Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Practical Application of Geological Modelling Techniques to Gold Orebody Evaluation and Mine Planning

    By Duke J. H

    Advanced computer aided geological modelling techniques are now available to the geologist to allow the rapid evaluation of a gold orebody at various stages of its development. The types of grade

    Jan 1, 1989

  • AUSIMM
    Diversification - The Implication for Safety

    Diversification has characterised the mining industry in this country and globally in recent decades, and in Western Australia in particular. One of the most obvious aspects of diversification is tec

    Jan 1, 1996

  • AUSIMM
    Primary Ore Milling at Pan Australian Mining Ltd Mt Leyshon Mine

    Pan Australian Mining lid installed a milling and gold leaching plant designed to process 2 million tonnes per annum of breccia sulphide ore. This plant was commissioned in January 1989. Since commi

    Jan 1, 1991

  • AUSIMM
    Experimental Study of Computer Stimulation of Bench Blasting in Production Scale

    Production scale experiment study was carried out in a limestone open-pit for testing the theory and method proposed by the author(Zou, 1987). The results of experiments indicate that the mathematica

    Jan 1, 1990

  • AUSIMM
    The Assessment and Management of Coal Recovery in Open Pit Mines

    Scheduling the transformation of in situ coal to run of mine coal and its subsequent beneficiation to a saleable product involves the use of many `parameters' or `adjustment factors'. Thes

    Jan 1, 1998

  • AUSIMM
    Upgrade Ability and Geology of Cawse Nickel Ore

    By C G. Ferguson, S L. Makin

    The Cawse nickel project is a new generation pressure acid leach (PAL), solvent extraction and electrowinning process used to produce LME grade nickel metal and cobalt sulphide concentrate containing

    Jan 1, 2000

  • AUSIMM
    Improvements in Stoping Methods at Mount Isa Mines Limited

    By Mathews K. E, Willstead T. V C

    Initial glory holing was followed by sublevel stoping, with a small proportion of total production mined by shrink and cut-and-fill methods.The sublevel stoping method was successfully modified to cat

    Jan 1, 1961

  • AUSIMM
    Some Practical Uses of Non-Linear Programming in Mine Planning

    By Beeforth C. G

    The use of Non-Linear Programming to obtain improved schedules of future activity in two specific cases of mining and treatment of minerals is described. The two cases were (i) reclamation of gold,

    Jan 1, 1977

  • AUSIMM
    The Peak Hill High Sulphidation Gold Deposit, NSW (b7de7a3e-9b00-482f-8de6-d6281ddb9569)

    By Corbett GJ, Leach TM

    ABSTRAC'T' Although hosted within an Ordovician magmatic arc, the Peak Hill high sulphidation system displays features typical of younger Pacific Rim high sulphidation epithermal gold depos

    Jan 1, 1995

  • AUSIMM
    Meeting Mine Productivity Requirements with Dry Drilling

    This paper investigates dry drilling as a feasible alternative to meet current requirements for improvements in mining productivity in an increasingly competitive world.A field test program was conduc

    Jan 1, 1991

  • AUSIMM
    Geostatistical Evaluation of A Beach Sand Rutile Deposit

    This study begins with the semivario- gram modelling of variables rutile grade and clay content from a beach sand rutile deposit. This is followed by two dimensional block kriging. The deposit was

    Jan 1, 1986

  • AUSIMM
    Roll Production at the Steel Foundry B.H.P., Newcastle

    The facilities used and techniques employed in the manufacture of steel and iron rolls at the Steel Foundry, B.H.P., Iron & Steel Works, Newcastle are described.

    Jan 1, 1972

  • AUSIMM
    Sedimentological Evaluation of Placer Deposits

    Measurable physical characteristics of placer deposits include both fluvial sedimentological features and their related heavy mineral suite. These two important identifiable factors are interrelat

    Jan 1, 1986

  • AUSIMM
    Monolithic Partitions for the Wide Drivages - Some Design Considerations

    The paper examines the possibility of applying the monolithic packing technique developed in the UK to the division of wide development drivages in Australia, so enabling double entries for longwal

    Jan 1, 1986

  • AUSIMM
    Our Threatened Coal Resources

    A major factor in the economic development of New South Wales has been the ready availability of coal for the major industrial and urban centres of Sydney, Newcastle and Wollongong. Historically, th

    Jan 1, 1995

  • AUSIMM
    Investigation of Minerals and Iron Oxide Alterations in Olivine Pellets Excavated from the LKAB Experimental Blast Furnace

    By A Benedictus, A Butcher, J Wikstr÷m, B Lindblom, E Rutqvist

    LKAB is a mining company situated in northern Scandinavia, manufacturing blast furnace- and direct-reduction pellets and sinter fines. Pellet development at LKAB comprises testing at laboratory and pi

    Jan 1, 2008

  • AUSIMM
    Parameters in Rotary Drill Bit Life at Elura Mine, N.S.W.

    A paper presenting the results of studies carried out on rotary drill bit life at EluraMine N.S.W.Contributing parameters, including dataon drill operation and geology are compared to the performance

    Jan 1, 1985

  • AUSIMM
    The Application of Blasthole Diamond Drillng as a Stoping Method at Big Bell Mine, Western Australia

    The purpose of this paper is to present a detailed account of the development of the Blasthole Diamond Drilling method of stoping now used at the property of Big Bell Mines Limited, in Western Austral

    Jan 1, 1948

  • AUSIMM
    South Comet Mine

    The South Comet mine is an underground silver-lead-zinc mine located on the West Coast of Tasmania with an annual production in the order of 35 000 tonne per year. All ore mined is shipped to the Rose

    Jan 1, 1993

  • AUSIMM
    An Integrated Optimisation Study of the Barrick Osborne Concentrator: Part B - Flotation

    By T Gibbons, M Korte, C Brent, K Runge

    The Barrick Osborne concentrator has gone through a number of upgrades since commissioning and steadily increased production from the original 119 t/h design capacity to 265 t/h milling throughput in

    Jan 1, 2009