Ground Improvement for Reclaimed LandfillsBy Steven E. Darnell, William W. Haasz, Brandon T. Buschmeier, Frederic Masse
"Landfills often cover expansive areas in locations where large building facilities or infrastructure is in high in demand after the land has been reclaimed. Most landfills have soil or fill propertie
Jan 1, 2017
-
Performance Of Open And Close-End Screw Piles In Bearing LayerBy Faisal Shalzad, Adnan Anwar Malik, Tadashi Maejima, Jiro Kuwano
Single helix screw piles carry most of the structural load through end-bearing if the helix is embedded in the dense bearing layer. The tip condition of the central shaft of the screw pile can be clos
Oct 1, 2022
-
Field Measurements Of In-Situ Equipment Track Pressure And Working Platform Deformation Using Earth Pressure Cells And Fiber OpticsBy Peter Faust, Peter Hubbard, Kenichi Soga
The European Federation of Foundation Contractors (EFFC) and The Deep Foundations Institute (DFI) have set up a task group to compile a Guide for Working Platforms. The first edition of this Guide has
May 1, 2022
-
Top-Loaded Bi-Directional Test and the Conventional Bi-Directional Load Test, a Direct ComparisonBy Patrick J. Hannigan, Seth Robertson, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) and the conventional Bi-Directional Load Test (“BDLT”) are full-scale load tests where loads are applied bi-directionally to the foundation element. The BDL
Sep 8, 2021
-
In-Situ Study On Improvement Of Soft Ground Using Stone Columns For Railway EmbankmentBy Kishore Kumar B., Eswaran Prasad C R, Srini Naik B., Ramakrishna Raju N
The authors through this paper intend to introduce the non-vibro technique of ground improvement by stone column, being used for the first time in India under the Western Dedicated freight Corridor in
Nov 1, 2022
-
Installation Of Three Up To 120M Deep Diaphragm Wall Shafts, With Diameters Between 8M And 35M At Woodsmith Mine In North Yorkshire (England)By Gustav Jahner, Michael Baltrusch, Norbert Hoffmann
Near the port city of Whitby in the north-east of England, Anglo American (AA) is setting up the deepest mine in the UK, which will have a depth of 1,500m. The purpose of the project is to extract and
Sep 1, 2022
-
Liner Piles Used As Support To Kentledge For Initial Compression Load TestBy Venugopal B, M Kumaran, Thomas John, Vetriselvan A
The initial pile load tests are conducted to ensure the geotechnical capacity of the pile in a particular site condition. Normally kentledge method is adopted for the compression pile load tests. In t
Nov 1, 2022
-
Adaptive Design and Contractual Approaches to Address Geotechnical Uncertainties in a Design-Build Ground Improvement ProjectBy Kalyani Devabhaktuni, Mike Minton, Mark T. Howe, Yan Zhang
During the procurement phase of a Design-Build (DB) project, design-build contractors must often commit to a fixed price based on limited or incomplete geotechnical information. This lack of informati
Jan 1, 2019
-
Deep Mixing in the United States: Milestones in EvolutionBy Donald A. Bruce
"The Deep Mixing Methods (DMM), in their current forms, have been employed in the United States since 1986, although an earlier version had seen service from 1954. The earlier developments were strong
Jan 1, 2015
-
Simulation Of Soil-structure Interaction With Sheet Pile And Retained SoilBy Clarissa Aguiar, Seok hyeon Chai, Thamer Yacoub, Sina Javankhoshdel
Sheet piles are used as an excavation support for soil retention. They are interlocked systems to form a wall for earth support along with anchors to provide an extra lateral support in excavations. T
-
Subsurface Component Design and Construction for a High-Rise in a Dense Urban Environment: A Case History of the 181 Fremont TowerBy Kirk Ellison, Eric S. Lindquist, Peter Faust, Stephen M. McLandrich
"The 181 Fremont Tower will be an 800-foot high-rise with a 60-foot deep basement located in a dense urban part of downtown San Francisco. The design and construction methods of the subsurface element
Jan 1, 2017
-
Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs ExtensionBy Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015
-
St. Anthony Falls, I-35w Bridge Drilled Shaft Load Test ProgramBy Jeffrey A. Gebhard
As part of the design and construction of the new St. Anthony Falls I-35W Bridge, a full-scale load test was conducted on a 6 1/2-foot diameter drilled shaft in the St. Peter Sandstone. This load tes
Jan 1, 2009
-
Jet Grouting for Strength in Marine Sediments with HydrocarbonsBy Paul M. Schuman, Alessandro Bertero, Giuliana A. Zelada, Sharon G. Cranston
Many jet grouted columns were recently installed to create a jet grout-treated soil foundation for an earthen embankment used in a large shoreline stabilization project in the Mystic River in Charlest
Jan 1, 2019
-
Wrigley Field – The 1060 ProjectBy Darren S. Diehm
"Construction for the restoration and expansion of 102-year-old Wrigley Field in Chicago, Illinois began at the conclusion of the 2014 baseball season. This six year project involves structural upgrad
Jan 1, 1900
-
Innovative Alternate Underpinning Solution for Historic Structure in Boston SuburbBy Eric P. Bregman, Justin Zarrella, Ryan M. Coulson, Connor Johnson
Within a prominent Boston, MA suburb are a pair of historic stone and mortar structures built in the late 1800’s. Both the Main House and Carriage House have been maintained and occupied throughout th
Sep 8, 2021
-
Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee ProgramBy Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas
The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re
Sep 8, 2021
-
TTMJ – The New System for Slurry (Diaphragm) Wall JointsBy Maurizio Siepi, Paul van Horn, John Coupland, Julian Crawley
"TTMJ is the acronym for the Slurry (Diaphragm) Wall Tension Track Milled Joint currently in development as part of the European Union's innovative and far-reaching Horizon 2020 initiative (FTI Pilot-
Jan 1, 2017
-
In-Situ Ground Reinforcement TechniquesBy P. J. Nicholson
The methods of reinforcement to be discussed in this paper are all insitu methods, ones that can be used on the soil structure as it exists in the ground, and do not rely on excavation and replacement
Jan 1, 2010
-
Design of Grillage and Helical Pile Foundation for Limited Access Transmission LineBy Benjamin Jennings, Jason Herron
In the summer of 2016 Xcel Energy experienced a storm event that resulted in the collapse of approximately 8.5 miles of a 345 KV transmission line near Rogers, Minnesota. In design of the new transmis
Jan 1, 2017