Search Documents

  • SAIMM
    Modelling And Prediction Of Reactions Involving Metals, Slags And Fluxes

    By J. Lehmann, H. Gaye

    A brief review of Computational Thermodynamics software concerning the modeling and prediction of reactions involving metals, slags and fluxes is presented. Their application for various steelmaking t

  • NIOSH
    IC 7892 Analysis Of 494 Accidents, Open-Pit Iron-Ore Mines, Beneficiation Plants, And Shops Lake Superior District ? Summary

    By R. O. Pynnonen

    This publication presents a study by the Federal Bureau of Mines of 494 accidents in open-pit iron-ore mines, beneficiation plants, and shops of the Lake Superior district from March 1949 to June 1956

    Jan 1, 1959

  • NIOSH
    OFR-122-82 Study Of Parameters Which Influence The Energy Utilization Efficiency In The Grinding Of Gabbro Ores

    By S. Raghavan

    An investigation of the possibility of improving the grinding characteristics of a gabbro ore containing copper and nickel sulfides via a thermal shock treatment technique has been carried out. The re

    Jan 1, 1981

  • AUSIMM
    The Determination of Fe, Si and Al Content in Iron Ore Blastholes by Nuclear Logging

    By A Rojc, J Ronaszeki, C Smith

    Nuclear logging was tested for the in situ determination of Fe, Si, and Al in iron ore blastholes with field tests at the BHP Billiton Iron Ore, Mount Waleback Mine. Prompt gamma neutron activation an

    Jan 1, 2002

  • AIME
    Natural Gas Technology - Analysis and Prediction of Minimum Flow Rate for the Continuous Removal of Liquids from Gas Wells

    By R. G. Turner, M. G. Hubbard, A. E. Dukler

    Gas phase hydrocarbons produced from underground reservoirs will, in many instances, have liquid phase material associated with them, the presence of which can affect the flowing characteristics of th

    Jan 1, 1970

  • NIOSH
    OFR-133-83 Development Of Environmentally Attractive Leachants - Volume 1 - A Minitest For In Situ Uranium Leaching

    By Robert S. Schechter

    A minitest, consisting of an injection/production well and at least two observation wells designed to detect the arrival of injected fluid leached minerals, and nonideal flow, is considered in this re

    Jan 1, 1983

  • AUSIMM
    Measuring and Taking Notice of Orebody Variability – An Essential Ingredient for Reliable Plant Design

    By D David

    The majority of SAG and ball mill design methodologies are applied using a single design value for mill selection, such as the 80th percentile ball mill work index or SMC value. Inherent in the select

    Sep 7, 2015

  • SME
    Recovery Of Gold And Silver From Oxidation Leach Residues By Ammoniacal Thiosulphate Leaching

    By R. M. G. S. Berezowsky

    An atmospheric ammoniacal thiosulphate leach system was developed to recover gold and silver from residues of the ammoniacal oxidation leaching of sulphidic copper concentrates. Extractions of 88 - 95

    Jan 1, 1979

  • AUSIMM
    Precious Metal Exploration in the Longwood Range Southland

    The results of precious metal exploration carried out by Amoco Minerals New Zealand Limited over EL 33-137 in the Longwood Range, Southland, are described. Widespread gold and platinum in alluvial dep

    Jan 1, 1983

  • SAIMM
    New systems for geological modelling-black box or best practice?

    By C. Birch

    "A ‘geologically constrained’ orebody model has long been hailed as vital for a Mineral Resource statement that is compliant with the South African Code for Reporting of Exploration Results, Mineral R

    Jan 1, 2014

  • SME-ICGCM
    New Developments In Headed Rebar Ground Support (e1369dc5-cd64-41ac-8b6d-861d8d628824)

    By Roland C. Walker

    Traditional headed rebar has existed in the mining industry as a ground support product for many years. The head of a rebar bolt is most commonly produced by hot upset die forging. Upset die forging

    Jan 1, 2009

  • AUSIMM
    Near-Infrared Spectroscopy (NIRS) Sorting in the Upgrading and Processing of Skorpion Non-Sulfide Zinc Ore

    Near-Infrared Spectroscopy (NIRS) Sorting in the Upgrading and Processing of Skorpion Non-Sulfide Zinc Ore In 2008 Anglo American sponsored a research project at RWTH Aachen University to assess the

    Sep 13, 2010

  • SAIMM
    An Improved Dc-Arc Process For Chromite Smelting

    By J. P. W. Bennie, A. de Jong, G. M. Denton

    Mintek together with Middelburg Steel & Alloys, developed the DC arc furnace process for the production of ferroalloys with the expressed objective of smelting ore fines (<1mm) without the need for ag

    Jan 1, 2004

  • SME
    Installation Of 0.84 M (33 In) Cyclones On The Primary Grinding Circuit At Cyprus Sierrita Corporation

    By L. N. Hill

    The classifiers on the primary grinding circuit at Cyprus Sierrita have been upgraded from 0.66 m (26 in) diameter hydrocyclones to 0.84 m (33 in) diameter hydrocyclones. This has resulted in a 4.3 %

    Jan 1, 1994

  • DFI
    High Capacity Rock Anchors At The Bear Mountain Bridge

    By Frederick C. Rhyner

    This paper describes the design and construction of two high-capacity rock anchors to restrain a supplementary backstay for the Bear Mountain Bridge, which is a suspension bridge spanning the Hudson R

    Jan 1, 2010

  • ISEE
    Florida Mining Blast Vibration Study Part 2: Current Regulations in Florida

    By Tristan Worsey, Nathan Rouse

    The Florida legislature allocated funding for the Florida State Fire Marshal (FSFM) to review the applicability of the United States Bureau of Mines (USBM) Report of Investigations (RI) 8507 blast vib

    Jan 1, 2019

  • AUSIMM
    Comparison of Industrial Cyanide Destruction Processes

    Comparison of Industrial Cyanide Destruction Processes

    Sep 13, 2010

  • AUSIMM
    Advanced Jig Separation of Shredded Plastics

    Advanced Jig Separation of Shredded Plastics The authors have reported that the RETAC jig is very useful in separating relatively low density particles such as plastics, and demonstrated that highly

    Sep 13, 2010

  • SME
    San Vicente to 2nd Aqueduct Pipeline - Tunnel: Drill and Blast in Advance of an Open-Face Digger Shield

    By Brett Campbell

    The San Vicente to 2nd Aqueduct Pipeline?Tunnel project is a raw water conveyance tunnel linking the San Vicente Reservoir (SVR) to the 2nd Aqueduct Pipeline via Rancho Penasquitos Pressure Control Fa

    Jan 1, 2008

  • NIOSH
    RI 3361 Active List Of Permissible Explosives And Blasting Devices Approved Prior To June 30, 1937 - Permissible Explosives Tested Under Schedule 17C (11a67bab-754d-4cb8-8a65-6870535be26b)

    An active list of permissible explosives was published in December 1936 as part of Bureau of Mines Report of Investigations 3324, under the title "Active List of Permissible Explosives and Blasting De

    Jan 1, 1937