Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Water Powered Percussive Downhole Hammers – Energy Savings And ProductivityBy Shyam Chengalath, Johan Jeansson, Magnus Hörman
Down-The-Hole (DTH) drilling usually uses compressed air to power the hammer. However, there are now DTH hammers on the market which instead of compressed air use high pressure water to power the hamm
Sep 1, 2022
-
Alternative Analytical Methods for Borehole Permeability Tests in Seepage Barrier WallsBy R. Lee Wooten, David R. Shields, Darren D. Clark
"Borehole permeability tests that measure flow or head changes in boreholes located within seepage barrier walls are commonly used to estimate the in situ permeabilities of those walls for quality con
Jan 1, 2016
-
Driven Pile Foundation Design and Construction Issues for a Highrise Building in ManhattanBy Satyajit Vaidya, Rudolph Frizzi, Sandy Larimer
"This paper presents a case history in design and construction of a deep foundation system that included high-capacity open-ended driven piles constructed to support a high-rise building in Manhattan,
Jan 1, 2016
-
Cement Deep Soil Mixing Shear Wall Stabilization Calaveras Dam Replacement Project, CaliforniaBy Michael Forrest, John Roadifer, Glen Gorski
"The Calaveras Dam Replacement Project (CDRP) requires large disposal sites to store excess excavated materials that could not be utilized for dam construction. Because of access restrictions during d
Jan 1, 2015
-
Today’s Connectivity: Using Historical Data to Anticipate Future RiskBy Michael Frawley, Deana Ruud, Jessica Turner
Technology is allowing for new ways to mitigate risk associated with subsurface exploration and unanticipated subsurface conditions during construction. Unanticipated subsurface conditions have the po
Jan 1, 2019
-
Jet Grout Underpinning to Support the Waterman HospitalBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
The Waterman Hospital in Tavares, Florida was undergoing an expansion and required a below-grade excavation immediately adjacent to the Emergency Department. This wing of the hospital was under high t
Jan 1, 2019
-
Nicholson In The Neighborhood: Virginia’S North Hill ProjectBy Dominic Ammon, Mark Rothbauer, Paul Landers P. E.
Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct
Oct 1, 2022
-
John F. Kennedy Airport Site Redevelopment: Tapertube Pile FoundationBy Gisele R. Passalacqua, Aly Mohammad, Joanna Smith
The $13 billion John F. Kennedy (JFK) airport construction redevelopment program includes new terminals and buildings that are supported on piles to meet the airport expansion demand due to increased
-
A Digital Twin For Deep Vibro Ground ImprovementBy Negin Khalili-Motlagh-Kasmaei, Paul O'Leary, Christopher J. Rothsiedl, Dimitar Ninesvski, Alexander Zöhrer, Vincent Winter
This paper presents the implementation of a digital twin for the vibro-replacement ground improvement process, as part of a digital construction site. The goal is to implement an evidence-based qualit
May 1, 2022
-
Excavation-Induced Movement of Adjacent FoundationsBy Hugo Meggitt, Damian R. Siebert, Wystan Carswell
Excavation-induced ground movements are a critical component in the design and construction of deep excavations in urban settings due to the potential adverse effects on adjacent structures and infras
Jan 1, 2019
-
Effective Sampling, Testing and Specification Approaches for Deep Mixing at Kitimat LNG, BCBy Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li, Donald A. Bruce
"In-situ wet grab sampling and post-installation coring of soil-cement structures are typically carried out for Quality Control (QC) and Quality Assurance (QA) of deep mixing (DM) schemes. Wet grab sa
Jan 1, 2015
-
Emergency Stabilization to Maintain CN Rail ServiceBy Rick Deschamps
"Fountain Slide is located approximately 10 mi (16 km) northeast of Lillooet, British Columbia, Canada, within the Coastal Mountain Range, and has been locally active since the 1970s. The project site
Jan 1, 2017
-
Soil-Mix-Sandwich (SMS)By Ali S. Fayad
"In June 2014, Orange County Flood Control District (OCFCD) completed construction improvements of the East Garden Grove-Wintersburg Channel for a price of $42 million. Instead of the pre-existing tra
Jan 1, 2015
-
Goethals Bridge Replacement Foundation Design Modifications Due to Field ConditionsBy John P. Turner, Mark Jen, Bobby Daita
"The Port Authority of New York and New Jersey is replacing the existing Goethals Bridge built in 1928 which is deemed to be functionally obsolete. The replacement bridge will consist of a dual cable-
Jan 1, 2016
-
Friction Fatigue and Drivability Analysis of Open Ended Pipe Piles Based on Cone Penetration Testing ResultsBy Frank Rausche, Scott D. Webster, Rozbeh B. Moghaddam
"Pile foundation driveability is a function of several variables such as subsurface characteristics, hammer type, hammer efficiency, pile type, and plugging conditions. One important phenomenon occurr
Jan 1, 2017
-
Brickworks Marketplace Ground Improvement, AdelaideBy Andrew Middleton, Mark Wyatt
"The Brickworks Marketplace Project is a significant shopping centre development in inner north west Adelaide constructed by Badge Constructions in 2014 and 2015. The site was a former brickworks with
Jan 1, 1900
-
Improvements to Commonly Used Cutoff Wall SpecificationsBy Michael Kynett, Francke Walberg, Richard Millet, Khaled Chowdhury, Mary Perlea
"Cutoff walls are the most common seepage improvement measure for levee flood control projects throughout California’s Central Valley. Cutoff walls are widely used because they can be implemented with
Jan 1, 2015
-
Interpretation and Evaluation of Thermal Integrity Profiling MeasurementsBy Seth Robertson, Daniel Belardo, Travis Coleman
Thermal Integrity Profiling (TIP) is a non-destructive method used to evaluate drilled deep foundation integrity. This integrity testing method is specified more frequently, and is becoming an indust
Sep 8, 2021
-
Application Of Pile Test Data For The Foundation Design Of Rail Viaduct At Carrum, VictoriaBy Nick M. Withers, Suthagarann Visvalingam, Cillian Mc Colgan
The level crossings removal project in Victoria is removing 75 level crossings across Melbourne to improve safety by separating trains from traffic, with other benefits such as reduced congestion, an
Nov 1, 2022
-
Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load TestingBy Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l
Sep 8, 2021