Search Documents

  • AUSIMM
    Python Underground Processing Plant Critical Design

    Python Underground Processing Plant Critical Design The use of continuous gravity recovery in combination with a controlled breakage fine crushing and screening system followed by flash flotation has

    Sep 13, 2010

  • ISEE
    Air overpressure Prediction Equation for Construction Blasting

    By Calvin Konya, Anthony Konya

    State and Federal construction specifications require the Blasting Contractor to prepare a Master Blasting Plan which is reviewed by the Owner’s Representative. The Master Blasting Plan requires the

    Jan 1, 2015

  • CIM
    The Midas Pond Gold Prospect, Victoria Lake Group, Central Newfoundland: A Mesothermal Quartz Vein System with Epithermal Characteristics

    By Derek H. C. Wilton, David T. W. Evans

    "Abstract - The Midas Pond gold prospect, central Newfoundland, is hosted by sheared and altered felsic and mafic pyroclastic rocks of the Tulks Hill volcanics, Victoria Lake Group, and has been trenc

    Jan 1, 2000

  • DFI
    Alternative Deep Foundation Solutions ? Dmm At Lpv-111 In New Orleans

    By Wesley Schmutzler

    The Deep Mixing Method (DMM) was employed to raise and support the LPV (Lake Pontchartrain and Vicinity) -111 Levee in New Orleans. Even using innovative technologies, the tight schedule to achieve t

  • CIM
    Operation of La Mine Doyon

    "At a current mining rate of 3,750 tons per day, La Mine Doyon is currently the largest gold mine in Canada. La Mine Doyon is an open pit gold mine located in the Abitibi area of Northwestern Quebec.

    Jan 1, 1984

  • AUSIMM
    Computer Simulation of Roadway Development to Support Longwall Mining

    Prefeasibility planning and cost estimation of conveyor systems has historically been undertaken by comparing fixed plant transport requirements to that of similar systems in service. This paper descr

    Dec 6, 2010

  • SME
    Roof Stability Studies In The Bear Mine, Somerset, Colorado; A Case History

    By Daryl E. Radcliffe, Raymond M. Stateham

    The Bureau of Mines, under a Cooperative Agreement with the Bear Coal Company, Somerset, Colorado, conducted a large scale evaluation of the effect of time lapse on roof stability. Time lapse in this

    Jan 1, 1982

  • CIM
    Hydraulic Hoisting & Long Distance Pumping of Coal

    By R. E. McElvain

    "Hydraulic transportation of solids in suspension with water or other carriers, such as oil is becoming more practical as economic situations develop with respect to the railroads and other carriers.

    Jan 1, 1978

  • TMS
    Structure Evolution of Aluminum Foams during Foaming Process

    By Zhuokun Cao

    Manufacture of aluminum foams still suffer from nonuniformity and poor reproductively for there is lack of basic knowledge of foaming process. In this paper, carbon fibers are used as novel stabilizin

    Jan 1, 2010

  • SME-ICGCM
    Utilization of the Hilti OneStep Rock Anchor at Twentymile Coal Company to Reduce the Overall Amount of Time for Face Stabilization During Longwall Recovery

    By Bill Stormes

    This paper will discuss implementation of the Hilti OneStep rock anchor technology to improve face bolting operations during the May 2008 longwall move; increase rock anchor installation capacity; and

    Jan 1, 2008

  • AUSIMM
    Flow Characteristics of Coal-Oil Slurries

    By L Barro

    There is currently a worldwide interest in coal-oil technology as the search continues for alternative energy sources to reduce the consumption of petroleum crude. An important aspect of this coal-oil

    Jan 1, 1980

  • SME
    An Improved Hydrometallurgical Route For Tellurium Production

    By A. Robles-Vega

    In recent years, tellurium has been extensively used in the manufacture of semiconductor materials. For this type of application, high-purity tellurium is required. Selenium, lead and silicon are usua

    Jan 1, 2009

  • SAIMM
    Development Of A Risk-Based Mine Closure Cost Calculation Model

    By A. du Plessis

    The study summarized in this paper focused on expanding existing South African mine closure cost calculation models to provide a new model that incorporates risks, which could have an effect on the cl

    Jan 1, 2006

  • AUSIMM
    The practical characterisation of ferrosilicon for dense medium applications

    By W Blair, J Bosman

    The measurement of ferrosilicon rheology and characterisation of the parameters that have a direct influence on medium rheology provide the basis for evaluating, comparing and selecting an appropriate

    Jul 24, 2017

  • SME
    Using Dynamic Anisotropy To Improve Resource Estimation

    By K. Zabrusky

    Estimation of high grade epithermal vein deposits can present challenges in correctly representing the continuity of grade within an undulating structure. One solution to this problem is to use dynami

    Feb 27, 2013

  • SME
    A Closer Look At The Geotechnical Properties Of St. Peter Sandstone

    St. Peter sandstone is very different from the minerals and rocks that have been studied extensively in mining. On the one hand, it is brittle as characterized by an unusually high friction angle and

    Feb 27, 2013

  • SME
    Washington, D.C. hosts 2013 RETC

    Every two years, industry leaders and practitioners of tunneling and underground construction gather at the Rapid Excavation and Tunneling Conference (RETC) to learn from their peers about the most re

    Sep 1, 2013

  • SAIMM
    Management Of Copper Pyrometallurgical Slags: Giving Additional Value To Copper Mining Industry

    By J. C. Carrasco, M. Sánchez, R. Jara, F. Marquez, F. Parada, R. Parra, J. Palacios

    In past years, Chile has been the largest copper producer in the world and for 2002 mining represented country average of 10 % of the GDP, accounting for 47 % of the total exportation. As copper sul

    Jan 1, 2004

  • AUSIMM
    Automated Train Ore Transport

    By J Fisher, M Castro, A Hariyadi

    The train haulage system being designed for PT Freeport Indonesia’s Grasberg Block Cave (GBC) will be located within the mine at an elevation of almost 3000 m above sea level on the west side of the i

    May 9, 2016

  • CIM
    Process Improvements at Placer Dome Campbell Mine

    By K. Norris

    "The Campbell mill has undergone numerous changes over the past 43 years. However the rate of change has increased significantly in the last 4 years. A new grinding circuit, carbon-in- pulp circuit, p

    Jan 1, 1992