Cobalt, copper tailings and the circular economy – a case study from the Capricorn Copper Mine, north-west Queensland minerals provinceBy L Nicholls, A Parbhakar-Fox
Reprocessing Queensland’s historical copper tailings for critical minerals is an opportunity to circularise the state’s mining industry by converting waste liabilities into assets. Mine waste valorisa
Aug 2, 2023
-
Milling Practice at Emperor Combined MillThe primary object of this paper is to describe the present metallurgical practice of the Emperor Combined Mill, wherein ores from the adjoining and Associated Mining Companies, Emperor Gold Mining Co
Jan 1, 1953
-
Mineral Taxation Policies and Practices Around the Pacific RimThis paper examines some of the important aspects of mineral taxation policies and practices, with reference to the mining tax regimes of selected Pacific Rim countries (see Tables 1 and 2). The follo
Jan 1, 1999
-
The Evolution of Wall Control Programs at Kidston Gold MinesBy A Marton
Concerns with crest losses have seen changes to a number of design and operating parameters to retain the integrity of the wall and the berms of the Kidston Gold MinesÆ Eldridge Pit. Until trials bega
Jan 1, 2001
-
Mine Planning and Geotechnical Considerations in the Development of the Western Baters of Yallourn Open Cut MineBy Tilley H. L
The 90 m deep Yallourn Open Cut brown coal mine in the Latrobe Valley, Victoria is developing into an area close to a reverse fault. A major batter stabilisation program, matched to ongoing operatio
Jan 1, 1989
-
Automation of the Kimberley Nickel Mine Flotation Operation Using an Advanced Control SystemBy J Knoblauch, D, P J. J Strobos, C Foggo
The Sally Malay Project is located 120 km north of Halls Creek in the eastern Kimberley region. Since commissioning, ongoing improvements on the plant have resulted in recoveries now greatly exceeding
Jan 1, 2006
-
Flotation Process Response of Ok Tedi Flourine Bearing MineralsBy Manlapig EV, Mackinnon IDR, Laudr DW
Orebodies at Ok Tedi contain a number of different fluorine bearing minerals. Some of these minerals report to concentrate and are responsible for the presence of the penalty element, fluorine, wit
Jan 1, 1997
-
Flotation Mechanism Design for Improved Metallurgical and Energy PerformanceBy R Coleman
The flotation mechanism plays a key role in the flotation process. It is used to provide the contact between solid particles and bubbles and also the energy for these particles and bubbles to attach.
Aug 8, 2011
-
Linking safety factor to probability of failureBy S M. Gover
Estimating the probability of failure for embankments is not intuitive. It requires not only an appreciation of the strength of the embankment, but an understanding of the variability and uncertainty
Jul 23, 2018
-
Tracking Coal Fragmentation from Pit Face to Plant FeedBy Thornton D, Firth B, Kojovic T, Brien G, O&apos
Coal fragmentation is a function of coal type and mining process. Each unit step in the mining, handling and crushing chain of coal imparts energy to the material and impacts on size degradation and
Jan 1, 1998
-
The Application of Value Engineering Principles to Mining StudiesBy T Schrimpf, I Bryan
The life cycle of a mining project begins with initial regional exploration and ends with mine closure and rehabilitation. Between resource definition and the commencement of mine construction is the
May 24, 2012
-
Cooling Pathways for Deep Australian Longwall Coal Mines of the FutureBy B Belle, M Biffi
Cooling of coal mines in the Bowen Basin, characterised by steep geothermal gradient, is presently achieved mostly through rental surface bulk air cooling in summer months. This paper argues that futu
Jul 1, 2013
-
Whittle Programmings's Present and Future Tools for the Strategic Planning of MinesThe author reviews design evaluation theory and existing optinustion tools and then describes how these have guided recent developments in Whittle Programming's strategic mine design package: F
Jan 1, 1998
-
Reducing the Cost of Tunnel Design in AustraliaBy B Rouvray, R Bertuzzi
The development of a design-and-construct tunnelling project in Australia from its concept to its construction requires designs to be prepared and reviewed at several distinct stages prior to document
Sep 17, 2014
-
Real Option Value OptimisationBy J Gould, T Elkington
Mine operation strategies are commonly optimised with a net present value (NPV) maximisation objective. There are well known properties of a typical mining project optimised for NPV, including high pr
May 24, 2012
-
Observations on the Behaviour of a Gold Tailings with Hypersaline Pore FluidBy D Reid
Characterisation of non-plastic segregating tailings presents a number of challenges: the material cannot typically be sampled in an undisturbed state, remoulded samples exhibit different behaviour to
Jul 27, 2015
-
Maximising the value of a drilling program – case study in a challenging environmentBy A A. Latscha, D O’Connor
Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO
May 24, 2023
-
Vibration Reduction to Presere the Integrity of an Aboriginal Rock Shelter Near Blast OperationsBy D P. Blair
Rio Tinto’s Hope Downs Operations are currently mining iron ore in their South Central Pit. Prior to the commencement of mine operations, Hope Downs carried out an extensive archaeological investigati
Nov 8, 2011
-
Characterisation of Long-Term Scaling Effects of Ceramic Filter Media Used in the Dewatering of Iron OreBy R Salmimies
Choosing a ceramic capillary action filter is often favoured in processes where low energy consumption is important, such as the dewatering of iron ore. In addition, the performance of the filter medi
Jul 11, 2011
-
Starting the Journey – Launching of the Legacy Way Open Face Tunnel Boring Machines in Mixed Face Ground ConditionsBy M Norbert, D O’Connor
The mainline running tunnels for Legacy Way comprise two tunnel boring machine (TBM) driven tunnels. Both TBM drives commenced at the Launch Portal adjacent the Mt Coot-tha Road. Excessive surface set
Sep 17, 2014