    Topography and Coal Seam Initial Stress Estimation: a Sensitivity Study

    By Jeffrey K. Whyatt

    Estimation of the initial vertical stress carried in a coal seam is an important first step in virtually all methods of evaluating the required size of pillars in coal mines. Such estimates are a triv

    Jan 1, 2011

  • SME-ICGCM
    Design and Field Testing of a Mobile Roof Support for Retreat Mining,

    By Robert R. Thompson

    Retreat pillar mining is highly productive but dangerous. The primary danger during pillar removal is premature caving of the roof. Because the safety of the miners is dependent on successfully contro

    Jan 1, 1986

  • SME-ICGCM
    Weak Claystone Floors And Their Implications To Pillar Design And Settlement (e297de16-ba6b-46bd-8383-22a15beca7b5)

    By Ross W. Seedsman

    The in situ behaviour of claystone floors associated with the Wallarah, Great Northern and Fassifem Seams has been studied using a comprehensive suite of stress and displacement monitors. The instrume

    Jan 1, 1992

  • SME-ICGCM
    Mapping Hazards With Microseismic Technology To Anticipate Roof Falls - A Case Study (ac4523c6-7bdb-4660-a1cb-20433a65c0ed)

    By Anthony Iannacchione

    As the amount of new fractured surfaces or "damaged rock layers" within roof rock increases, the stability of the rock mass decreases. While direct measurements of this phenomenon are not easily made,

    Jan 1, 2004

  • SME-ICGCM
    Development Of A Remote Reading Dual-Height Telltale System For Monitoring Mine Roof Deformation

    By David Bigby

    A remote reading dual height telltale system has been developed to provide mine management with early warning of impending roof failure. This system is a logical development from the visual dual heigh

    Jan 1, 2001

  • SME-ICGCM
    The Use of NDT Methods to Determine the Condition of Rockbolt Support During the Recovery of a Previously Flooded Coal Mine Roadway at Thoresby Colliery

    By Brian Clifford

    Thoresby Colliery is in the process of recovering an old roadway that was flooded following the closure of an adjacent mine. The aim is to re-use the roadway as a gate road for a longwall retreat pane

    Jan 1, 2002

  • SME-ICGCM
    Calculating the Mining-Induced Horizontal Deformation Indices

    By Krzysztof Tajdus

    In Europe, horizontal strain is a primary parameter for estimating building hazard resistance. Other measured indices, like curvature, are less important, since in most cases of European excavation de

    Jan 1, 2011

  • SME-ICGCM
    Analysis of Roof Falls at and Recommendation of Roof Control Plansfor Rofomex Posphate Mine

    By Jinsheng Chen

    For underground openings, many factors can cause roof failure and thus roof falls. The most common factors related to Mother Nature are weak roof lithology, geological structures, and an abnormal in-s

    Jan 1, 2011

  • SME-ICGCM
    Truss Bolting On-Cycle in Jane Mine Lower Freeport Seam

    By Ken Barish

    Jane Mine of the Keystone Coal Mining Corporation was started in 1962 and is in the Lower Freeport seas located in Armstrong County, Pennsylvania, approximately 45 miles northeast of Pittsburgh. The

    Jan 1, 1984

  • SME-ICGCM
    Laboratory Testing of Rib Straps

    By E. Bane Kroeger

    Rib failure is a hazard that has resulted in many injuries and fatalities in underground coal mines, especially in soft coal seams. Conventional rib control methods including rib boarding, shotcreting

    Jan 1, 2004

  • SME-ICGCM
    The Design of Room and Pillar Mining Systems in the UK

    By Graham Daws

    State of the Art Room and Pillar mining techniques have been employed at two coal mines in the UK in the last two years. This paper describes the design of pillars and rockbolted support systems for R

    Jan 1, 1998

  • SME-ICGCM
    Surface Structures Impacted By Subsidence From Pennsylvania Coal Mines, 2003 to 2008

    By Anthony T. Iannacchione

    Underground bituminous coal mining is a large and significant industry within the Commonwealth of Pennsylvania, and it has a legacy of environmental consequence. For example, in 2008, 13.5 acres (5.5

    Jan 1, 2011

  • SME-ICGCM
    Outbursts And Rockbursts In Coal Mines

    By Ian W. Farmer

    A description of the factors causing outbursts and rockbursts in coal mines is given. The mechanics of both outbursts and rockbursts can be described in terms of conversion of stored strain energy in

    Jan 1, 1988

  • SME-ICGCM
    Recent Innovations for Slope Development

    By Tim Burgess

    Patton Mining, LLC and J.H. Fletcher Company recently collaborated and mechanized the sometimes hazardous, and always labor intensive, process of installing standing steel supports during the construc

    Jan 1, 2011

  • SME-ICGCM
    Prediction of Roof Fall Rate in Coal Mines Using Fuzzy Logic

    By Ebrahim Ghasemi

    Roof fall risk is a common problem in coal mines, and it is generally unpredictable due to variability in geological and mining parameters. In this study, a new fuzzy logic model was developed to pred

    Jan 1, 2011

  • SME-ICGCM
    3D FEM Simulation For Fully Grouted Bolts

    By Khaled Morsy

    Most of the available numerical codes simulating the reinforcing effect of fully grouted bolt are accomplished by a series of bar elements which are connected along their length to the host rock by sh

    Jan 1, 2004

  • SME-ICGCM
    The Coal Mine Roof Rating (CMRR) A Practical Rock Mass Classification For Coal Mines

    By Gregory M. Molinda

    The U.S. Bureau of Mines has developed a rock mass classification system for coal mine roof control. The Coal Mine Roof Rating System (CMRR) evaluates the structural competence of mine roof using simp

    Jan 1, 1993

  • SME-ICGCM
    Further Improvements In The Roof Beam Tilt Method Of Gateroad Support Design

    By Peter Cain

    Twenty years of research into the design of permanent gateroad support (packs) in coal mines have resulted in two methods of pack design based on engineering principles. The first, the detached block

    Jan 1, 1993

  • SME-ICGCM
    Updating the NlOSH Support Technology Optimization Program (STOP) With New Support Technologies and Additional Design Features

    By Thomas M. Barczak

    The initial Support Technology Optimization Program (STOP), Version 1.0, was released at the 19th Gmund Control Conference. This original program has since been updated to Version 2.3 which was releas

    Jan 1, 2001

  • SME-ICGCM
    A Study on Geotechnical Risks in Interaction Between Open-Pit and Block Caving

    By Ezzeddin Bakhtavar

    There are several geotechnical challenges and risks inherent in the interaction between the open-pit and block cave mining environments. This is especially true when they have to work simultaneously f