Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Dissolution of AlTiSi intermetallic compounds in A356 Al-Si alloy

    By A. Jafarnia

    Aluminum alloys are frequently grain refined during solidification in order to promote the formation of an equiaxed grain structure in the casting. The application of Ti-based grain refiners and/or Ti

    Jan 1, 2004

  • CIM
    Ventilation on Demand ? The Impact of Sensors, Installation, Control Strategies, Commissioning and Advanced Controls Performance

    By J. Janzen

    The cost to supply ventilation may exceed 40% of the total mine energy cost for underground mines and is often higher for deeper mines. The goal of Ventilation-on-Demand (VOD) is to ensure that the re

    Aug 1, 2013

  • CIM
    Coalmine Ground Seismic for Advance Detection of Goafs and Roadways

    By Si Qin

    Unknown goafs and roadways of abandoned coalmines can be a great water inrush hazard for coalmine workers. Consequently, advance detection of such hazards is of great importance. By detonating seismic

    Aug 1, 2013

  • CIM
    Recovery of Barytes at Walton, N.S.

    By G. G. Campbell

    "HistoricalBARYTES was mined in Nova Scotia as early as 1874 from a deposit at Five Islands, on the north shore of Minas Basin. The first record of the presence of the mineral at the Walton site appea

    Jan 1, 1952

  • CIM
    Real Time Monitoring of Cemented Paste Backfill

    Real Time Monitoring of Cemented Paste Backfill Introduction Methods ?how to instrument a Long Hole stope Key Results from 2 case studies: barricade pressures and displacement, in-stope pressure

    May 1, 2010

  • CIM
    Isn't bigger always better? Applying Economic Profit to Exploration Management

    By Christopher A. Jacobs

    Project managers aim to maximise the NPV of their projects, but don't always appreciate the relationship between mine throughput, project value and the discount rate being used to evaluate their

    May 1, 2006

  • CIM
    Tapblock Diagnostic System

    By P. Tracy

    An advanced real-time monitoring system, called a "Tapblock Diagnostic System" is under development to help furnace operators manage the operation and maintenance of their tapblocks. The life of a wat

    Jan 1, 2007

  • CIM
    Simulation of Brazilian Test Using PFC2D Grain-Based Model

    By Navid Bahrani

    The grain-based model (GBM) has resolved the difficulty of matching both the directtension (sc) and unconfined-compressive (st strengths of typical brittle rock by providing a synthetic material that

    Jun 1, 2012

  • CIM
    Recent Smelting & Acid Plant Operation at Saganoseki Smelter

    By F. Hashiuchi

    In 1996, the Saganoseki custom smelter & refinery successfully shifted to a single flash smelting furnace operation and increased the copper production capacity to 450,000mtpy in 1998. As the next ste

    Jan 1, 2007

  • CIM
    Model for Fine Wet Screening

    By S. Simukanga, J. Masinja, P. A. Bepswa, A. N. Mwale

    Screening is an important operation in dry and wet closed circuit mineral processing applications. Most of the operations have seen the benefits of using fine wet screens in primary grinding sections

    Jan 1, 2016

  • CIM
    Planning and Development of the Lake Dufault Mine

    By J. R. Smith

    "The Lake Dufault orebodies were discovered by deep surface diamond drilling. When a reasonable amount of outline drilling had been completed, the decision to go into production was made. The fact tha

    Jan 1, 1966

  • CIM
    Automatic Reagent Control in the Bralorned Cyanidation Circuit

    "INTRODUCTIONThe Department of Energy, Mines and Resources has recently developed two automatic controls for use in the cyanidation circuits of Canadian gold mills. These controls are the alkalinity p

    Jan 1, 1967

  • CIM
    In Situ Image Analysis of Batch Settling of Flocculated Minerals with Physical-Statiscal Feature Extraction Method

    By M. R. MacIver, M. P. Pawlik

    "An image analysis method based on chord length distributions is applied to the batch settling of polyacrylamide flocculated kaolin suspensions. Two features of the interaggregate void space, the void

    Jan 1, 2016

  • CIM
    Hydrogen Embrittlement and Stress Corrosion Cracking Behavior of a-Titanium Alloy

    By Z. Sun

    The hydrogen embrittlement and stress-corrosion cracking (SCC) behavior of an a -titanium alloy and its two kinds of welding samples have been investigated. The results show that this alloy has very l

    Jan 1, 2005

  • CIM
    Alkaline Sulfide Leaching Technology; Just the Facts

    By C. G. Anderson

    Alkaline sulfide leaching technology (i.e. ASL) has been studied, presented and published throughout the literature and utilized in some current engineering studies. Yet, the actual industrial applica

    Jan 1, 2014

  • CIM
    Water treatment

    By P. M. Shibley

    "IntroductionMine drainage, surface. drainage and process liquors are the principal mine and mill effluents. The quantity and quality of these flows varies according to mineralogy, type and scale of m

    Jan 1, 1989

  • CIM
    Quality Assurance Programs for Fabrication of Specialised Vessels and Exotic Alloy Piping

    By M. Pearson, W. Bristowe, A. Hanson

    "There's no such thing as quality assurance; only quality control ... by inspection. "(1) A common misunderstanding in the procurement and construction of custom designed, fabricated pressure ves

    Jan 1, 2004

  • CIM
    Development of High Quality Steel Slab for Oil and Gas Line Pipe Application

    By W. Basuki, B. Setyotomo, L. Hakim, R. Hendrajaya

    Due to high crack sensitivity of slab product of gas and oil line pipe application, its steel making process and alloy composition were evaluated and then improved to overcome its critical solidificat

    Jan 1, 2005

  • CIM
    Investigation of the Increase in Resistivity in the Steel Collector Bar Used in Aluminum Electrolysis Cells

    By G. Gauvin

    Life span of aluminum smelting electrolysis cells can reach up to 3000 days. During this period, cathode blocks go under various physical and chemical changes that could result in an increase of elect

    Jan 1, 2011

  • CIM
    Anisotropic Closure Analysis of a Drift in Callovo-Oxfordian Claystone based on In-Situ Convergence Data

    By L. M. Guayacán-Carrillo, G. Armand, A. Noiret, D. Seyedi, S. Ghabezloo, J. Sulem

    "The main purpose of this paper is to analyze the convergence measurements in a drift excavated in the Callovo-Oxfordian claystone. The drift axis is in the direction of the major principal horizontal

    Jan 1, 2015