Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Heavy Medium Separation at Iscor's Sishen Iron-Ore-Mine

    The Sishen iron-ore-mine produces 3 pro= ducts with size gradings of 25 to 8 mm, 11 to 5 mm and 5 to 0,2 mm and has a product capacity of 20 Mtpa. Ore is produced at an average Fe content of 66,2

    Jan 1, 1987

  • AUSIMM
    The Devonian-Carboniferous Intracratonic Burdekin Basin, North Queensland: I. Carbonate-Siliciclastic Facies of the Fanning River Group

    By Zhen Y. Y, Cook A, Jell J. S, Fleming P. J G

    Remapping of the Burdekin Basin has resulted in subdivision of the three interfingering basin-wide megafacies previously recognised in the Early to Middle Devonian Fanning River Group. Eleven carbonat

    Jan 1, 1990

  • AUSIMM
    Decision Support for an Underground Gold Mining Operation - A Case Study using the Schedule Optimisation Tool

    By B Maybee, L Fava, D Millar

    In the context of a case study for an underground gold mine, the value generated by a schedule optimisation tool (SOT) is assessed. SOT is a software tool for underground mine planning that maximises

    May 24, 2012

  • AUSIMM
    Development of a damage/failure mechanisms database for Kazakhstan underground mining industry

    By A Mortazavi, M Akhmedya

    Mining is recognised as being one of the most dangerous industries in the world due to the difficult working conditions. Working in such hazardous circumstances in an underground mine often results in

    Nov 29, 2022

  • AUSIMM
    Spoil Pile Erosion Prediction - How Far Have We Advanced?

    By Aspinall T. O, Loch R. J, Bell L. C

    Design of reshaped spoil surfaces is an important pan of rehabilitation of spoil piles resulting from open-cut coal mining. To achieve the optimum design, it is necessary to make accurate predictions

    Jan 1, 1992

  • AUSIMM
    The Petroleum Industry's Future Self-Sufficiency and Taxes- A Review

    The performance of the Australian Mining Industry over the past 10 years using key indicators of production, revenue, aftertax return investment, together with key cost elements, market changes and

    Jan 1, 1987

  • AUSIMM
    Managing floor heave in an underground longwall coal mine

    By P Corbett, P Sheffield

    Springvale Mine is an underground coal mine in the western coalfield of New South Wales which utilises retreat longwall mining technique. The mine encountered significant gateroad floor heave issues d

    Nov 30, 2018

  • AUSIMM
    Intersection traffic strategy of unmanned truck in open pit coalmines

    By B Y. Luan, Y Tian, W Zhou, X Lu, Q X. Cai

    The unmanned driving technology in open pit coalmines is an important technology that relies on innovation to drive the development of the open pit coal mining industry in China’s transformation of gr

    Sep 1, 2024

  • AUSIMM
    The Effectiveness of Interpanel Pillars in the Control of Surface Subsidence

    There exist many formulae for designing coal pillars. However, when applied to a given set of mining parameters, they lead to different pillar sizes and factors of safety. From the subsidence poin

    Jan 1, 1992

  • AUSIMM
    Development of rock testing system with changeable stiffness and test research on failure characteristics of rock

    By Y H. Zhu, X X. Tang, Y C. Yin, M L. Xing

    Based on the stiffness theory, the stiffness difference and energy supply of surrounding rocks are important inducing factors for strain burst. However, due to the lack of multi-level low stiffness te

    Nov 29, 2022

  • AUSIMM
    Kinetics of Impurity Removal from Steel for a Batch Process

    By Wright G. A

    The objective of refining in steelmaking is to reduce the concentration of impurity atoms, e.g. sulphur, phosphorus, from an initially high level to a specified low concentration. A two-film theory

    Jan 1, 1980

  • AUSIMM
    Geology of the Esperanza Copper Deposit

    By Moy A. D

    The Esperanza deposit is located 120 kin N of Mount Isa, Queensland at approximately lat 19¦20'S, long 139¦22'E on the Camooweal (SE 54-13) 1:250 000 scale map sheet. It is one of several

    Jan 1, 1997

  • AUSIMM
    Which Way is the Wind Blowing Today? A Control Strategy Which Considers Meteorological Effects on Tunnel Ventilation

    By D J. Gray

    The 4 km long Huguenot Toll Tunnel in the Western Cape region of South Africa celebrated its tenth anniversary on 18 March 1998. At present a single (South) bore with bi-directional traffic flow is op

    Jan 1, 1999

  • AUSIMM
    Explosion in Mining

    HISTORIC SIGNIFICANCE OF EXPLOSIVES TO MINERAL PRODUCTION The ancient method of breaking rock was to build a wood fire against the face, heat the rock through and then pour water on the heated ore-

    Jan 1, 1988

  • AUSIMM
    The Physico-Chemical Basis of Pyrometallurgical Processes

    A critical appraisal of the wide variety of processes used in the pyrometallurgical production of metals and non-metals shows that there is a strong physico-chemical and, in particular thermodynam

    Jan 1, 1987

  • AUSIMM
    A Ventilation System for Large Block Cave Mines

    By M Stephens, T A. Sutra

    Currently, there are several open pit mines with production rates of about 200 000 tpd of ore that are reaching the end of their economic lives. In most cases, the remaining orebody extends to depths

    Jan 1, 2005

  • AUSIMM
    The Effect of Residence Time and Aeration on Coal Recovery Within the High Intensity Zone of a Flotation Machine

    By J A. Cowburn

    The high intensity zone within the Jameson Cell is the downcomer. It is largely external and separated from the flotation tank. This, together with operation of the downcomer under vacuum, rather than

    Jan 1, 2005

  • AUSIMM
    Monitoring of M10000 IsaMill™ Process Performance by Passive Acoustic Emissions

    By A McEwan, J Masters, C A. Jackson, A Catanzano, V Sharp, M Millen, S Rainey, S J. Spencer, G Roberts

    A passive acoustic emission (AE) monitoring system has been developed and trialled on two M10000 IsaMillsTM. The analyser detects AE stress waves generated by grinding media impacts with the mill line

    Sep 1, 2014

  • AUSIMM
    Low-Grade Concentrator Regrind Circuit Upgrade at NewcrestÆs Cadia Valley Operations

    By B Clements, R Dunne, J Dioses, S Hart

    In April 2003 plant upgrades in the æLow GradeÆ Cadia Hill circuit were undertaken in order to improve concentrate quality and metal recoveries from the flotation circuit. The major changes involved:

    Jan 1, 2005

  • AUSIMM
    Orepass Level Measurement

    Level measurement of underground orepasses is important. Orepasses are not only utilised to funnel ore to the shaft skip loading station but also as silos for storing of ore in order to smooth out ore

    Jan 1, 2005