Search Documents

  • CIM
    Towards Optimum Value in Underground Mine Scheduling

    By Bryan M. Maybee

    The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground

    May 1, 2009

  • SME
    Myths In Grinding Mill Q.A. — Uncovering The Costs

    By V. Svalbonas

    The process of grinding mill quality assurance brings with it associated truths and myths. When the mill quality assurance process took its first great steps forward in the late 1970s and early 1980s

    Jan 1, 1999

  • NIOSH
    RI 6055 Metallurgical Studies Of Rhodonite Ores, Silverton District, Colorado (In Three Parts) 1. Beneficiation Tests To Produce Manganese Concentrates ? Summary

    By W. W. Agey

    The Bureau of Mines examined and tested the rhodonite deposits of the Silverton lead-zinc district, San Juan County, Colo., as a possible source of domestic manganese. Exploration and development work

    Jan 1, 1962

  • AUSIMM
    The Planning of Modern Colliery Development for the Steel Industry

    By Lonie W. M

    The rapid development of the Australian steel industry over the past twenty years has greatly increased the demand for coking coal from the collieries owned by the Broken Hill Proprietary Co. Ltd. and

    Jan 1, 1957

  • AUSIMM
    The Role of the Exploration Geologist in the Initial Establishment of Harmonious Landowner Relations

    Two events during the past decade have combined to effectively alter the role of the geologist working in Papua New Guinea. The gold boom of the 1980s resulted in a substantial increase in the gen

    Jan 1, 1991

  • NIOSH
    The Mineral Industry Of Other South Pacific Islands - British Solomon Islands (948c4a57-0485-44f0-8c54-7e4563c76591)

    By Walter C. Woodmansee

    The only reported mineral production in 1977 was small output of alluvial gold, valued at an estimated $54,320.2 In addition, marine shells are gathered for use in lime manufacture, although output wa

    Jan 1, 1981

  • SAIMM
    Analytical Hierarchy Process For Selection Of Roadheaders

    By O. Acaroglu

    Selection of the most suitable roadheaders (boom type tunnelling machines) for the galleries/tunnels to be excavated in certain rock and under known project conditions is important for avoiding proble

    Jan 1, 2006

  • CIM
    The use of wetlands for effluent polishing at Placer Dome, Campbell Mine

    By Benoit Bissonnette, David Gelderland

    "The Campbell Mine Constructed Wetlands has been in full operation, processing effluent from the water treatment plant of the mill circuit for the last two years.The overall results are extremely posi

    Jan 1, 2003

  • SME
    Design Risk Mitigations for Contract CQ028 of the East Side Access Project

    By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso

    INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p

    Jan 1, 2007

  • AUSIMM
    Metallographic Study of Heat-Treated Chrome Ore Briquettes

    By Tripathy A. K, Satapathy B. K, Nayak B, Mohanty J. N, Dey D. N

    The paper deals with the metallographic tudy of heat treated chromite and chromite-coke composite briquettes. The briquettes, prepared from chromite concentrate of Orissa Mines using molasses-lime, de

    Jan 1, 1987

  • NIOSH
    RI 7874 Fracturing Oil Shale With Explosives for In Situ Oil Recovery

    By J. S. Miller

    This report presents a complete coverage of results from Bureau of Mines preliminary research and the field application of explosive fracturing techniques to prepare oil shale for in situ recovery of

    Jan 1, 1974

  • AUSIMM
    Paringa Clean-up Practice

    The purpose of this paper is to describe briefly the clean-up procedure adopted at the treatment plant of Paringa Mining & Exploration Co. Ltd. at Kalgoorlie, Western Australia.A clean-up is carri

    Jan 1, 1941

  • SME
    Review of Issues Related to Cerchar Abrasivity Testing and Their Implications on Geotechnical Investigations and Cutter Cost Estimates

    By Jamal Rostami, Levent Ozdemir, Amund Bruland, Filip Dahl

    Cerchar Abrasivity Index (CAI) is one of the commonly used tests to evaluate rock abrasiveness for cutter life/cost estimations of TBM projects. There are at least 3 style machines, 2 different pin ha

    Jan 1, 2005

  • SAIMM
    Hatch Developments In Furnace Design In Conjunction With Smelting Plants In Africa

    By R. Sullivan, K. Joiner, B. Emery, M. de Vries, F. A. Stober, L. R. Nelson, J. M. A. Geldenhuis

    Keywords: Pyrometallurgy, smelting, converting, furnace design, furnace retrofit, high-intensity smelting, copper coolers, plate coolers, waffle coolers, tap-blocks, lower sidewall air-cooling, wall h

    Jan 1, 2006

  • AUSIMM
    Flow of Compressed Air in Pipes

    COMPRESSED air is held in high esteem by the mining engineer as a medium for the transmission of power. The transmission, however, is accompanied by a high percentage of loss. Of the total work done b

    Jan 1, 1918

  • CIM
    Hope Bay Project: Canada?s Premier Undeveloped Greenstone Gold Belt Nunavut Territory, Canada

    By Stephen P. Quin

    One of the most prospective undeveloped greenstone belts in Canada, the Hope Bay greenstone belt extends over 80km in a north-south direction and is between 7 and 20km wide. The belt lies on the arcti

    May 1, 2003

  • SAIMM
    The Thermophysical Properties Of Raw Materials For Ferromanganese Production

    By M. Ksiazek

    Keywords: Thermal conductivity, thermal diffusivity, flash method, specific heat capacity, manganese ore Manganese ferro-alloys manufacturing involves a combination of quality raw materials and an

    Jan 1, 2011

  • SME-ICGCM
    Effects of Specimen Age on the Uniaxial Compressive Strength and Moisture Content of Weak Coal Measure Rocks

    By Timothy Barton

    The uniaxial compressive strength (UCS) is the most fundamental measurement used in geotechnical rock characterization for mine design. While there are standardized procedures for how to conduct UCS

    Jan 1, 2008

  • CIM
    Horses for Courses – Tailoring Front End Design to Project Requirements

    By Paul Staples, Paul Messenger, Greg Lane

    "Every project is different. While “conventional” SAG and ball mill circuits will suit many projects, for others there are alternatives, which may produce improved outcomes. This paper examines partic

    Jan 1, 2008

  • SME-ICGCM
    A First Step in Developing Standing Roof Support Design Criteria Based on Ground Reaction Data for Pittsburgh Seam Longwall Tailgate Support

    By Thomas Barczak

    Roof support systems are designed for roof control to prevent unplanned falls. It sounds logical and has been the conventional thinking in support design since supports were first installed. In orde

    Jan 1, 2008