Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand Silos

    A key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings

    May 1, 2007

  • CIM
    Implementation of Paste Backfill at the Williams Mine

    By Eric Konigsmann, Doug Spence, Scott Jones

    "The Williams Gold Mine is located in the Hemlo camp of Northwestern Ontario and is one of Canada’s largest gold producers with annual gold production of 400,000 ounces. The operation is owned and ope

    Jan 1, 2004

  • CIM
    Heap Leaching Methods in the Western United States and Applicability to Canada

    By Thorndycraftm R. B.

    "PURPOSEThe purpose of this presentation to the Canadian Mineral Processors is to review gold heap leaching systems currently in use and discuss their applicability to Canadian ores. The author's expe

    Jan 1, 1984

  • CIM
    The Operating Range Method for Backfill Hydraulics

    By D. J. Hallbom

    This paper presents a novel methodology for the hydraulic design of mine backfill distribution systems. The ?operating range? method uses the concepts of the hydraulic grade line and equivalent pipe l

    May 1, 2007

  • CIM
    Yield Stress Measurement of Cemented Paste Backfill with the Vane Method and Slump Tests

    By A. S. Moghaddam

    The transportation of cemented and non-cemented mine tailings in the form of paste through pipelines is one of the main stages of paste backfill operations. For the purpose of pipeline design, the rhe

    May 1, 2007

  • CIM
    The Xietongmen Copper-Gold Deposit: A Major New Porphyry-Style Discovery in Tibet, People?s Republic of China

    By James R. Lang

    The Xietongmen deposit is located 350 km west of Lhasa, Tibet. It is a new, high-grade porphyry copper-gold discovery and the first deposit to be systematically explored by a western company in southe

    May 1, 2006

  • CIM
    Use of Till Geochemistry and Mineralogy to Outline Areas Underlain by Diamondiferous Spessartite Dikes near Wawa, Ontario

    By Christopher F. Gleeson, Roger D. Thomas

    "Abstract - Wawa has long been a center of mineral exploration activity and diamonds have been reported in the area since the 1930s. However, diamond exploration did not begin in the area in earnest u

    Jan 1, 2000

  • CIM
    Stress Measurements at Great Depth at Craig-Onaping Mines, Sudbury Canada

    Reliable estimation of in situ stress is a major step in the analysis and design of underground excavations in rock, particularly for evaluating the stability of underground structures to prevent fail

    May 1, 2009

  • CIM
    Engineering Excellence into Large Diameter Drill and Blast Shaft Sinking Stages and Galloways for Safety and Productivity

    By T. E. Wakefield

    "Final Galloway (stage) designs for vertical drill and blast shaft sinking projects evolve from complex thought patterns which integrate operational processes, systems and methods of communication, po

    Jan 1, 2019

  • CIM
    New Type of Organically Capped Gold Nanoparticles prepared by Controlled Thermolysis of Gold Complexes

    By Masami Nakamoto

    Controlled thermolysis of gold(I) thiolate complex, [C14H29(CH3)3N][Au(SC12H25)2], at 180 °C for 5 h under an N2 atmosphere produces novel gold nanoparticles passivated by alkyl groups derived from th

    Oct 1, 2003

  • CIM
    Process Applicaiton Design of Hydrocyclones for Closed-Circuit Grinding

    "Generation and removal of fines are considered in the context of the mill and classifier as a single-unit process in which grinding rates and mechanisms, mill residence time distribution, circulating

    Jan 1, 1984

  • CIM
    Growth through Continuous Improvement - Heap Leach Processing and Gravity Expansion at Fort Knox Gold Mine

    By James L. Oleson, Hunter R. Propsom, Kevan J. R. Ford, Robert D. Henderson, Bob Musgrove

    "Kinross’ Fort Knox Gold mine, near Fairbanks, Alaska has successfully implemented two major metallurgical continuous improvement projects resulting in growth of gold production and an extension of mi

    Jan 1, 2011

  • CIM
    The Cinola Project, Process and Environment

    By C. J. A. Davie

    "SUMMARY A practical application of nitric acid oxidation of sulphides, based on the principles of the Arseno process, has been developed for the Cinola ore. Development of the process has been based

    Jan 1, 1989

  • CIM
    The Cigar Lake project — Mining, ore handling and milling

    By 12670

    The Cigar Lake project will develop the world’s second largest high-grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U3

    Jan 1, 2004

  • CIM
    Hazard Map Approach Using Space-time Clustering Analysis of Mining-induced Microseismicity

    By Pavel Vasak

    Microseismic monitoring has become standard practice in the mining industry as a ground control monitoring tool at depth. Translating the information into practical hazard assessment tools for the roc

    May 1, 2004

  • CIM
    Improving Fluorine-Bearing Minerals Rejection in the Flotation of a Brazilian Sulphide Copper Ore

    By Keila Gonçalves, Aline Tavares, Danielly Couto

    "The sulphide copper deposits from the Carajás area (North region of Brazil) were generated by the percolation of hydrothermal fluids in volcanic and granitic rock and are denominated as IOCG deposits

    Jan 1, 2011

  • CIM
    Design of the Pierina waste dump

    By R. Sharon, P. M. Hawley, X. Ochoa

    "Development of Barrick Gold’s Pierina gold mine in north-central Peru requires construction of a waste dump for disposal of nonore grade materials stripped from the open pit to expose the ore. The wa

    Jan 1, 2003

  • CIM
    Effect of Operating Variables in Knelson Concentrators: A Pilot-Scale Study

    By Sunil Koppalkar, A. R. Laplante

    "A Pilot Plant was installed in one of the grinding circuits of the Dome Mill, Ontario, Canada. Tests were conducted on a KCCD12 Knelson Concentrator to systematically analyze the effect of operating

    Jan 1, 2007

  • CIM
    Training to Process Analysis Methods using a Gold Leaching Simulator

    By Jessica Egan, Daniel Hodouin, Mohammed Reza Khalezi, Steve Bellec, Claude Bazin, Carl Duchesne

    "A model for gold leaching was developed and implemented into a simulator. The simulator uses a description of the ore that is based on the mineral composition and precious metal content. The model ac

    Jan 1, 2008

  • CIM
    An Investigation in the Stand up Time of Stopesat Birchtree Mine in Thompson, Manitoba

    By Matthew Violot

    Introduction ?Located off highway 6, approximately 5 km, SW of Thompson, Manitoba ?Base metal mine: Nickel? Maximum Depth: 4100 ft ?Started Production in 1966 (INCO, 2006)?Halted in 1978?Re-opened

    Nov 1, 2011