Laboratory Strength Testing of Coal from Selected Illinois SeamsBy E. Bane Kroeger
For many years, researchers around the world have been investigating coal pillar stability. Many have focused on trying to optimize the size of the pillars by examining stable and failed pillars in un
Jan 1, 2004
-
Strata Control Advances At Jim Walter Resources, Mining DivisionBy Eddie Martin
Jim Walter Resources, Mining Division, employs the retreat longwall mining system as the primary method of coal production. The strata control aspects of developing and maintaining roadways for retrea
Jan 1, 1988
-
An Analysis of Rock Failure Around a Deep Longwall Using MicroseismicsBy Keith Heasley
In this paper, a state-of-the-art, three-dimensional, full waveform, microseismic system was used to analyze the rock failure around a deep (> 750 in (2500 ft) of cover) bump-prone longwall panel. The
Jan 1, 2001
-
Method Of Selecting Suitable Types Of Powered Supports At Longwall FacesBy S. M. Hsiung
A model (support selection model) for the selection of suitable types of powered supports under various geological conditions is proposed. This model is developed by evaluating the support, performanc
Jan 1, 1988
-
Shear Bond Characteristics in Grouted Cable BoltsBy Jian Yong Chen
The results of a laboratory investigation of pullout tests conducted on grouted, plain cable bolts are reported. The main purpose of the study is to determine experimentally the shear bond stiffiess o
Jan 1, 2005
-
Change in Primary Roof Support System at Quarto Mining Company's Powhatan No. 4 Mine Results in Improved Safety, Productivity and CostsBy Michael J. Peacock
The Powhatan No. 4 Mine is located in southeastern Ohio along the Ohio River in Monroe County. The mine produces approximately 3.2 million tons of steam coal annually from the Pittsburgh No. 8 seam. T
Jan 1, 1986
-
Design Considerations For Angle BoltersBy Charles D. Albright
FMC built its first angle bolter in 1969. This was a single mast unit which could drill holes for conventional bolts or angle holes for installing roof trusses. From this drill we learned very quickie
Jan 1, 1982
-
Study of the Behavior for Backfilling Material in Room-and-Pillar Coal MiningBy Joao Felipe Costa, Jair C. Koppe, Andre Zingano, Cleber Gomes
"Run-of-mine Brazilian coal has high ash content and low calorific power. Therefore, the coal must be washed to achieve the power plant specifications for burning coal. A large amount of waste results
Jan 1, 2010
-
A Lineament Analysis Case Study of the Fola Coal Co., LLC. No. 2 Surface Mine, West VirginiaBy Paul L. Tyrna
The Fola Coal Co., LLC No 2 surface mine, located in Nicholas and Clay Counties, WV, exploits up to nine coal seams by contour, highwall, and mountain top removal mining methods. After encountering fa
Jan 1, 2001
-
Ground Control Worker Safety During Extended Cut MiningBy Roy H. Grau
The trend in underground room-and-pillar cod mining is to employ remote-control continuous mining machines to take extended cuts of 40 A or more. Roof fall safety hazards to the mine worker associated
Jan 1, 1997
-
Chemical Consolidation For Roadway Surrounding Rock - It's Theory And ApplicationsBy Jinhua Wang
Based on engineering examples and theoretical analysis, the mechanism of chemical consolidation for fractured roadway surrounding rock was discussed. The chemical consolidating materials and three con
Jan 1, 1996
-
Effect of Vertical Discontinuities on Roof Stability and Ground Control Challenge: A Case StudyBy Li Yang, Andre Cezar Zingano, Alberto Fronza
"Immediate roof control is very important to the security and stability of entries in coal mining. It is also the highest cost in the coal mining operation, and roof spalling is directly responsible f
Jan 1, 2017
-
Highwall Mining of Thick, Steeply Dipping Coal: A Case Study in Geotechnical Design and Recovery OptimizationBy David P. Conover, Jake Bain, Christopher M. Ross
"Highwall mining of thick (up to 100 ft) steeply dipping (20° or more) coal seams provides many challenges, both geotechnically and operationally because seam dips near or in excess of highwall mining
Jan 1, 2017
-
"Void Fill Techniques for Stabilizing Roof Conditions during LongwallShield Recovery"By Rusty Mchenry, Craig Dickerson, Robin L. Oldham
"It has been proven that longwall faces can be moved safely and efficiently. However, abutment pressures and poor ground control conditions can halt operations and be hazardous to coal miners. Recentl
Jan 1, 2015
-
Mechanism and Prevention Measure of Rib Spalling in 6.5 Meter High Caving Face in Thick Coal Seam with Undulated FloorBy Weidong Pan, Yinchao Yang, Baodong Zuo
Fully mechanized mining technology, with a large cutting height in thick coal seam, has been developed to be large-scale, mechanized, and intelligent. Furthermore, it is also superior to other mining
Jan 1, 2017
-
Management of Floor Heave at Bulga Underground Operations—A Case StudyBy Kudret Tutuk, Serkan Saydam, Sungsoon Mo
"This paper presents an overview of the floor heave management at the Glencore Bulga Underground Operations and investigates the contributing factors to the behaviour of the floor. The mine experience
Jan 1, 2018
-
An Assessment of Coal Pillar System Stability Criteria Based on a Mechanistic Evaluation of the Interaction between Coal Pillars and the OverburdenBy Guy Reed, Russell Frith, Kent Mctyer
"Coal pillar design has historically been based on assigning a design factor of safety (FoS) or stability factor (SF) to coal pillars according to their estimated strength and the assumed overburden l
Jan 1, 2016
-
Tekcrete Fast®: Fiber-Reinforced, Rapid-Setting Sprayed Concrete for Rib and Surface ControlBy Stephen C. Tadolini, Minova USA Inc., Peter S. Mills, David R. Burkhard
"Fiber-reinforced spayed concrete has been used for several years in civil and tunneling operations. Research conducted to reduce cure times and increase compressive and flexural strengths resulted in
Jan 1, 2017
-
An Integrated Approach to the Monitoring and Modeling of Ground MovementsBy A. Chrzanowski
The integrated approach to monitoring surveys is based on a simultaneous utilization of geodetic, photogrammetric and geotechnical measurements of displacements, tilts, strains and any other geometric
Jan 1, 1984
-
Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple SeamsBy Peter Zhang
"Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa
Jan 1, 2017