistance for vari
Jan 1, 2011
-
Limited Access Underpinning And Re-Leveling Of A Six-Story Office Building Using Jet Grouted MicropilesBy Tom Szynakiewicz
Micropiles are routinely used in the United States for foundation support and underpinning applications. The high capacities achievable with the use of micropiles, combined with specialty rigs for ea
Jan 1, 2008
-
Monitoring And Quality Control Of A 100 Metre Deep Diaphragm WallBy D. A. Bruce
To check the feasibility and the quality of a very deep diaphragm wall, a tern of adjacent panels has been constructed, up to a depth of 100 m, in the Milan sandy gravelly soil by means of a hydraulic
Jan 1, 1989
-
Helical Piles With Grouted Shafts - A Practical OverviewBy Gary L. Seider
Helical screw piles are used in various applications including the underpinning of distressed foundations and as deep foundations for new structures. At present, maximum design loads range between 12.
Jan 1, 2003
-
PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case HistoryBy Chris D. Shewmaker
So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po
Jan 1, 2004
-
Pile Design For Offshore Structures Subjected To SubsidenceBy Juan J. Campo
The Freeport-McMoRan Main Pass Mine development in the Gulf of Mexico is a complex designed to extract up to 67 million long tons of sulphur over a 40 year period. The initial development includes 15
Jan 1, 1992
-
Underpinning Support Pipeline Compressor Station Founded On Timber Piles Potter, Ontario - DFI Conference, Toronto, Oct 1997 - Underpinning Support - Pipeline Compressor Station - BackgroundBy Brian Isherwood
TransCanada Pipelines, Calgary (TCPL) is one of North America's leading transporters of natural gas through its energy transmission business. TransCanada also operates significant complementary b
Jan 1, 1997
-
Statnamic Loading Tests On Different Pile Types - 1.0 IntroductionBy Patrick Bermingham
This report presents the results of six STATNAMIC loading tests that were carried out on four different pile types at the CALTRANS 280 Test Site (Bridge No. 34-46) in conjunction with the Tension Pile
Jan 1, 1993