Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Application of Solvent Extraction to the Recovery of Uranium from El Sherana Ore

    Solvent extraction has recently been introduced into Australian hydrometallurgical practice for the production of a high grade uranium concentrate from El Sherana ore by a sulphuric acid leach and sol

    Jan 1, 1961

  • AUSIMM
    Solar Drying of Laterite Ores at QNI Yabulu Refinery

    This paper discusses the history and development of the system and the benefits that are being gained for Yabulu from Solar Drying. Following the end of mining of the local Greenvale and Brolga nickel

    Jan 1, 2003

  • AUSIMM
    The Macraes Gold Mine Implementation of a Zero Accident Programme

    The theme of this conference is æRediscover OtagoÆ and the conference occurs during a resurgence of economic activity in New Zealand, and in particular at a time when the Macraes Gold Project has had

    Jan 1, 1992

  • AUSIMM
    Setting and Origin of Miocene Giant Ore Deposits in the Central Andes

    By C Mpodozis

    Central Andean (22¦S to 34¦S latitude) Miocene giant ore deposits share common features that reveal their origin. Tectonic and magmatic features include a relation to a shallow subduction zone, an ass

    Jan 1, 1999

  • AUSIMM
    Resource Estimation Practice, Macraes Gold Project

    By M Stewart

    In January 1994, Macraes Mining Company started a new phase of exploration to find additional resources along strike and down dip of identified resources for a mill that was being expanded from 2.1 Mt

    Jan 1, 1997

  • AUSIMM
    Distinguishing Intrusion-Related from Orogenic Gold Systems

    By R J. Goldfarb

    Reduced intrusion-related gold deposits have become a new, low-grade, large-tonnage exploration target during the last decade. The best recognized examples of such deposits are recognized throughout t

    Jan 1, 2005

  • AUSIMM
    Development of the Ore Handling System at the Grasberg Block Cave Mine, Indonesia

    By H Firdausi, I Pasek, T Chenier

    The Grasberg Block Cave (GBC) Mine is one of the future underground mines of PT Freeport Indonesia (PTFI). Located in the remote highlands of Papua, Indonesia, the GBC mine is scheduled to start produ

    May 9, 2016

  • AUSIMM
    Hydrological Environments for Vein Mineralisation in the Hauraki Goldfield, New Zealand

    The epithermal Au-Ag deposits of the Hauraki Goldfield have formed in the convergent plate margin setting of the Coromandel Volcanic Zone (CVZ). The deposits form as siliceous lodes in the upper parts

    Jan 1, 1991

  • AUSIMM
    Holistic Approach to Study Gravity Flow at the Kiruna Sublevel Caving Mine

    By M Wimmer

    LKAB operates two underground iron ore mines located in the northern part of Sweden, both using sublevel caving (SLC) as the mining method. Knowledge of the mechanisms of gravity flow is important sin

    May 9, 2016

  • AUSIMM
    Innovative Technology for Optimised Thickening Sedimentation

    Innovative Technology for Optimised Thickening Sedimentation

    Sep 13, 2010

  • AUSIMM
    Mineral Composition of Sulphide Ores from the Peelwood, Cordillera and Mt. Costigan Mines, Peelwood District, N.S.W.

    The Peelwood district of New South Wales is located some 65 miles south of Bathutst on the Tuena-Crookwell road. A number of occurrences of lead-zinc-copper ore are known from this district but only t

    Jan 1, 1961

  • AUSIMM
    Increasing Grinding Circuit Robustness with Advanced Process Control

    By A Rantala, K Aberkrom, O Haavisto, P Blanz

    More complex ore bodies with lowering grades increase the challenges of maintaining high throughput, energy efficiency and required particle size for optimal downstream processing in grinding circuits

    Sep 7, 2015

  • AUSIMM
    Pressing-Drill Method - A Representative Method for Taking Analysis Samples from Recycled Materials

    Pressing-Drill Method - A Representative Method for Taking Analysis Samples from Recycled Materials

    Sep 13, 2010

  • AUSIMM
    Using airborne electromagnetics to solve a structurally complex geological puzzle in the Hamersley Province, Western Australia

    By J Bresnahan, D Kepert, R Murray, R Neroni

    Stratigraphy of the Hamersley Province in Western Australia, featuring alternating units of banded iron formations and shales with contrasting electrical properties in a mostly gently undulating shall

    Jul 24, 2017

  • AUSIMM
    Patterns of Quartz Veining in Rhyolitic and Andesitic Host Rocks at the Wharekirauponga, Neavesville and Ohui Epithermal Gold Deposits, Hauraki Goldfield

    By T Christie, A Swain

    Patterns of quartz veining in epithermal gold-silver deposits at Wharekirauponga, Neavesville and Ohui in the Hauraki Goldfield, have been analysed to determine the effects of different lithologies on

    Jan 1, 1994

  • AUSIMM
    Production of High-Quality DR Grade Pellets at IMEXSA

    By Arndt C. R

    The Ispat Mexicana SA de CV (IMEXSA) pelletising plant is located at Lazaro Cardenas on the west coast of Mexico. It is the primary source of feed stock for the adjacent direct reduction (DR) plants

    Jan 1, 1999

  • AUSIMM
    Electricity û Demand and Supply Conservation and the Environment

    Conservation and environmental issues are raising their profile with respect to both demand restraint and electricity supply options. In New Zealand, conservation pressures and energy efficiency need

    Jan 1, 1990

  • AUSIMM
    Contributions from Improved Surface Mine Haulage Road Design, Operation and Management Techniques to Sustainable Development

    Operating well designed and maintained surface mine haul roads is the key to minimising truck haulage costs - in itself a significant component of the total cost per tonne mined. Existing and proposed

    Jun 1, 2010

  • AUSIMM
    Process Control Integration into a Brownfields Iron Ore Plant as Applied to the Khumani Iron Ore Mine

    By D Matthews

    With a brownfield project comes control integration challenges. The Khumani Iron Ore Mine’s second phase expansion posed a number of challenges as there was substantial brownfields work conducted. The

    Jul 11, 2011

  • AUSIMM
    A Preliminary Geotechnical Assessment for Re-Opening the Blackwater Mine

    By J Taylor, L Richards, M McKenzie

    When a collapse in its services shaft caused rapid gas build up and its premature closure in. 1951, the Blackwater Mine at Wiauta was in full production with significant ore reserves yet to be mined.

    Jan 1, 1996