  • AUSIMM
    Application of Atomic Absorption Specthophotometry

    In Mount Isa voltage and frequency fluctuations caused. by haulage shaft operation gave considerable difficulties with the initial application of Atomic Absorption Spectro-photometry.The methods used

    Jan 1, 1963

  • AUSIMM
    Biomass and Renewables as Alternative Energy Sources and Reductants in the Minerals Industry

    Minerals processing operations use a significant quantity of fossil carbon to provide energy and as reductant. Greenhouse gas emissions from the use of this fossil carbon contribute to the global incr

    Jan 1, 2004

  • AUSIMM
    An Appraisal of Tunnelling in the Auckland Region for Infrastructure Development

    By J St George

    Much of AucklandÆs transport infrastructure has been developed on surface with little or no consideration of underground options. Current and planned transportation routes are now facing high costs du

    Jan 1, 2008

  • AUSIMM
    How are Indian mills changing their feedstock in order to address decarbonisation goals?

    By D Goel

    India, the second-largest steel manufacturer globally, achieved crude steel production of around 126 million tonnes (Mt) in the last financial year of April 2022 to March 2023 (FY23), against an insta

    Sep 18, 2023

  • AUSIMM
    A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction Activities

    By D Davis

    The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi

    Mar 8, 2011

  • AUSIMM
    The development of DRI pellets for green steelmaking

    By C R. Ure

    To substantially reduce, if not eliminate, carbon dioxide (CO₂) emissions from ironmaking it is necessary to convert from blast furnace (BF) ironmaking using coking coal as the reductant to direct r

    Sep 18, 2023

  • AUSIMM
    Nova copper-nickel project optimisation of the copper rougher-scavenger circuit through advanced measurement and control

    By M Thompson, N Vines, Z Hearne, S Lam, G A. Gomes-Sebastiaõ, D van der Spuy

    Construction and commissioning of the Nova Copper-Nickel project of Independence Group was completed in late 2016. The plant is in the Fraser Range of Western Australia, about 120km east of Norseman a

    Aug 29, 2018

  • AUSIMM
    Petrochemical Variations of Island Arc's Andesites (Kurile Island Arc)

    The problem of comparison of island arc's andesites in terms of petrochemical data is exa- mined. It is definitely established that only two main factors exist controlling the petroche- mical v

    Jan 1, 1987

  • AUSIMM
    In-Pit Crushing and Conveying

    By I Lourel

    In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t

    Jan 1, 2009

  • AUSIMM
    Automated Production Data Collection and Reporting at a Large Open Pit Mine

    By T Mattiske

    The Fimiston Open Pit (commonly referred to as the æSuper PitÆ) is a part of the Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) operation in Kalgoorlie-Boulder. KCGM manages the Fimiston Open Pit,

    Jan 1, 2002

  • AUSIMM
    Significance of Latent Energy in Hydraulic Slags to the Cement and Concrete Industry

    Blast furnace slags which fall into the quaternary system SiO2 - A1203 - MgO - CaO have latent hydraulic properties which depend on the degree of vitrification. When the oxides com- bine to form Ca

    Jan 1, 1979

  • AUSIMM
    Monorail Technology - A Rapid and Cost-Effective Method of Decline Development

    By B Besa

    Australia is a world leader in the design and operation of mines accessed by the decline method. Literature indicates that a number of metalliferous underground mines using the decline system are also

    Jan 1, 2008

  • AUSIMM
    Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushers

    By J V. Mehrabani, A R. Sayadi

    Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul

    Sep 26, 2011

  • AUSIMM
    Continuity Risk in Narrow Reef Gold Deposits - Implications for Evaluation and Exploitation

    By I M. Platten

    Narrow reef gold deposits are generally less than 4 m in width and relatively complex geological phenomena. They often display variable geometry, attitude, continuity and internal architecture. Econom

    Jan 1, 2008

  • AUSIMM
    Recovery and Removal of Uranium by Using Biosubstances

    By Nakajima A

    Some attempts were made to recover uranium from aqueous systems by using various biosubstances including microbial biomass. Of hundreds species of microorganisms tested, extremely high uranium absor

    Jan 1, 1993

  • AUSIMM
    Opening Occupational Health and Safety Opportunities for Underground Mining Companies by Closing the Knowledge Application Gap

    By Else D

    While the underground mining work environment may have processes and equipment considered unique, most of the broad issues likely to affect the occupational health and safety of employees are not. One

    Jan 1, 1992

  • AUSIMM
    Rehabilitation of the Ardlethan Tin N.L. Concentrator

    The Ardlethan tin concentrator had dete riorated considerably in metallurgical per- formance, maintenance and plant availability. This problem was compounded by low tin prices and International Tin

    Jan 1, 1978

  • AUSIMM
    Yesterday's Tailings are Tomorrow's Resource - Rehabilitation of Stilfontein Gold Mine for Profit

    Stilfontein Gold Mine, located approximately 160 km west of Johannesburg, produced both gold and uranium from 1952 through to the early 1990s. On decommissioning the mine infrastructure, treatment pla

    Jun 1, 2010

  • AUSIMM
    High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, Philippines

    By C Harrison, A Bowskill

    The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to

    Sep 17, 2014

  • AUSIMM
    Assessment of Rock Slope Stability Using the Rock Mass Rating (RMR) System

    The Rock Mass Rating (RMR) and Rock Mass Strength (RMS) classification systems for jointed rock masses are briefly reviewed, with particular reference to their use in slope stability studies. A correl

    Jan 1, 1992