Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rheological Investigation of the Flotation Performance of a High Clay Containing Gold Ore from Carlin Trend

    By D Bradshaw, R Dunne, S Farrokhpay

    It is well known that clays affect the flotation performance, and many of the refractory gold ores around the world contain clay minerals. Therefore, an ore sample from the Carlin Trend was selected f

    Sep 26, 2013

  • AUSIMM
    Application of Simulation Models to Port Planning and Management

    By Mahoney BK

    The development of simulation models to reflect accurately the operations of a port and its associated transportation systems can be an expensive and time consuming process. However the complexity

    Jan 1, 1983

  • AUSIMM
    A geometallurgical approach towards the correlation between rock type mineralogy and grindability – a case study in the Aitik mine, Sweden

    By R Schmitt, Y Ghorbani, I McElroy, N J. Bolin, M Parian

    Aitik is a large copper porphyry type deposit located in northern Sweden, currently exploited at an annual rate of approximately 45 Mt. The ore’s exceptionally low head grade of 0.25 per cent Cu and v

    Aug 24, 2022

  • AUSIMM
    Formation of <i>O,OÆ</i>-Di-Alkyl-Dithiophosphate Copper(I) Complexes on the Surface of Synthetic Chalcocite ù NMR and SEM Studies

    By O N. Antzutkin, W Forsling, K J. Pike an

    The adsorption mechanism of three different O,OÆ-di-alkyl-dithiophosphate (dtp) collectors, K[S2P(OR)2] with R = Et, i-Bu and i-Amyl, on the surface of synthetic chalcocite (Cu2S) was studied by means

    Jan 1, 2005

  • AUSIMM
    The Use of High-Water Rapid-Solidifying Material as Backfill Binder and its Application in Metal Mines (81971fc4-4a86-4ab3-9271-1e5b157046a8)

    By Yucheng H, Baogui Y, Wenyong L

    High-water rapid-solidifying material, called &apos;high-water material&apos;, is a new material developed by the authors over many years. The material can solidify nine times its volume of water in

    Jan 1, 1998

  • AUSIMM
    Improving the Recovery of Coarse Coal Particles in a Jameson Cell

    By G J. Harbort, Z Pokra

    It has been observed in several Jameson cell installations where the source for flotation feed is deslime screens, that the recovery of coal particles greater than 0.5 m is not as great as that of fin

    Jan 1, 2005

  • AUSIMM
    Water Footprint for a South African Platinum Mine

    By K G. Harding, E L. Haggard, C M. Sheridan

    Mining is a water intensive sector, contributing to declining water resource quality around the world. Improvements to current mine water management practices can help reduce the amount of water utili

    Nov 26, 2013

  • AUSIMM
    U-Th Isotopes and the Generation of Magmas Along Destructive Plate Margins (bcde6e5e-471a-49e7-b99d-94310e26f3e6)

    By Heath E, van Calsteren P, Turner S, McDermott F

    U-Th isotope studies of recent volcanic rocks may be used to evaluate the depths and rates of melt generation beneath mid- ocean ridges and ocean islands. Island arc rocks exhibit a similar range in T

    Jan 1, 1995

  • AUSIMM
    Characteristics of the Roots of a Classic Copper-Gold Porphyry System - The Batu Hijau Copper-Gold Porphyry Deposit, Indonesia

    By J Arif, J Proffett

    Copper and gold mineralisation at Batu Hijau is directly related to quartz veining and wall rock alteration that developed in close spatial and temporal association with multiple tonalite porphyry int

    Jan 1, 2008

  • AUSIMM
    The application of secondary crushing at the Jundee gold mine

    By S Tyrrell, B Jackson, K Matson

    Northern Star Resources Limited Jundee Gold Mine in Western Australia operates a comminution circuit that consists of a primary crusher, 3.85 MW semi-autogenous grinding (SAG) mill, 1.8 MW ball mill a

    Aug 29, 2018

  • AUSIMM
    New Tailings Dam at Ardlethan Tin N.L.

    In May 1977 a new dam was commissioned for disposal of 600,000 metric tonnes/year of tailings. Design basis, costs and construction problems are described. Problems arose, assoc- iated with lack of

    Jan 1, 1978

  • AUSIMM
    Northparkes Mines ù Design, Sudden Failure, Air-Blast and Hazard Management at the E26 Block Cave

    By A van As

    This paper serves to outline the circumstances and causes of the air-blast that occurred at Northparkes Mines in November 1999. It describes the design of the mine, the geotechnical issues surrounding

    Jan 1, 2005

  • AUSIMM
    A Statistical Approach for Deriving Project Design Rainfall

    By R Millar

    A frequent challenge in mine water management and mine design is estimation of precipitation and extreme rainfall given a short record of site meteorological data. For remote mine projects, typically

    Nov 26, 2013

  • AUSIMM
    Application of Fine Mesh Screens for Dust Suppression in Mine Transport Roadways

    By Todd S, Lam K, Hewitt A

    A series of field experiments investigated the perfonnance of fine mesh curtain screens which were used to suppress coal dust in a transport roadway of a New South Wales colliery. Four types of screen

    Jan 1, 1991

  • AUSIMM
    Preliminary Safety Analysis for the Connection of a Thermal Oxidiser to a Working Coal Mine

    By D Cork, R Peet

    "Methane is a signifi cant greenhouse gas. Methane is released from coal seams during the mining process, both in surface and underground operations. This uncontrolled release is termed æfugitive emis

    Jun 1, 2012

  • AUSIMM
    Effect of Flotation Feed Density on the Operation of a Flotation Cell

    By R Crosbie, K C. Runge, E Tabosa, J K. McMaster

    Flotation feed density is an operating parameter which is currently not well understood. Most models of flotation only incorporate its effect on particle residence time, but it is likely to have addit

    Oct 29, 2012

  • AUSIMM
    In-Situ Measurements of Near Surface Stress Fields Adjacent to Consuming Plate Boundaries

    By Enever JR

    In-situ rock stress measurements conducted in the Phillipines and on Bougainville have revealed stress fields significantly different from expectations based on intraplate experience. The results

    Jan 1, 1987

  • AUSIMM
    Development – Back to Basics

    By I T. Ross

    In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic

    Mar 24, 2014

  • AUSIMM
    Nuclear Magnetic Resonance Spectroscopy Studies of Mineral Surfaces ù Application in the Froth Flotation

    By O N. Antzutkin, A V. Ivanov, W Forsl

    Polycrystalline and surface complexes (at synthetic sphalerite, ZnS, and galena, PbS) of zinc(II) and lead(II) ions with eight different O,OÆ-dialkyldithiophosphate (Dtph) substances have been prepare

    Jan 1, 2005

  • AUSIMM
    Ausenco Carbon Reactivation Design Criteria

    By D Preedy, J K. Claflin, S R. J La Brooy

    This paper summarises the lessons learned during a recent carbon reactivation kiln upgrade project at the Sukari Gold Mine in Egypt. The kiln is being replaced to ensure that the plant achieves full v

    Sep 26, 2013