Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Orepass Monitoring and Management at Olympic Dam Mine

    By J Rose, D O’Toole, D Grant

    Orepasses are a critical element in the transport of ore from the stope drawpoint to the surface ore stockpile, making them an integral part of an underground mine’s ore-handling system. Well-designed

    May 9, 2016

  • AUSIMM
    Gas Evolution Trends for Coal from Two Different Areas at Clarence Colliery

    By J Sargeant, T Levi, J Theiler, B Beamish

    Two coal samples (810 Panel and Area 900) collected from Clarence Colliery have been tested under a controlled heating procedure to evaluate the gas evolution trends corresponding to increasing temper

    Aug 31, 2015

  • AUSIMM
    Geostatistics and Sample Numbers from an Acid and Metalliferous Drainage Perspective

    By C Linklater, A Garvie, D Kentwell

    Various Australian and international regulatory bodies (Environmental Protection Authority, 2015) require an early assessment of the geochemistry of waste rock. This usually includes estimates of the

    Jun 28, 2016

  • AUSIMM
    Jacked Box Versus Cut and Cover Technique for the Pedestrian Underpass Construction in Brisbane

    By A Purwodihardjo

    Evaluation of the construction method used for the pedestrian underpass construction at Ipswich Road, Brisbane, Australia is presented in this paper. The pedestrian underpass was constructed through t

    Mar 8, 2011

  • AUSIMM
    Will Your Mine Require Cooling?

    By A S. Derrington

    In some parts of Australia, mine air cooling may not be needed until a depth of 1300 m below surface is reached. In other locations, it may be essential at a depth of only 300 m below surface. The rea

    Mar 24, 2014

  • AUSIMM
    Mining automation human-systems integration – CMOC-Northparkes case study

    By J Cronin, R Burgess-Limerick, T Horberry, L Steiner

    "Automation offers the mining industry great potential for improvements in productivity and safety. However, the experience of introducing automation in other industries has been that the full potenti

    Oct 16, 2017

  • AUSIMM
    Developing the West Pilbara Iron Ore Project

    By K Watters

    API Management Pty Ltd (API) is currently developing the West Pilbara Iron Project (the ‘Project’). The Project is a substantial greenfi elds mining and infrastructure development proposed for the wes

    Jul 11, 2011

  • AUSIMM
    Improved mining recovery with bulk ore sorting and MR technology

    By C Beal, S Singh

    Sensor-based bulk ore sorting is a form of preconcentration that autonomously measures and physically separates discrete bulk ‘pods’ of run of mine (‘ROM’) or primary crushed material. This case study

    Nov 10, 2020

  • AUSIMM
    Processing of Pisolitic Iron Ore at Mesa J

    Robe River Iron Associates (RRIA or Robe) is widely regarded as the worldÆs most cost-effective, consistent and reliable supplier of iron ore. It has been in operation since 1972 and globally is the f

    Jan 1, 2000

  • AUSIMM
    How the Global Experience and Reach of Tunnelling’s True Multinationals Helped Solve a Road Tunnel Fit-out Challenge

    By S Strong, L I. Sanz Vivanco, T Brown

    One of the most significant technical and practical challenges facing the tunnel construction team on the Legacy Way road tunnel project in Brisbane, Australia was how to erect the prestressed precast

    Sep 17, 2014

  • AUSIMM
    Nature and Distribution of Gibbsite in Some Western Australian Iron Ores

    By M Paine

    Work to date has shown that the use of Al2O3:SiO2 ratios is suitable for identifying potential gibbsite bearing samples. Subsequent confirmatory XRD analysis helps to refi ne this initial identificati

    Jul 11, 2011

  • AUSIMM
    Draw Control Optimisation along the Production Drift in Sublevel Caving Mines

    By A Gustafson, G Shekhar, P Boeg-Jensen

    The amount of material extracted from each blasted ring in sublevel caving mines is vital when deciding the overall mine production target. The orientation of the production drifts is normally perpend

    May 9, 2016

  • AUSIMM
    Blasting Harmonics and Controlling Peak Particle Velocity

    By T J. Laing, A B. Richards, A J. Moore

    Blastholes fired in a pattern with a constant initiation delay create a frequency in the ground vibration similar to that from a percussion instrument, such as a drum, in the air. A constant firing de

    Aug 24, 2015

  • AUSIMM
    Improving crusher throughput using a problematic ore index based on simple, first principles geology

    By T Walton, C Perring, M Pepper, G Gerber

    The Yandicoogina Channel Iron Deposit (CID) is an accumulation of iron pisolites cemented by a goethite-rich matrix. The Yandicoogina CID’s are found in a palaeochannel that meanders within a broad st

    Mar 22, 2022

  • AUSIMM
    Beneficiation Studies on Alumina-Rich Indian Iron Ore Slimes Using Selective Dispersants, Flocculants and Flotation Collectors

    By Khosia NK, Ravishankar SA, Sankar TAP

    Alumina reduction in Rajhara iron ore slimes essentially involves separation of hematite from gibbsite in relatively coarser fraction and from kaolinite in the finer fraction. Selective dispersion f

    Jan 1, 1993

  • AUSIMM
    Some New Concepts in Dry Beneficiation Possibilities for Iron Ores

    By D Henderson, M Germain

    The beneficiation of iron ore deposits to yield haematite and magnetite concentrates for steel making processes typically require the use of one or a combination of wet processing techniques based on

    Jan 1, 2009

  • AUSIMM
    An innovative application of LJC Automatic Magnetic Flotation Separator in magnetite processing

    By L Ding, B Xu, C Wang

    In this paper, we introduce the term ‘LJC’ to refer to the LJC Automatic Magnetic Flotation Separator, which is an advanced technology developed by Longi Magnet, integrating various techniques such as

    Sep 18, 2023

  • AUSIMM
    Journey to the Edge of the Basin - Stratigraphic Setting and Iron Mineralisation at the Davidson Creek and Robertson Range Projects, Hamersley Province,Western Australia

    By R McCarthy, P Hawke

    FerrAus Ltd's Robertson Range and Davidson Creek Projects are located in the Hamersley Province about 100 km east of Newman, Western Australia. Significant iron mineralisation defined by an aggre

    Jan 1, 2009

  • AUSIMM
    Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper Operations

    By G Chitumbura

    Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu

    Mar 21, 2011

  • AUSIMM
    Lower Lea Valley Cable Tunnels - A Case Study of a Program Critical Project

    The purpose of the Lower Lea Valley Cable Tunnel project is to relocate the overhead power lines circuits, which currently cross the proposed site for the 2012 London Olympics in East London. This was

    Jan 1, 2008