Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Integrated Grinding and Flotation Simulations for the Improvement of Circuit Performance at BHP-Billiton’s Minera Escondida

    By H. E. Urtubia, C. W. Bailey

    "BHP-Billiton’s Minera Escondida Limitada is one of the world’s largest copper producers. It treats a combined 88 million tons of copper ore per year through its two concentrators: Los Colorados and L

    Jan 1, 2007

  • CIM
    The Post-Failure Characteristics of Rock - Pt 1: Intact and Broken Rock

    By T. G. Joseph

    A strain-softening constitutive relationship is introduced that describes the post-failure stress-strain curve for rock regardless of whether the rock is intact or broken. The core of this relationshi

    May 1, 2002

  • CIM
    The David Bell Mine Water Quality Management Strategy (e343643b-635a-4023-9840-0613ce7068b5)

    By K. Meyer, M. E. Goddfellow

    "At Teck-Corona Operating Corporation's David Bell Mine, a water quality management strategy is employed to produce both a chemically and biologically clean effluent prior to discharge to the environm

    Jan 1, 1991

  • CIM
    Stereolithography—a rapid prototyping technique for orebody modelling and mine design

    By A. Akerman, C. P. O’Connor, N. Vayenas

    "Stereolithography is a well-known rapid prototyping technique in the manufacturing sector. Essentially, it is a three-dimensional printing process that produces plastic prototype parts from standard

    Jan 1, 2006

  • CIM
    The New Red Lake Mine: Narrow Vein Mining in Deep, Burst-Prone Ground

    By Pierre Rocque

    The Red Lake Mine is located approximately 600 km northwest of Thunder Bay. This 545 tpd (600 tons/day) underground narrow vein gold operation is set to produce in excess of 14.8 tonnes (475,000 ounce

    Oct 1, 2001

  • CIM
    Island Copper Mine Milling for Copper and Molybdenum

    By Chris Brown

    "The Island Copper plant was designed and built by Fluor Utah Ltd, in conjunction with Utah design staff, Originally designed to treat 33,000 tons/day (t/d) of ore, the current average milling capabil

    Jan 1, 1975

  • CIM
    The Red Dog VIP Mill Optimization Project A Study in Fast-Track Project Execution and Alliance Contracting (5aae1f12-06e2-4656-a27b-a608072456ab)

    By George H. Hope, Steve Ciccone

    "The Red Dog Mine is both the largest known zinc reserve and the largest zinc producer in the world. The mine started in 1989, and by 1999 had increased production from approximately 300,000 tonnes pe

    Jan 1, 2003

  • CIM
    Measurement of Ball Size Distribution in a 8 m x 5 m Primary Mill of Sarcheshmeh Copper Mine

    By M. Pourkani, M. Karga, Samid Banis, Andre Laplante, G. Langari-Zadeh

    "The Sarcheshmeh mine processes 40,000 t/d of ore grading 0.9% Cu and 0.035% Mo. Grinding is effected in single stage ball mills using 80 mm forged steel balls, with an average consumption of 850 g/t.

    Jan 1, 1999

  • CIM
    Process Safety Management

    By Ertugrul Alp

    Alp & Associates - Who We Are ?? Canadian consulting company (1999-?) ?? Principal Consultant: Dr. Ertugrul Alp, P.Eng. ?? Over twenty-five years experience serving the chemical, mining, pulp & pap

    May 1, 2008

  • CIM
    Thermal rock fragmentation — Applications in narrow-vein extraction (abb2f77e-ef62-4687-9449-c7f2069ea82d)

    By D. Brisebois, J. M. Fecteau, S. Poirier

    "This paper focusses on new developments regarding thermal rock fragmentation applications. The technology consists of a strong burner powered by diesel fuel and air. The thermal reaction that is crea

    Jan 1, 2003

  • CIM
    The Star Lake Mill a Low Cost Success Story

    By Doug Smith, Ross MacFarlane

    "The Star Lake Mill was commissioned by Cameco (formerly Saskatchewan Mining Development Corporation) in 1986 to process a small high grade gold deposit in a remote location of Northern Saskatchewan.

    Jan 1, 1989

  • CIM
    Some Crushing and Grinding Considerations in Plant Design

    By H. A. Steane

    "This presentation will cover some crushing and grinding considerations in plant design and operation. There is nothing basically new in the subject matter presented here; however, the viewpoint and i

    Jan 1, 1976

  • CIM
    Some Current Ideas on Saving Energy in Milling Operations

    By I. R. Ward

    "The need for energy conservation has been of increasing concern since the early 1970's, when the cost of petroleum based energy began to escalate rapidly and security of supply became uncertain. The

    Jan 1, 1981

  • CIM
    Quarrying and sustainable development in large urban centres: A contradiction in terms?

    By D. C. Kaliampakos, A. G. Benardos

    The existence of quarries near or even within the boundaries of urban centres is the cause of many environmental problems, despite their significant contribution to the cities’ development. Hence, the

    Jan 1, 2000

  • CIM
    Interactions between Slurry Density and Grinding Media Size

    By Claude Bazin, Patricia Obiang

    "The slurry density (pulp percentage of solids) and the size of the grinding media are often used for the optimization of an operating ball mill. In many cases a change of ball size is made at the slu

    Jan 1, 2007

  • CIM
    Rate Dependence of Flexural Tensile Strength of Laurentian Granite

    By F. Dai

    Due to difficulties associated with gripping in direct tension, indirect methods are commonly used to measure rock tensile strength. In this work, we adopt an innovative indirect tensile test method:

    May 1, 2009

  • CIM
    Application at Ok Tedi Mining of a Neural Network Model within the Expert System for SAG Mill Control

    By Murray Wood, Michael Schaffer, Makat Katom

    "An expert system applied to the control of mineral process unit operations is, by its nature, the site best operating practice, having been designed by the local experts in conjunction with consultin

    Jan 1, 2003

  • CIM
    Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper Concentrator

    By M. Massinaei, S. Abasi, M. Oliazadeh

    Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o

    Jan 1, 2019

  • CIM
    Regulation and the Regulatory Process in the Mineral Industry

    By F. C. Lendrum

    "This paper had its origin in a panel discussion organized by the Canadian Uranium Producers Metallurgical Committee (CUPMC) at their Annual Meeting in Blind River in May, 1964. The reason for the pan

    Jan 1, 1986

  • CIM
    Triboelectric Belt Separator for Beneficiation of Fine Minerals (9aecc8ca-7bc0-41bc-8b15-775052b522c2)

    By James D. Bittner

    Separation Technologies, LLC (ST) has developed a processing system based on triboelectric charging and electrostatic separation that provides the mineral processing industry a means to beneficiate fi

    Nov 1, 2011