Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Metallurgical Performance of Outotec’s e500 TankCell® at the Kevitsa Cu-Ni-PGE Concentrator

    By B Murphy, T Mattsson, R Crosbie, T Maksimainen

    "An Outotec e500 TankCell, with 500 m³ of actual flotation volume, was commissioned at the Kevitsa Cu-Ni-PGE concentrator in northern Finland during 2014. This flotation cell was implemented at t

    Oct 10, 2016

  • AUSIMM
    Do We Maximise the Value of Our Operations through Our Definition Drilling, Resource Estimation and Mine Planning Strategies?

    By S O’Connell, M Scholz, A Robertson, M L. Bloss

    The value created in any mining operation is a function of the mine plan. The quality of this plan is dependent on the strategies employed during definition drilling, resource estimation and mine plan

    Jun 22, 2016

  • AUSIMM
    Synergies between renewable-powered mines and community development programs throughout mine life cycle and post-closure

    By J Joughin, D Kyan, L Rollin

    In line with the 2015 Paris Agreement and corresponding climate disclosure requirements, many mining companies have publicly disclosed that they are developing and/or implementing ambitious decarbonis

    Aug 2, 2023

  • AUSIMM
    Waste Rock Pile Construction to Lower Closure and Relinquishment Costs

    By J R. Taylor, J A. Muchan, S M. Pape, B S. Davis

    Acid and metalliferous drainage (AMD) is routinely derived from waste rock, tailings, pit wall rock, underground mine voids, heap leach pads, ore stockpiles, concentrate stockpiles and even slag piles

    Jun 28, 2016

  • AUSIMM
    Characterising coalmine roof using measurement-while-drilling technology

    By M Khanal, J Qin, B Shen, Y Duan, X Luo

    Gaining confidence in interpreting rock and strata properties of the coalmine roof is necessary for design, maintenance, modelling and optimisation of roadways supports. One of the key causes of roadw

    Nov 29, 2022

  • AUSIMM
    Enhancing the fairness in LoRa-Based linear wireless mesh networks in underground mining

    By A Seneviratne, Y Li, N Udugampola, X Ai, B Li

    LoRa (Long Range) is a low-power, long-range wireless communication technology that has gained significant research interest for its potential use in multi-hop linear wireless sensor networks (LWSNs)

    Sep 1, 2024

  • AUSIMM
    Geotechnical Models and Data Confidence in Mining Geotechnical Design

    By M J. Dunn

    The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l

    Nov 5, 2014

  • AUSIMM
    Mine reconciliation standardisation – R Factor Series

    By R Hargreaves, T Elkington, W J. Shaw, G W. Booth

    Every day, around the world, thousands of tons of ore are loaded onto ships completing the miningproduction process and starting a multimillion-dollar economic transactions process. These transactions

    Mar 22, 2022

  • AUSIMM
    Higher Energy Bulk Explosives – Matching Products to Rock Types Using an Energy Map Concept

    By S Thomson, G Rigby, J Norgard, D Wilkinson

    Bulk explosives provide the energy to move a rock mass and reduce it to an optimal size (fragmentation). The intensity of energy needed depends on several factors including a customer’s geology and en

    Aug 24, 2015

  • AUSIMM
    Improving cobalt extraction through oxidative blowing of copper-nickel matte

    By R A. Pakhomov, L V. Krupnov, P V. Malakhov, I M. Dymov

    The article presents results of thermodynamic calculations and laboratory studies, focusing on the cobalt behaviour during oxidative smelting of copper-nickel mattes. The compositions of the studied s

    Aug 21, 2024

  • AUSIMM
    The challenges of the reuse of tailings and overburden

    By E M. Gama, L Resende

    The tailings are waste from mineral processing operations. The type of tailings of iron ore processing are classified into sandy tailings and mud. Already the overburden are showing significant levels

    Jul 23, 2018

  • AUSIMM
    A Holistic Approach to Managing Blast Outcomes

    By D Genge, E Martin, T Goswami, M Rothery

    Rio Tinto’s Hunter Valley Operations is a large open pit coalmine situated in the heart of the Hunter Valley in Australia. The Riverview West Pit has faced increasing production challenges in recent t

    Aug 24, 2015

  • AUSIMM
    A New Approach to Metallurgical Accounting

    By S Brochot, M-V Durance

    In many cases, current metallurgical accounting practice does not consider the errors associated with the measurements used in obtaining the metal balance. Considering all measurement errors, includin

    Oct 29, 2012

  • AUSIMM
    Shamrock Gold Mine Gets into Production

    The Shamrock Gold Mine has been brought from exploration to production within three years. Mining of the openpit is scheduled for June 1990 with commissioning in April of the 180 000 TPA carbon-in-pul

    Jan 1, 1990

  • AUSIMM
    Geometallurgy Data Management – A Significant Consideration

    By V Liebezeit

    Data management is a significant, but perhaps unrecognised, consideration for any organisation embarking on a geometallurgy program. While resource geologists are accustomed to dealing with thousands

    Sep 5, 2011

  • AUSIMM
    Geometallurgical Modelling and Ore Tracking at Kittilä Mine

    By M Wortley, J Korteniemi, D La Rosa, L Rajavuori

    Geometallurgical modelling of an orebody provides benefits to a mine by gaining a better understanding of the ore characteristics and how they affect the performance of the concentrator. With this kno

    Nov 24, 2014

  • AUSIMM
    Remodelling the Purnama Deposit – An Interpretation Case Study from G-Resources Martabe Project, Indonesia

    By A N. Kusnanto, D Sims, L Henim, S Crispin, J Hertrijana

    The high sulfidation Purnama Au-Ag deposit located on the Indonesian island of Sumatra entered production in mid-2012 following a two-year program of construction and development. Discovered in 1997 f

    Aug 18, 2014

  • AUSIMM
    Using a Coal Mine Safety Regime Approach to the Management of High-Voltage Electrical Isolation

    By J Joy, D Griffiths, A Bye, G V. Kizil

    Poor standards of electrical installation and maintenance continue to contribute to electrical related fatalities and injury risk in the mining industry. Electrical isolation has the potential to init

    Nov 20, 2012

  • AUSIMM
    Geological Modelling and Bench Face Survey to Improve Blasting Fragmentation

    By E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos

    Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio

    Aug 24, 2015

  • AUSIMM
    Optimising the operation of paste thickening at the Yara Siilinjärvi Plant

    By E Ruhanen, S Kauvosaari, M Kosonen, C Meintjes

    The Yara Siilinjärvi plant is located in the central part of Finland. Siilinjärvi is Western Europe's only apatite mine and annually it produces 1 Mt of apatite concentrate, which create

    Aug 29, 2018